Attachment_4_Project_Drawings.pdf

PDF 5 MB Posted

Attached to
BEAVERHEAD-DEERLODGE NATIONAL FOREST - Sullivan-Tenmile Trail Construction
Solicitation number
AG-0356-S-14-0031
Issued by

About this file

Attachment 4 Project Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 25 50 100 in feet

NORTH

SEYMOUR TRAILHEAD

SITE PLAN

CONSTRUCT NEW 5' WIDE

AGGREGATE SURFACE PATH WITH

PULLOUTS AS DIRECTED BY CO.

140' LENGTH

INSTALL NEW BULLETIN BOARD

WITH VISITOR REGISTER

CONSTRUCT NEW 600 SF

AGGREGATE SURFACE PAD

EXISTING ASPHALT

PARKING AREA

REMOVE SIGNS

REMOVE HITCH RAILS (2)

REMOVE LOADING RAMP

REMOVE FEED BUNK

EXISTING TOILET

TO REMAIN

REMOVE

CONCRETE

BARRIERS

(APPROX. 5)

EXISTING FENCE

TO REMAIN

EXISTING FENCE

TO REMAIN

EXISTING

TRAIL (TYP.)

EXISTING TREES (TYP.)

File details come from the government source that posted it. Updated .