PreBidConferencePowerPoint.pdf
PDF 5 MB Posted
- Solicitation number
- AG-0343-S-16-0030
About this file
Conference Power Point Presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FeasibilityStudyAlt4PlanSheet.pdf | ||
| Amendment1Pages2_3.docx | DOCX document | |
| Amend1.doc | DOC document | |
| FeasibilityStudyAlt4PlanSheet.pdf | ||
| PreBidConferenceNotes.docx | DOCX document | |
| NewsomeReachMap.pdf | ||
| NewsomeCreekRFQ.doc | DOC document | |
| Reach2AerialPhoto.pdf | ||
| NewsomeRestPhotosReaches2345.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Newsome Creek Reach 2 Stream Habitat Improvement Design Pre-Bid Conference
April 19, 2016
Location
Objective Preparation of a channel & habitat design plan for
Stream Reach 2 Improve channel morphology & stream function Utilize as much of restored valley bottom and floodplain as feasible
Increase fish habitat within Reach 2 Stream habitat features (pool/riffle/glide), LWD
Past Implementation Phases 2011 – Reaches 5 & 4
• Selective dredge removal
• 30,000 cy
• LWD placement, construction of side channels and 2 meander bends
2012 – Reach 3
• Selective and complete dredge removal
• 14,400 cy
• LWD placement 2013-2015 – Reach 2
• Complete valley bottom dredge removal
• 113,043 cy
• Riparian planting of Reaches 5, 4, 3
• Topsoil spread on 6 acres
Adapted Floodplain Restoration Selective Dredge Removal Full Valley Bottom Removal
Floodplain Inundation Infrequent Annually
Floodplain Widths Newsome Floodplain Restoration
Reach Range of Width
Increase Average Width
Increase 4 5 - 10 7.5 3 57 - 84 37.65 2 59 - 190 109
Reach 4 Reach 2
Frequent Valley-Wide Floodplain Connectivity
Adaptive Management - LWD Original Design Structure Detail – LWD on Bend Only
Adapted Structure – LWD on Entire Channel
So What? Observed Benefits Stream Reach 5 & 4 Stream Reach 3 Increased habitat features due to LWD Increased habitat features due to LWD & floodplain interaction
Observed Benefits Stream Reach 5 & 4
Stream Reach 3 Increased side channels – physically constructed
Increased side channels – natural floodplain scour
Observed Benefits Stream Reach 5 & 4
Stream Reach 3 Localized floodplain interaction
Reach scale floodplain interaction
Spawning Gravel Recruitment
Floodplain connection now allowing for spawning gravel recruitment and sorting.
Nez Perce Tribe Hatchery Newsome Creek Spring Chinook Salmon Supplementation
92,384 juvenile (pre-smolt) released in 2015
Average of 72K pre-smolts released per year Fall release Do not tend to overwinter Survival low
Coordination on possibility of releasing some pre-smolts in restored habitat (upstream of acclimation facility)
Potential of outplanting adults within the restoration area
Pacific Lamprey Outplants 2015 outplant effort
50 adults 2015 monitoring
Juveniles located within mainstem Newsome
Collette Mine Restoration Project >3000 juvenile lamprey found in backwater pond Similar connected pond habitat in Newsome Working with crew to outplant adults near this type of rearing habitat
Beaver Expansion Using placed LWD as a foundation for building their dams
Have expanded from Reach 3 upstream to Reach 5
Increase in # of dams 3 dams to 11
Floodplain connection during low flow summer months
Creation of deep pools
| Restoring Fish Habitat in Newsome Creek |
| Location |
| Objective |
| Past Implementation Phases |
| Adapted Floodplain Restoration |
| Floodplain Widths |
| Frequent Valley-Wide Floodplain Connectivity |
| Adaptive Management - LWD |
| So What? Observed Benefits |
| Observed Benefits |
| Observed Benefits |
| Spawning Gravel Recruitment |
| Nez Perce Tribe Hatchery�Newsome Creek Spring Chinook Salmon Supplementation |
| Pacific Lamprey Outplants |
| Beaver Expansion |
File details come from the government source that posted it. Updated .