Amendment1.pdf

PDF 28 KB Posted

Attached to
Big Larch Water System Renovation Federal contract opportunity
Solicitation number
AG-03R6-S-10-0047
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Amendment No. 1

View the file

Other files for this federal contract opportunity

Other files attached to Big Larch Water System Renovation, newest first.
File Type Posted
Big Larch 11x17.pdf PDF
s100047_attachments.docx DOCX document
S-10-0047_short_solicitation.doc DOC document
S-10-0047_complete_solicitation.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 06/10/2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service Western Montana Acquisition Zone Building 24, Fort Missoula Missoula, MT 59804

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-03R6-S-10-0047

9B. DATED (SEE ITEM 11)

05/21/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return * copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation No. AG-03R6-S-10-0047 - Big Larch Campground Water System Rehabilitation, Lolo National Forest

Amendment issues reflected on page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RONALD B. PENROSE

Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. 1, dated 6/10/2010 AG-03R6-S-10-0047 Big Larch Campground Water System Rehabilitation/Lolo NF

The following questions came up during the pre-bid meeting held at the Big Larch Campground on June 3, 2010. Forest responses follow each question.

Are there any utilities on the site?

There are underground telephone and 220v power lines in or along the road between an old pump house building site and the host sites. On plan sheet #3 between approximately Station 1+00 and 2+21 existing lines are shown as “UGT” and will need to be located and avoided. Power comes to the old pump house overhead. The underground power line will also be encountered at the two RV sites where the lines come into the RV service pedestals. See plan sheet #10 detail “Water Service B3” for phone / elect pedestal locations. Septic tanks and small leach field lines are also in the vicinity of the RV pads. No other utilities are known to exist elsewhere onsite. Contractor is required to contact utility locate service. See note 12 of Drawing Sheet #2 General Notes and Specification Section 02221 3.1 A.1 and 2.

What is the pay unit on the pipe? The schedule shows linear feet of pipe but lump sum payment?

Payment will be by lump sum to construct the system as indicated on the drawings. Quantities shown are for reference only.

Do the old lines to be abandoned need to be sealed and capped?

No, there are no requirements in the Specifications or General Notes to cap lines. There is an unneeded note in one location on Sheet #6 at Water Service B1 indicating to cap the existing line. That Note may be disregarded.

Can the Contractor camp onsite?

The Contractor should notify the CO or COR if overnight camping is planned so the District personnel can be informed.

What should be done with brush or slash removed along the pipes’ path?

Section 02221 1.1 A. indicates work “includes all clearing, grubbing, site preparation, removal and disposal of debris from the excavation….all backfill, subgrade preparation, final grading site dressing and cleanup.” Section 02221 3.8 A. specifies “when work is complete: clear debris and finish the entire site to smooth, uniform slopes presenting a neat and workmanlike appearance.” There is no specific direction to the Contactor on what to do with debris after removal from site. At the COR’s discretion some logs and limbs may be scattered along the disturbed areas after re-grading to discourage the establishment of unintended walking paths and leave a more natural finished look.

Clarification and Correction Section 01010 - Summary of Work, 1.4 A.

1.4 A. Should be replaced and amended to read: During the construction period the Contractor shall have full access to the campground area. Public access to the boat ramp shall be maintained during the construction period. The Contractor shall plan work to avoid or minimize closure of the road accessing the boat ramp while working in the immediate area.

The campground is normally still available for public use after Labor Day without water service. Where it would be safe and not interfere with construction activities, the Forest Service would like to maintain some availability of camping spaces during the construction period.