801_quantity_measurement_terms.doc

DOC document 28 KB Posted

Attached to
Road Maintenance IDIQ Federal contract opportunity
Solicitation number
AG-046W-S-09-0025A
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Section J - 801 Quantity Measurement Terms

View the file

Other files for this federal contract opportunity

Other files attached to Road Maintenance IDIQ, newest first.
File Type Posted
FBO-Award-Notice.pdf PDF
AG-046W-S-09-0025A_road-maintenance-amend1a.pdf PDF
AG-046W-S-09-0025A_road-maintenance-amend1.pdf PDF
803_SPS_F06_SNOW REM.doc DOC document
872_SPS_F06_SIGN MAINT.doc DOC document
861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc DOC document
841_SPS_F06_VEGETATION TREAT.doc DOC document
808_SPS_F06_TRAFFIC CONTROL.doc DOC document
800_definition_abbreviation.doc DOC document
842_SPS_F06_RDWY VEG MAINT.doc DOC document
807_SPS_F06_EQUIP RENT.doc DOC document
833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc DOC document
834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc DOC document
851_SPS_F06_HAZ OBSTRUCT REM.doc DOC document
813_SPS_F06_SPOT SURF.doc DOC document
881_SPS_F06_EQUIP MOB MOVE_pbsc.doc DOC document
832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc DOC document
AG-046W-S-09-0025A_road-maintenance-idiq.pdf PDF
811_SPS_F06_SURF MAINT.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 801 Quantity Measurement Terms

1.

U.S. Customary Units of measure are used in conjunction with these specifications.

2.

The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.

3.

All items, which are measured by the feet, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.

4.

A station when used as a definition of term or measurement will be one hundred feet, or a precise location along a survey line.

5.

Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.

6.

The term "ton" means 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.

7.

Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.

8.

Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes. The measured slope distance for the length will multiply width treated and converted to a standard 10,000 square yard or acreage value of the surface area treated.

9.

Measure square yard with horizontal longitudinal and traverse measurements.

10. The term "lump sum" when used in the Schedule of Items means the complete unit as required by or described in the contract.

11.

Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.