832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc
DOC document 55 KB Posted
- Attached to
- Road Maintenance IDIQ Federal contract opportunity
- Solicitation number
- AG-046W-S-09-0025A
About this file
Section J - 832 Load Haul and Place Materials
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
832 LOAD, HAUL, AND PLACE MATERIALS
832.01 Service Required
Load, haul, and place material at designated sites.
832.02 Performance Standard
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and revegetation as ordered by the Contracting Officer.
832.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
832.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
B. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
832.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
832(1) Load, Haul, and Place Material
Cubic Yard
832(2)
Mile
832(3)
Lump Sum
832(4)
Hour
832.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Slopes |
| Unstable material left on slopes |
| Material left on slopes that can be stabilized and won't block drainages |
| 0 |
| 1 per mile |
| Remove |
| Remove or stabilize in place |
| Backslopes |
| Undercut backslope will result in destabilization of slope |
| Undercut backslope will not result in destabilization of slope |
| 0 |
| 0 |
| Repair and Stabilize |
| Revegetate if greater than 0 minor defects * |
| Ditches, inlet/outlet channels, streams and catch basins |
| water will be diverted out of the drainage structure or soil enters system |
| < 20% impeded, but water will stay in the channel. |
| 0 |
| 1 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Debris on Road (ML 4-5) |
| Any debris in traveled way |
| Debris in traveled way that may slow or impede traffic. |
| 0 |
| 0 |
| Rework |
| Rework if greater than 0 minor defects * |
| Debris on Road (ML 3) |
| Debris in traveled way that may impede traffic. |
| Debris in traveled way that may slow traffic. |
| 0 |
| 1 per mile |
| Rework |
| Rework if greater than 1 minor defects * |
| Debris on Road (ML 2) |
| Objects in traveled way that obstruct high clearance vehicles |
| Debris in traveled way that may impede high clearance vehicles |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
Placed Material
(Disposal Sites)
| Unstable material on designated sites. |
| N/A |
| 0 |
| N/A |
| Stabilize |
| N/A |
| Revegetation |
| No revegetation work done |
| Revegetation work incomplete |
| 0 per mile |
| 1 per mile |
| Rework if greater than 0 minor defects * |
| Rework if greater than 1 minor defects * |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| 0 |
| 0 |
| Suspend work until in compliance |
| Suspend work until in compliance |
* Forests have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.
832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04) 2
File details come from the government source that posted it. Updated .