Section J - 851 Hazard and Obstruction Removal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
851 HAZARD AND OBSTRUCTION REMOVAL
851.01 Service Required
Remove and/or stabilize hazards and obstructions.
851.02
Performance Standard Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
851.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
851.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
851(1) Logging Out (ML 3-5)
Mile
851(2) Logging Out (ML 2)
851(3) Danger Tree Removal
851(4) Danger Tree Removal
Each
851(5) Hazard or Obstruction Removal
851(6) Hazard or Obstruction Removal
Each
851.04 Acceptable Quality Levels
| Discription |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Utilization of Timber |
| Log lengths do not meet utilization standards (see SPS or Task Order) |
| N/A |
| 0 |
| N/A |
| Charge for loss of stumpage |
| N/A |
| Stump Heights |
| Exceed Specified Height by more than 6 inches |
| Exceed Specified Height by up to 6 inches |
| 0 per mile |
| 5 per mile |
| Rework if greater than 0 major defects * |
| Rework if greater than 5 minor defects * |
| Tree damage caused by Service Provider's operations |
| Damage to more than 30% of the tree bole |
| Damage to 30% or less of the tree bole |
| 0 per mile |
| 2 per mile |
| Remove or Treat |
| Treat |
| Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's Operations |
| Water will be diverted out of the drainage structure or system |
| 20% or less impeded, but water will stay in the channel. |
| 0 |
| 1 per mile |
| Rework |
| Rework if greater than 1 minor defects * |
| Marked Danger Trees and Snags |
| Any remaining snags or danger trees that were marked |
| Any remaining snags or danger trees that were not marked |
| 0 |
| 2 per mile |
| Rework |
| Assess and Rework |
| Hazards that interfere with the use of the road (rocks, logs, etc) (ML 3-5) |
| Unstable hazards that remain in the Clearing Limits |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Hazards that interfere with the use of the road (rocks, logs, etc) (ML 2) |
| Unstable hazards that remain within X distance of the Traveled way |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Log Out |
| Horizontal clearance - more than 20% not cleared to specified distance |
| Horizontal clearance - 20% or less not cleared to specified distance |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Vertical clearance -more than 20% not cleared to specified distance |
| Vertical clearance - 20% or less not cleared to specified distance |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| N/A |
| 0 |
| 0 |
| Suspend work until in compliance |
| N/A |
* Units have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.
851 Hazard Obstruction Removal (09/10/07) 2