803_SPS_F06_SNOW REM.doc

DOC document 55 KB Posted

Attached to
Road Maintenance IDIQ Federal contract opportunity
Solicitation number
AG-046W-S-09-0025A
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Section J - 803 Snow Removal

View the file

Other files for this federal contract opportunity

Other files attached to Road Maintenance IDIQ, newest first.
File Type Posted
FBO-Award-Notice.pdf PDF
AG-046W-S-09-0025A_road-maintenance-amend1a.pdf PDF
AG-046W-S-09-0025A_road-maintenance-amend1.pdf PDF
872_SPS_F06_SIGN MAINT.doc DOC document
861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc DOC document
841_SPS_F06_VEGETATION TREAT.doc DOC document
808_SPS_F06_TRAFFIC CONTROL.doc DOC document
800_definition_abbreviation.doc DOC document
842_SPS_F06_RDWY VEG MAINT.doc DOC document
801_quantity_measurement_terms.doc DOC document
807_SPS_F06_EQUIP RENT.doc DOC document
833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc DOC document
834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc DOC document
851_SPS_F06_HAZ OBSTRUCT REM.doc DOC document
813_SPS_F06_SPOT SURF.doc DOC document
881_SPS_F06_EQUIP MOB MOVE_pbsc.doc DOC document
832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc DOC document
AG-046W-S-09-0025A_road-maintenance-idiq.pdf PDF
811_SPS_F06_SURF MAINT.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

803 - SNOW REMOVAL

803.01

Service Required Remove snow from designated surfaces.

803.02 Performance Standard

Snow removal is complete when the surface is available and useable for all intended use, safe for the intended users, and will efficiently drain.

803.03 Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

803.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: Snow removal will be measured along the centerline of the roadway. Turnouts are considered incidental. Measurement will be to the nearest one-tenth (0.1) mile.

B. Double Lane Roads: Snow removal will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

803.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 803 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item

Pay Unit

803(1) Snow Removal (Single Lane)

Mile

803(2) Snow Removal (Double Lane)

Mile

803(3) Snow Removal

Lump Sum

803(4) Snow Removal

Each

803.06 Acceptable Quality Levels

Description
Major
Minor
Allowable Defects
Required Action
Defect
Defect
Major
Minor
Major
Minor
Surface Damage
A loss of more than 10 CY/mile on agg surface roads or any damage on paved surfaces.
A loss of less than 10 CY/mile on agg surface roads or any damage on paved surfaces.
0
1 per mile
Replace or recover lost material or repair damaged surface
Accept the loss of material or repair damaged surface
Drainage: Impeded flow for ditches, inlet/outlet channels, and catch basins
Water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel.
0
2 per mile
Rework
Rework if greater than 2 minor defects *
Remaining Snow depth
Exceed maximum depth by 2 inches for 100 feet of road and not to exceed 1 per mile
Exceed maximum depth by 2 inches for 50 feet of road and not to exceed 3 per mile
0
3 per mile
Rework
Repair if greater than 3 minor defects *
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0
1 per mile
Repair and Stabilize
Revegetate if greater than 1 minor defects *
Overwidth Plowing
Undefined edge of traveled way
N/A
0
N/A
Reshape as necessary
N/A
Underwidth Plowing
Too narrow for intended use
N/A
0
N/A
Widen as necessary
N/A
Damage to Structures and Appurtenances
Any Damage
Any Damage
0
0
Repair or Replace
Repair or Replace
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0
0
Suspend work until in compliance
Suspend work until in compliance

* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.

Intent and use: User to establish threshold for the acceptable level of quality.

803 SNOW REMOVAL PERMIT (09/10/04) 2