Newsome Creek Rehabilitation Stormwater Pollution Prevention Plan (SWPPP)

For Construction Activities At:

Newsome Creek Reach 2 Stream Habitat Improvement Red River Ranger District, 416 USFS Dr.

Elk City, Idaho, 83525

SWPPP Prepared For:

USDA Nez Perce Clearwater National Forest Red River Ranger District, 416 USFS Dr.

Elk City, Idaho, 83525 Phone: 208-842-2245

SWPPP Prepared By:

Nez Perce Tribe DFRM Watershed Division Jarrod Crow Stephanie Bransford 416 West Main Stuite 2 Grangeville, ID 83530 Phone: 208-983-0675 Email: stephanieb@nezperce.org

SWPPP Preparation Date:

02 /06 /2017

Estimated Project Dates:

Project Start Date: 07/01/2017 Project Completion Date: 10/31/2017

Contents

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES1
1.1Operator(s) / Subcontractor(s)1
1.2Stormwater Team2
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING4
2.1Project/Site Information4
2.2Discharge Information4
2.3Nature of the Construction Activity5
2.4Sequence and Estimated Dates of Construction Activities6
2.5Allowable Non-Stormwater Discharges7
2.6Site Maps7
SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS8
3.1Endangered Species Protection8
3.2Historic Preservation8
3.3Safe Drinking Water Act Underground Injection Control Requirements9
SECTION 4: EROSION AND SEDIMENT CONTROLS9
4.1Natural Buffers or Equivalent Sediment Controls9
4.2Perimeter Controls10
4.3Sediment Track-Out11
4.4Stockpiled Sediment or Soil12
4.5Minimize Dust13
4.6Minimize the Disturbance of Steep Slopes13
4.7Topsoil13
4.8Soil Compaction14
4.9Storm Drain Inlets15
4.10Constructed Stormwater Conveyance Channels15
4.11Sediment Basins15
4.12Chemical Treatment15
4.13Dewatering Practices16
4.14Other Stormwater Controls16
4.15Site Stabilization17
SECTION 5: POLLUTION PREVENTION STANDARDS20
5.1Potential Sources of Pollution20
5.2Spill Prevention and Response21
5.3Fueling and Maintenance of Equipment or Vehicles21
5.4Washing of Equipment and Vehicles22
5.5Storage, Handling, and Disposal of Construction Products, Materials, and Wastes23
5.6Washing of Applicators and Containers used for Paint, Concrete or Other Materials25
5.7Fertilizers25
5.8Other Pollution Prevention Practices25
SECTION 6: INSPECTION AND CORRECTIVE ACTION26
6.1Inspection Personnel and Procedures26
6.2Corrective Action27
6.3Delegation of Authority27
SECTION 7: TRAINING28
SECTION 8: CERTIFICATION AND NOTIFICATION29
SWPPP APPENDICES30

Stormwater Pollution Prevention Plan (SWPPP) Newsome Creek Reach 2 Stream Habitat Improvement ii

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES

1.1 Operator(s) / Subcontractor(s)

Instructions (see definition of “operator” at CGP Part 1.1.a):

Identify the operator(s) who will be engaged in construction activities at the site. Indicate respective responsibilities, where appropriate. Also include the 24-hour emergency contact.

List subcontractors expected to work on-site. Notify subcontractors of stormwater requirements applicable to their work.

Consider using Subcontractor Agreements such as the type included as a sample in Appendix G of the Template.

Operator(s):

Insert Company or Organization Name:

Insert Name:

Insert Address:

Insert City, State, Zip Code:

Insert Telephone Number:

Insert Fax/Email:

Insert area of control (if more than one operator at site):

[Repeat as necessary.]

Subcontractor(s):

Insert Company or Organization Name:

Insert Name:

Insert Address:

Insert City, State, Zip Code:

Insert Telephone Number:

Insert Fax/Email:

Insert area of control (if more than one operator at site):

[Repeat as necessary.]

Emergency 24-Hour Contact:

Insert Company or Organization Name:

Insert Name:

Insert Telephone Number:

1.2 Stormwater Team

Instructions (see CGP Part 7.2.1):

Identify the staff members (by name or position) that comprise the project’s stormwater team as well as their individual responsibilities. At a minimum the stormwater team is comprised of individuals who are responsible for overseeing the development of the SWPPP, any later modifications to it, and for compliance with the requirements in this permit (i.e., installing and maintaining stormwater controls, conducting site inspections, and taking corrective actions where required).

Each member of the stormwater team must have ready access to either an electronic or paper copy of applicable portions of the 2012 CGP and your SWPPP.

Insert Role or Responsibility: Project Manager/ Inspector

Insert Position: Project Manager, Nez Perce Tribe Insert Name: Stephanie Bransford

Insert Telephone Number: 208-983-0675

Insert Email: stephanieb@nezperce.org

Insert Role or Responsibility: Contracting Administration

Insert Position: Contracting Officer Insert Name: Karen Ruklic

Insert Telephone Number: 208-983-5144

Insert Email: kruklic@fs.fed.us

Insert Role or Responsibility: Project Manager / Inspector

Insert Position: USFS Watershed Restoration Manager Insert Name: Anne Connor

Insert Telephone Number: 208-476-8235

Insert Email: aconnor@fs.fed.us

Insert Role or Responsibility: Contracting Officer Representative

Insert Position:

Insert Name:

Insert Telephone Number:

Insert Email:

Insert Role or Responsibility:

Insert Position:

Insert Name:

Insert Telephone Number:

Insert Email:

· [Repeat as necessary.]

SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING

2.1Project/Site Information
Project Name and Address

Project/Site Name: Newsome Creek Reach 2 Stream Habitat Improvement

Project Street/Location: Newsome Creek Road (FS 1858)

City: Elk City

State: Idaho

ZIP Code: 83525

County or Similar Subdivision: Idaho

Project Latitude/Longitude

45 º57’ 07.21'' N (degrees, minutes, seconds)

-115 º38 '44.67'' W (degrees, minutes, seconds)

Method for determining latitude/longitude:

|_| USGS topographic map (specify scale: )
|_| EPA Web site
|_| GPS

|X| Other (please specify): Google Earth

Horizontal Reference Datum:

|_| NAD 27 |X| NAD 83 or WGS 84 |_| Unknown

Additional Project Information Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? |_| Yes |X| No

If yes, provide the name of the Indian tribe associated with the area of Indian country (including the name of Indian reservation if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property:

The Nez Perce Tribe has interest in seeing the native fisheries restored in Newsome Creek and are active partners on this project. The project is entirely located on Forest Service lands, but is within the traditional lands of the Nez Perce. In the Treaty of 1855, the Nez Perce retained total fishing rights on all streams and rivers within the boundaries of the original 13.4 million acre reservation that extended outward to “all usual and accustomed places” such as Newsome Creek.

Are you applying for permit coverage as a “federal operator” as defined in Appendix A of the 2012 CGP? |X| Yes |_| No

2.2Discharge Information
Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? |_| Yes |X| No

Are there any surface waters that are located within 50 feet of your construction disturbances?

|X| Yes |_| No

Table 1 – Names of Receiving Waters
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 (note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters)

1. Newsome Creek

Table 2 – Impaired Waters / TMDLs (Answer the following for each surface water listed in Table 1 above)

Is this surface water listed as “impaired”?
If you answered yes, then answer the following:
What pollutant(s) are causing the impairment?
Has a TMDL been completed?
Title of the TMDL document
Pollutant(s) for which there is a TMDL
1.
|X| YES |_| NO
Sediment, Temperature
|X| YES |_| NO
South Fork Clearwater Subbasin Asses. And TMDL
Sediment, Temperature

Describe the method(s) you used to determine whether or not your project/site discharges to an impaired water: The 2012 Integrated Report (most recent for Idaho) was reviewed for Newsome Creek. Newsome Creek is listed as fully supporting all beneficial uses.

Table 3 – Tier 2, 2.5, or 3 Waters (Answer the following for each surface water listed in Table 1 above)

Is this surface water designated as a Tier 2, Tier 2.5, or Tier 3 water?

(see Appendix F) If you answered yes, specify which Tier (2, 2.5, or 3) the surface water is designated as?

1.
|_| YES |X| NO
2.3Nature of the Construction Activity
General Description of Project

Provide a general description of the construction project:

Newsome Creek Reach 2 has been diverted out of its historic channel as a result of past mining operations, negatively impacting the existing floodplain and riparian environment. The purpose of this project is to improve channel morphology and stream function utilizing as much of the restored valley bottom and floodplain as feasible and to increase fish habitat primarily through the use of stream habitat features (pools, riffles, glides, etc.) and large woody debris.

In general, the project consists of the following components: development and decommissioning of an access route: earthwork operations for construction of channel diversion structures, constructed channel segments, off-channel habitat, and floodplain swales; sod harvest, replant, and storage; construction of habitat structures; addition of floodplain roughness, logs, and slash; and coordination with the Forest Service Contraction Officer (Government) or their representative for dewatering and fish salvage, revegetation, and adherence to various site controls.

Size of Construction Project What is the size of the property (in acres), the total area expected to be disturbed by the construction activities (in acres), and the maximum area expected to be disturbed at any one time?

INSERT SIZE OF PROPERTY Approximately 7.8 acres INSERT TOTAL AREA OF CONSTRUCTION DISTURBANCES 7.8 acres INSERT MAXIMUM AREA TO BE DISTURBED AT ANY ONE TIME 7.8 acres

2.4 Sequence and Estimated Dates of Construction Activities

Instructions (see CGP Part 7.2.5):

Describe the intended construction sequence and timing of major activities.

For each phase of construction, include the following information:

· Installation of stormwater controls, and when they will be made operational;

· Commencement and duration of earth-disturbing activities, including clearing and grubbing, mass grading, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization;

· Cessation, temporarily or permanently, of construction activities on the site, or in designated portions of the site;

· Final or temporary stabilization of areas of exposed soil. The dates for stabilization must reflect the applicable deadlines to which you are subject to in Part 2.2.1; and

· Removal of temporary stormwater conveyances/channels and other stormwater control measures, removal of construction equipment and vehicles, and cessation of any pollutant-generating activities.

The construction sequence must reflect the following requirements:

· Part 2.1.1.1 (area of disturbance);

· Part 2.1.1.3.a (installation of stormwater controls); and

· Parts 2.2.1.1, 2.2.1.2, 2.2.1.3 (stabilization deadlines).

Also, see EPA’s Construction Sequencing BMP Fact Sheet at http://www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_seq)

Mobilization:

Mobilize equipment to site and prepare staging areas.

· Estimated start date for installation of stormwater controls is July 1, 2017

· Erosion and runoff controls for access route, and staging area include:

Earthwork:

Construction Access/Construction

· Estimated start date for installation stormwater controls is July 1, 2017

· Erosion and runoff controls for construction of access route and temporary floodplain access route work include:

· To be developed by Contractor (refer to specific controls in Section 4).

· Constructed channel includes excavation of existing ground within the historical floodplain.

· To be developed by Contractor (refer to specific controls in Section 4).

· Channel diversion structures will be required to divert water from existing channel into the designed channel alignment on the floodplain. Sediment control measures include:

· To be developed by Contractor (refer to specific controls in Section 4).

· Estimated removal date is October 31, 2017

Demobilization/Site Cleanup:

· Estimated start date for removal of is October 20, 2017.

· Erosion and runoff controls and demobilization include:

· To be developed by Contractor (refer to specific controls in Section 4).

· Estimated removal date is October 30, 2017.

2.5Allowable Non-Stormwater Discharges
List of Allowable Non-Stormwater Discharges Present at the Site
Type of Allowable Non-Stormwater Discharge
Likely to be Present at Your Site?
Discharges from emergency fire-fighting activities
|_| YES |X| NO
Fire hydrant flushings
|_| YES |X| NO
Landscape irrigation
|_| YES |X| NO
Waters used to wash vehicles and equipment
|_| YES |X| NO
Water used to control dust
|X| YES |_| NO
Potable water including uncontaminated water line flushings
|_| YES |X| NO
Routine external building wash down
|_| YES |X| NO
Pavement wash waters
|_| YES |X| NO
Uncontaminated air conditioning or compressor condensate
|_| YES |X| NO
Uncontaminated, non-turbid discharges of ground water or spring water
|_| YES |X| NO
Foundation or footing drains
|_| YES |X| NO
Construction dewatering water
|X| YES |_| NO

2.6 Site Maps

See Appendix A

SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS

3.1Endangered Species Protection
Eligibility Criterion

Under which criterion listed in Appendix D are you eligible for coverage under this permit?

|_| A |_| B |_| C |_| D |X| E

For reference purposes, the eligibility criteria listed in Appendix D for Criterion E are as follows:

Criterion E.
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site’s discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either:

i. a biological opinion that concludes that the action in question (taking into account the effects of your site’s discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or

ii. written concurrence from the applicable Service(s) with a finding that the site’s discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.

You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI.

Supporting Documentation Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows:

For criterion D, E, or F, attach copies of any letters or other communication between you and the U.S. Fish & Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities.

See Appendix K

3.2Historic Preservation
GCP Appendix E, Step 1

Do you plan on installing any of the following stormwater controls at your site? Check all that apply below, and proceed to Appendix E, Step 2.

|_| Dike |_| Berm |_| Catch Basin |_| Pond |_| Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, swale, etc.)

|_| Culvert |_| Other type of ground-disturbing stormwater control: Refer to descriptions in Section 4

GCP Appendix E, Step 2

If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? |_| YES |X| NO

· If yes, no further documentation is required for Section 3.2 of the Template.

· If no, proceed to Appendix E, Step 3.

GCP Appendix E, Step 3

If you answered no in Step 2, have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties? |X| YES |_| NO

If yes, provide documentation of the basis for your determination.

See Appendix L

4.1 Natural Buffers or Equivalent Sediment Controls

Buffer Compliance Alternatives Are there any surface waters within 50 feet of your project’s earth disturbances? |X| YES |_| NO

Check the compliance alternative that you have chosen:

|_| I will provide and maintain a 50-foot undisturbed natural buffer.

|_| I will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.

|_| It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore I will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.

|X| I qualify for one of the exceptions in Part 2.1.2.1.e. (If you have checked this box, provide information on the applicable buffer exception that applies, below.)

Buffer Exceptions Which of the following exceptions to the buffer requirements applies to your site?

|_| There is no discharge of stormwater to the surface water that is located 50 feet from my construction disturbances.

|_| No natural buffer exists due to preexisting development disturbances that occurred prior to the initiation of planning for this project.

|_| For a “linear project” (defined in Appendix A), site constraints (e.g., limited right-of-way) make it infeasible for me to meet any of the CGP Part 2.1.2.1.a compliance alternatives.

|_| The project qualifies as “small residential lot” construction (defined in Part 2.1.2.1.e.iv and in Appendix A).

|X| Buffer disturbances are authorized under a CWA Section 404 permit.

Authorized Activities:

Vegetated wood and brush fascine bank treatments, 10 structures, 775 linear feet Large wood structures, 10 structures, 225 linear feet Pool excavation in association with the large wood structures, 4 pools Add roughness to floodplain (4 acres) Transplant, plant and seed shrubs and forbs in riparian/floodplain area (4.2 total acres of seeding, 970 rooted plants coming from nursery plus 7,000 sedge plugs) |X| Buffer disturbances will occur for the construction of a water-dependent structure or water access area (e.g., pier, boat ramp, and trail).

4.2 Perimeter Controls

Instructions (see CGP Parts 2.1.2.2 and 7.2.10):

Describe sediment controls that will be used (e.g., silt fences, filter berms, temporary diversion dikes, or fiber rolls) to meet the Part 2.1.2.2 requirement to “install sediment controls along those perimeter areas of your site that will receive stormwater from earth-disturbing activities.”

Also see, EPA’s Silt Fence BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/silt_fences or Fiber Rolls BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/fiber_rolls

General

· Contractor shall maintain on site at all times adequate numbers of certified weed-free biodegradable straw wattles or certified weed-free straw bales to provide sediment control for all exposed surfaces in the event of rainfall in accordance with the SWPPP. Contractor shall be responsible for adhering to all conditions stipulated in the SWPPP including installation, maintenance, and removal (if not permanent) Best Management Practices (BMPs) for stormwater control in the event that precipitation is predicted or expected during the project work window.

Specific Perimeter Controls

Perimeter Control # 1 Perimeter Control Description

· INSERT DESCRIPTION OF PERIMETER CONTROL TO BE INSTALLED. INDICATE SPECIFIC CONTROLS THAT WILL BE INSTALLED AND MADE OPERATIONAL PRIOR TO EARTH DISTURBANCE

· INCLUDE COPIES OF DESIGN SPECIFICATIONS

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE PERIMETER CONTROL.

[Repeat as needed for individual perimeter controls.]

4.3 Sediment Track-Out

Instructions (see CGP Parts 2.1.2.3 and 7.2.10):

Describe stormwater controls that will be used to “minimize the track-out of sediment onto off-site streets, other paved areas, and sidewalks from vehicles exiting your construction site.”

Describe location(s) of vehicle exit(s), procedures to remove accumulated sediment off-site (e.g., vehicle tracking), and stabilization practices (e.g., stone pads or wash racks or both) to minimize off-site vehicle tracking of sediment. Also include the design, installation, and maintenance specifications for each control.

Also, see EPA’s Construction Entrances BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_entrance

Contractor shall provide measures to prevent construction vehicles from tracking sediment offsite or onto roadways where it is subject to washing into waterways, or wetlands; including gravel access pads, wheel wash stations, or other equally effective methods.

A primitive access route off NF-1858 (Newsome Creek Road) leads to the site, and the contractor shall accomplish all work carefully to minimize disturbance, and to take precautions to prevent damage to all roads including federal, city, state, and county roads during construction due to heavy vehicle loading.

Specific Track-Out Controls

Track-Out Control # 1

Track-Out Control Description

· INSERT DESCRIPTION OF TRACK-OUT CONTROL TO BE INSTALLED

· INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE TRACK-OUT CONTROL.

(Note: At a minimum, you must provide for maintenance that meets the following requirement in CGP Part 2.1.2.3.d: “Where sediment has been tracked-out from your site onto the surface of off-site streets, other paved areas, and sidewalks, you must remove the deposited sediment by the end of the same work day in which the track-out occurs or by the end of the next work day if track-out occurs on a non-work day. You must remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked-out sediment into any stormwater conveyance (unless it is connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water.”)

[Repeat as needed for individual track-out controls.]

4.4 Stockpiled Sediment or Soil

Instructions (see CGP Parts 2.1.2.4 and 7.2.10):

Describe stormwater controls and other measures you will take to minimize the discharge of sediment or soil particles from stockpiled sediment or soil. Include a description of structural practices (e.g., diversions, berms, ditches, storage basins), including design, installation, and maintenance specifications, used to divert flows from stockpiled sediment or soil, retain or detain flows, or otherwise limit exposure and the discharge of pollutants from stockpiled sediment or soil.

Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile.

General

· Contractor shall provide measures to prevent stockpile erosion during rain events or when the stockpile site is not moved or reshaped for more than 48 hours, by surrounding piles with compost berms, covering piles with impervious materials or other equally effective methods.

Specific Stockpile Controls

Stockpile Control # 1 Stockpiled Sediment/Soil Control Description

· INSERT DESCRIPTION OF STOCKPILE CONTROL TO BE INSTALLED

· INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE STOCKPILE CONTROL.

(Note: At a minimum, you must comply with following requirement in CGP Part 2.1.2.4.d: Do not hose down or sweep soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance (unless connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water.)

[Repeat as needed for individual stockpile controls.]

4.5 Minimize Dust

General

· If determined to be necessary by the Forest Service, Contractor shall provide a water truck to manage project area dust.

Specific Dust Controls

Dust Control # 1 - Water Truck

Water will be the primary dust control method utilized by the Contractor providing a water truck with a minimum 1,000 gallon capacity, 1990 model year or newer.

Installation

· Dust control will be maintained throughout the project lifespan and implemented at the project site when deemed necessary.

Maintenance Requirements

· Water will be applied to the project site if dust is visible or as requested by the US Forest Service.

4.6Minimize the Disturbance of Steep Slopes
4.7Topsoil/Vegetative Fill

General Vegetation in the project area will be identified and marked. Shrubs and sod that must be removed for construction will be transported and replanted on site.

Specific Vegetative Controls

Vegetative Fill # 1 – Shrub transplant

· Shrub material removed as a result of on-site construction activities will be salvaged by Contractor and replanted at marked sites.

Vegetative Fill # 2 – Sod Replant

· Removal and replanting of sod will occur at various locations throughout the site in areas identified by the Government

4.8 Soil Compaction

· Vehicles and equipment will be constrained to access route and the constructed haul routes and the areas of the floodplain and streambank containing construction features.

Specific Soil Compaction Controls

Soil Compaction Control # 1 - Temporary Access Routes

· The contractor will minimize disturbance of the surrounding areas by limiting travel to the approved temporary access routes and constructed haul route to the extent possible. The contractor will maintain all access routes to prevent erosion or travelway degradation.

Installation

· Temporary access routes will remain in-place throughout the construction period.

Maintenance Requirements

· During construction, all access routes will be maintained to prevent erosion and travelway degradation.

4.11 Sediment Basins

General Settling basins may be constructed, if needed.

Sediment Basin Controls Construct settling basins, if necessary when dewatering bypass channel.

Installation

· Basins will be separated from live water.

· The settling basins will not have outlets that discharge to the river or wetlands.

Maintenance Requirement

· The Nez Perce Tribe and USFS will monitor turbidity in the main channel. If turbidity is observed leaking from a settling basin, the basin will be sealed or moved. If these actions do not correct the problem, the settling basin will not be used.

4.13 Dewatering Practices

Instructions (see CGP Parts 2.1.3.4 and 7.2.10):

If you will be discharging stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, include design specifications and details of all dewatering practices that are installed and maintained to comply with CGP Part 2.1.3.4.

Contractor will develop of a Dewatering Plan by to be submitted to the Forest Service for approval.

Specific Dewatering Practices Be sure to include: use of temporary sandbag and silt curtain barriers for streambank work (only one area to be isolated at a time); temporary plugging of the downstream pond outlet; and plans for discharge of pumped water.

Dewatering Practice # 1 Dewatering Practice Description

· INSERT DESCRIPTION OF DEWATERING PRACTICE TO BE INSTALLED

· INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE DEWATERING PRACTICE

(Note: At a minimum, you must comply with following requirement in CGP Part 2.1.3.4: “With backwash water, either haul it away for disposal or return it to the beginning of the treatment process; and replace and clean the filter media used in dewatering devices when the pressure differential equals or exceeds the manufacturer’s specifications.”)

[Repeat as needed for individual dewatering practices.]

4.14 Other Stormwater Controls

IF APPLICAPABLE

Instructions:

Describe any other stormwater controls that do not fit into the above categories.

· INSERT GENERAL DESCRIPTION OF THE PROBLEM THIS CONTROL IS DESIGNED TO ADDRESS

Specific Stormwater Control Practices

Stormwater Control Practice # 1 Description

· INSERT DESCRIPTION OF PRACTICE TO BE INSTALLED

· IF APPLICABLE INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE STORMWATER CONTROL PRACTICE

[Repeat as needed.]

4.15 Site Stabilization

Instructions (see CGP Parts 2.2 and 7.2.10):

The CGP requires you to immediately initiate stabilization when work in an area of your site has permanently or temporarily stopped, and to complete certain stabilization activities within prescribed deadlines. See CGP Part 2.2.1. The CGP also requires that stabilization measures meet certain minimum criteria. See CGP Part 2.2.2. For your SWPPP, you must include the following:

Describe the specific vegetative and/or non-vegetative practices that will be used to stabilize exposed soils where construction activities have temporarily or permanently ceased. Avoid using impervious surfaces for stabilization whenever possible.

Also, see EPA’s Seeding BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/seeding Once you begin construction, consider using the Grading/Stabilization Activities log in Appendix H of the Template to document your compliance with the stabilization requirements in CGP Part 2.2

Site Stabilization Practice (only use this if you are not located in an arid, semi-arid, or drought-stricken area)

|X| Vegetative|X| Non-Vegetative
|_| Temporary|X| Permanent

Description of Practice – Microsite Topography and Floodplain Roughness

· Grass seeding.

· Clump planting and sod mats.

· Large Woody Debris.

Installation Seeding will occur in the late fall (October/November) upon completion of each Phase.

Sod will be salvaged and placed on the streambanks to reduce erosion potential.

Clump planting will occur along the stream channel and floodplain.

Maintenance Requirements

· Maintenance is not expected.

Description of Practice – Clump Planting

· Clump planting from available/suitable shrubs and sod mats within the construction limits will occur. Salvage and planting will be accomplished with an excavator and the clump shall be of sufficient size to maintain all the root system and contain adequate soil to enhance favorable growth. If possible, transplant locations will be identified and prepared prior to salvage.

· The Contractor will mark by flags or stakes the outer extent of each vegetative salvage location prior to construction for approval by the Contracting Officer.

· The contractor will salvage materials as described in the Supplemental Specifications.

Installation

· Clump planting and salvage will occur throughout the project.

Maintenance Requirements

· No maintenance is required.

Description of Practice – Seeding

· Broadcast seeding will occur on recently graded surfaces.

· Seeds will be sown at rate specified by seed mix.

Installation

· Seeding will occur/be completed at the end of the project.

Maintenance Requirements

· Seeded areas will be monitored by the USFS and Nez Perce Tribe.

Site Stabilization Practice (only use this if uncontrollable circumstances have delayed the initiation or completion of stabilization) (Note: You will not be able to include this information in your initial SWPPP. If you are affected by circumstances such as those described in CGP Part 2.2.1.3.b, you will need to modify your SWPPP to include this information.)

|_| Vegetative|_| Non-Vegetative
|_| Temporary|_| Permanent

Justification

· INSERT DESCRIPTION OF CIRCUMSTANCES THAT PREVENT YOU FROM MEETING THE DEADLINES REQUIRED IN CGP PARTS 2.2.1.1 AND/OR 2.2.1.2 AND THE SCHEDULE YOU WILL FOLLOW FOR INITIATING AND COMPLETING STABILIZATION

Description of Practice

· INSERT DESCRIPTION OF STABILIZATION PRACTICE TO BE INSTALLED

· NOTE HOW DESIGN WILL MEET REQUIREMENTS OF PART 2.2.2.1 OR 2.2.2.2, WHICHEVER APPLIES

· INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT DATES OF INITIATION AND COMPLETION OF NON-VEGETATIVE STABILIZATION CONTROLS (must be completed within 14 days of the cessation of construction)

Maintenance Requirements

INSERT MAINTENANCE REQUIREMENTS FOR THE STABILIZATION PRACTICE

[Repeat as needed for additional stabilization practices.]

SECTION 5: POLLUTION PREVENTION STANDARDS

5.1 Potential Sources of Pollution

Instructions (see CGP Part 7.2.7):

Identify and describe all pollutant-generating activities at your site (e.g., paving operations; concrete, paint, and stucco washout and waste disposal; solid waste storage and disposal).

For each pollutant-generating activity, include an inventory of pollutants or pollutant constituents associated with that activity (e.g., sediment, fertilizers, and/or pesticides, paints, solvents, fuels), which could be exposed to rainfall or snowmelt, and could be discharged from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges.

Construction Site Pollutants

INSERT TEXT OR USE TABLE BELOW, an example in the table has been provided

Pollutant-Generating Activity
Pollutants or Pollutant Constituents

(that could be discharged if exposed to stormwater) Location on Site (or reference SWPPP site map where this is shown)

Heavy Equipment on site
Petroleum products, fuel
Areas where equipment would operate; staging areas

[Include additional rows as necessary.]

5.2 Spill Prevention and Response

Contractor shall implement a spill prevention and response plan which includes procedures for stopping, containing, and cleaning up accidental spills, leaks, and other releases as well as procedures for notification. Contractor and responsible employees will be trained in the proper application and use of clean-up materials. Including:

a)Control and cleanup instructions for products on site.
b)Equipment and measures to be stored on site and used to contain spills.

Instructions (see CGP Parts 2.3 and 7.2.11):

Describe procedures you will use to prevent and respond to leaks, spills, and other releases. You must implement the following at a minimum:

· Procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases. Identify the name or title of the employee(s) responsible for detection and response of spills or leaks; and

· Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity consistent with Part 2.3.3.4c and established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302, occurs during a 24-hour period. Contact information must be in locations that are readily accessible and available.

Some projects/site may be required to develop a Spill Prevention Control and Countermeasure (SPCC) plan under a separate regulatory program (40 CFR 112). If you are required to develop an SPCC plan, or you already have one, you should include references to the relevant requirements from your plan.

Oil‐absorbing floating booms and other equipment, such as absorbent pads appropriate for the stream size, would be available onsite during all construction phases. Booms would be placed in a location that facilitates an immediate response to potential petroleum leakage.

Dry methods of cleanup will be used where possible, and the source of the spill will be eliminated.

Spill containment kits (including instructions for cleanup and disposal) adequate for the types and quantity of hazardous materials used at the site would be available at the work site.

Workers would be trained in spill containment procedures and would be informed of the location of spill containment kits.

Where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302 occurs during a 24-hour period, the National Response Center (NRC) at (800) 424-8802 or will be notified in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117, and 40 CFR Part 302, immediately. Within 7 calendar days of knowledge of the release, a description of the release, the circumstances leading to the release, and the date of the release will be provided.

Additional measures identified by the contractor.

5.3 Fueling and Maintenance of Equipment or Vehicles

Instructions (see CGP Parts 2.3.3.1 and 7.2.11):

Describe equipment/vehicle fueling and maintenance practices that will be implemented to eliminate the discharge of spilled or leaked chemicals (e.g., providing secondary containment (examples: spill berms, decks, spill containment pallets) and cover where appropriate, and/or having spill kits readily available.

Also, see EPA’s Vehicle Maintenance and Washing Areas BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/vehicile_maintain

· All construction equipment shall be staged in a location and manner to minimize air, soil and water pollution. All fuel and lubricants shall be stored in containers and areas that are in conformance with the Idaho State Department of Environmental Quality, NMFS and USFWS biological opinion terms and conditions, and local regulations. Machine fueling will occur a minimum of 150 feet away from live water.

Specific Pollution Prevention Practices

Pollution Prevention Practices Description All equipment used for in‐stream work would be cleaned of external oil, grease, dirt, and mud and leaks would be repaired prior to arriving at the project site. All equipment would be inspected before unloading at site. Any leaks or accumulations of grease would be corrected before entering streams or areas that drain directly to streams or wetlands. Drip pans would be used in staging areas if equipment is leaky, and the equipment would be fixed immediately. Equipment shall not have damaged hoses, fittings, lines, or tanks with the potential to release pollutants into any waterway.

Oil and oily waste will be recycled in accordance with federal and state requirements.

Gas-powered equipment with tanks larger than 5 gallons would be refueled in a vehicle staging area placed 150-feet or more from a natural waterbody or wetland, or in an isolated hard reach, such as an established road. Equipment used for in‐stream or riparian work would be fueled and serviced in an established staging area. When not in use, vehicles would be parked in the designated staging area.

Fuel storage will be in a secondary storage containment that holds 125% of the amount of stored material.

All vehicles and other mechanized equipment would be inspected daily for fluid leaks before leaving the vehicle staging and thoroughly cleaned before operation below ordinary high water, and as often as necessary during operation, to remain grease free.

A description of hazardous materials that would be used, including inventory, storage, and handling procedures would be available on-site.

Written procedures for notifying environmental response agencies would be posted at the work site.

Any waste liquids generated at the staging areas would be temporarily stored under an impervious cover, such as a tarpaulin, greater than 150 feet from water until they can be properly transported to and disposed of at a facility that is approved for receipt of hazardous materials.

Additional measures identified by the Contractor.

Installation

· All spill prevention practices will be implemented prior to commencing work and throughout the project.

Maintenance Requirements Equipment will be periodically inspected for leaks.

[Repeat as needed.]

5.4 Washing of Equipment and Vehicles

Instructions (see CGP Parts 2.3.3.2 and 7.2.11):

Describe equipment/vehicle washing practices that will be used to minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyances and directing wash waters to a sediment basin or sediment trap, using filtration devices, such as filter bags or sand filters, or using other similarly effective controls).

Describe how you will prevent the discharge of soaps, detergents, or solvents by providing either (1) cover (examples: plastic sheeting or temporary roofs) to prevent these detergents from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas.

Also, see EPA’s Vehicle Maintenance and Washing Areas BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/vehicile_maintain

All equipment shall be washed prior to mobilization to the Forest to minimize the introduction of foreign materials and fluids to the project site. All equipment shall be free of oil, hydraulic fluid, and diesel fuel leaks. To prevent invasion of noxious weeds or the spread of whirling disease spores, all equipment shall be power washed or cleaned to remove all dirt, plant parts and material prior to mobilization. Truck beds and dump boxes hauling to the project site shall also be cleaned prior to entering the Forest. It will be the Contractor's responsibility to insure that adequate measures have been taken. Equipment shall be inspected by the designated COR or Inspector prior to mobilizing to the Forest. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area.

Specific Pollution Prevention Practices

Pollution Prevention Practice # 1 Description

· INSERT DESCRIPTION OF PRACTICE TO BE INSTALLED

· IF APPLICABLE INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE POLLUTION PREVENTION PRACTICE

[Repeat as needed.]

5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes Instructions (see CGP Parts 2.3.3.3 and 7.2.11):

For any of the types of construction products, materials, and wastes below in Sections 5.5.1-5.5.6 below that are expected to be used or stored at your site, provide the information on how you will comply with the corresponding CGP provision and the specific practices that will be employed.

Also, see EPA’s General Construction Site Waste Management BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/cons_wasteman

5.5.1 Landscape Materials (stockpiled trees, shrubs and native material)

Material shall be stockpiled in the designated stockpile areas in a manner to prevent erosion to Newsome Creek.

Pollution Prevention Practice # 1 Natural materials used for implementation of aquatic restoration, such as large wood, gravel, and boulders, may be staged within the 100-year floodplain.

Any large wood, topsoil, and native channel material displaced by construction would be stockpiled for use during site restoration at a specifically identified and flagged area.

Any material not used in restoration, and not native to the site would not be stored in the 100-year floodplain.

Additional measures identified by the contractor.

Installation Erosion measures

5.5.3 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals

· Fuel storage and machine fueling will occur a minimum of 150 feet away from live water. Stationary power equipment, such as generators, within 150 feet of the water shall be diapered to prevent leaks. All power equipment within 150 feet of the water shall be inspected daily for fluid leaks and repaired. The Contractor must keep daily inspection reports in a diary.

A Spill Prevention Control and Countermeasure Plan (SPCC) must be provided by the Contractor if on-site temporary fuel tanks exceed 660 gallons or if the combined storage is above 1320 gallons Specific Pollution Prevention Practices

Pollution Prevention Practice # 1 Description

· INSERT DESCRIPTION OF PRACTICE TO BE INSTALLED

· IF APPLICABLE INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE POLLUTION PREVENTION PRACTICE

[Repeat as needed.]

5.5.4 Hazardous or Toxic Waste

Petroleum products covered under Section 5.5.3. 1.

If elemental mercury is found during project work, Contractor shall stop work in the immediate vicinity and contact the Inspector, CO, or COR, immediately.

5.5.5 Construction and Domestic Waste

(Note: Examples include packaging materials, scrap construction materials (ie. Culverts), masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or building materials.)

General

· Any construction debris and/or domestic waste that do not meet the site-specific waste disposal criteria shall be disposed of off-site at an approved landfill by the contractor.

Specific Pollution Prevention Practices

Pollution Prevention Practice # 1 Description

· INSERT DESCRIPTION OF PRACTICE TO BE INSTALLED

· IF APPLICABLE INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE POLLUTION PREVENTION PRACTICE

[Repeat as needed.]

5.5.6 Sanitary Waste

General

· A portable toilet shall be located on site for the project’s duration. Portable toilet shall be positioned on a level surface so that it cannot be tipped.

Specific Pollution Prevention Practices

Pollution Prevention Practice # 1 Description

· INSERT DESCRIPTION OF PRACTICE TO BE INSTALLED

· IF APPLICABLE INCLUDE COPIES OF DESIGN SPECIFICATIONS HERE

Installation

· INSERT APPROXIMATE DATE OF INSTALLATION

Maintenance Requirements

· INSERT MAINTENANCE REQUIREMENTS FOR THE POLLUTION PREVENTION PRACTICE

[Repeat as needed.]

SECTION 6: INSPECTION AND CORRECTIVE ACTION

6.1 Inspection Personnel and Procedures

Instructions (see CGP Parts 2.1.1.4, 2.3.2, 3.3.2, 4, 5, and 7.2.12):

Describe the procedures you will follow for conducting inspections in accordance with CGP Parts 2.1.1.4, 2.3.2, 3.3.2, 4, 5, and 7.2.12.

Personnel Responsible for Inspections

The Contractor will be responsible for ensuring the activities under Phases I, II, and III comply with the SWPP.

INSERT NAMES OF PERSONNEL OR TYPES OF PERSONNEL WHO WILL BE CONDUCTING SITE INSPECTIONS HERE

Note: All personnel conducting inspections must be considered a “qualified person.” CGP Part 4.1.1 clarifies that a “qualified person” is a person knowledgeable in the principles and practices of erosion and sediment controls and pollution prevention, who possesses the skills to assess conditions at the construction site that could impact stormwater quality, and the skills to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit.

The US Forest Service and Nez Perce Tribe will be responsible for ensuring that activities under Newsome Creek Reach 2 Stream Habitat Improvement comply with the SWPP. Primary designees:

Stephanie Bransford Jarrod Crow Jayme Stogsdill, USFS

Inspection Schedule Specific Inspection Frequency INSERT INSPECTION SCHEDULE BASED ON CGP PARTS 4.1.2, 4.1.3, OR 4.1.4, WHICHEVER APPLIES

Rain Gauge Location (if applicable) SPECIFY LOCATION(S) OF RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED (only applies to inspections conducted for Part 4.1.2.2, 4.1.3, or 4.1.4.2)

Inspection Report Forms

INSERT INSPECTION REPORT FORM(S) IN APPENDIX D

6.2 Corrective Action

Instructions (CGP Parts 5 and 7.2.12):

Describe the procedures for taking corrective action in compliance with CGP Part 5.

Personnel Responsible for Corrective Actions

INSERT NAMES OF PERSONNEL OR TYPES OF PERSONNEL RESPONSIBLE FOR CORRECTIVE ACTIONS

Corrective Action Forms

INSERT A COPY OF CORRECTIVE ACTION FORM(S) YOU WILL USE IN APPENDIX E

6.3 Delegation of Authority

Instructions:

Identify the individual(s) or positions within the company who have been delegated authority to sign inspection reports.

Attach a copy of the signed delegation of authority (see example in Appendix J of the Template.

For more on this topic, see Appendix I, Subsection 11 of EPA’s CGP.

Duly Authorized Representative(s) or Position(s):

Insert Company or Organization Name:

Insert Name:

Insert Position:

Insert Address:

Insert City, State, Zip Code:

Insert Telephone Number:

Insert Fax/Email:

SECTION 7: TRAINING

Instructions (see CGP Part 6 and 7.2.13):

Complete the table below to provide documentation that the personnel required to be trained in CGP Part 6 completed the appropriate training If personnel will be taking course training (which is not required as part of the CGP), consider using Appendix I to track completion of this training The following personnel, at a minimum, must be receive training, and therefore should be listed out individually in the table below:

· Personnel who are responsible for the design, installation, maintenance, and/or repair of stormwater controls (including pollution prevention measures);

· Personnel responsible for the application and storage of treatment chemicals (if applicable);

· Personnel who are responsible for conducting inspections as required in Part 4.1.1; and

· Personnel who are responsible for taking corrective actions as required in Part 5.

CGP Part 6 requires that the required personnel must be trained to understand the following if related to the scope of their job duties:

· The location of all stormwater controls on the site required by this permit, and how they are to be maintained;

· The proper procedures to follow with respect to the permit’s pollution prevention requirements; and

· When and how to conduct inspections,…