803_SPS_F06_SNOW REM.doc
DOC document 55 KB Posted
- Attached to
- Road Maintenance IDIQ Federal contract opportunity
- Solicitation number
- AG-046W-S-09-0025A
About this file
Section J - 803 Snow Removal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
803 - SNOW REMOVAL
803.01
Service Required Remove snow from designated surfaces.
803.02 Performance Standard
Snow removal is complete when the surface is available and useable for all intended use, safe for the intended users, and will efficiently drain.
803.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
803.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Snow removal will be measured along the centerline of the roadway. Turnouts are considered incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: Snow removal will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
803.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 803 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
803(1) Snow Removal (Single Lane)
Mile
803(2) Snow Removal (Double Lane)
Mile
803(3) Snow Removal
Lump Sum
803(4) Snow Removal
Each
803.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Surface Damage |
| A loss of more than 10 CY/mile on agg surface roads or any damage on paved surfaces. |
| A loss of less than 10 CY/mile on agg surface roads or any damage on paved surfaces. |
| 0 |
| 1 per mile |
| Replace or recover lost material or repair damaged surface |
| Accept the loss of material or repair damaged surface |
| Drainage: Impeded flow for ditches, inlet/outlet channels, and catch basins |
| Water will be diverted out of the drainage structure or system |
| < 20% impeded, but water will stay in the channel. |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Remaining Snow depth |
| Exceed maximum depth by 2 inches for 100 feet of road and not to exceed 1 per mile |
| Exceed maximum depth by 2 inches for 50 feet of road and not to exceed 3 per mile |
| 0 |
| 3 per mile |
| Rework |
| Repair if greater than 3 minor defects * |
| Backslopes |
| Undercut backslope will result in destabilization of slope |
| Undercut backslope will not result in destabilization of slope |
| 0 |
| 1 per mile |
| Repair and Stabilize |
| Revegetate if greater than 1 minor defects * |
| Overwidth Plowing |
| Undefined edge of traveled way |
| N/A |
| 0 |
| N/A |
| Reshape as necessary |
| N/A |
| Underwidth Plowing |
| Too narrow for intended use |
| N/A |
| 0 |
| N/A |
| Widen as necessary |
| N/A |
| Damage to Structures and Appurtenances |
| Any Damage |
| Any Damage |
| 0 |
| 0 |
| Repair or Replace |
| Repair or Replace |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| 0 |
| 0 |
| Suspend work until in compliance |
| Suspend work until in compliance |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.
803 SNOW REMOVAL PERMIT (09/10/04) 2