Amend_1_SF30.doc
DOC document 58 KB Posted
- Attached to
- Idaho Panhandle NF, Devils Elbow Campground Upgrade Federal contract opportunity
- Solicitation number
- AG-02RC-S-13-0050
About this file
SF-30 Amendment No. 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_1_WageDetern3.docx | DOCX document | |
| RFQ_DevilsElbowCampgrndConst.doc | DOC document | |
| DevilsElbowAppendixA.doc | DOC document | |
| DevilsElbowContractDwgs.pdf | ||
| DB_General_Decision_Number.docx | DOCX document | |
| WorkersCompForm.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
PAGE OF PAGES
AMENDMENT OF SOLICITATION OF CONTRACT
| 1 |
| 1 |
| 2. AMENDMENT NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| ONE |
| 6/28/2013 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA Forest Service
R1 IMAT
3815 Schreiber Way Coeur d'Alene ID 83815-8363 Contracting Officer
R1 IMAT
3815 Schreiber Way Coeur d'Alene ID 83815-8363
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
AG-02RC-S-13-0050
9B. DATED (SEE ITEM 11)
6/10/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| XX |
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers ___ is extended, _XX__ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. |
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| () |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Devils Elbow Campground Upgrade, Coeur d Alene River Ranger District Idaho Panhandle National Forests is hereby amended as follows:
Replace Wage Determination ID130063, dated 4/5/13, with the attached ID130063, dated 6/21/13.
Pen and Ink, ADD, Section 01010 Project Location:
The Falls Creek Pit is located on Road 2321, 13.1 miles from the Devils Elbow CG.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
RITA J. LOPER
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-10
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE
Prescribed by GSA
FAR (48 CFR) 53.24
Devil’s Elbow Campground Upgrade, Solicitation AG-02RC-S-13-0050
Questions/Clarifications
1.
Equipment Rental will be utilize as needed for miscellaneous work that is difficult to quantify during contract development and may increase due to changing forest conditions between the time of contract development and award. Work items may include disposal of stumps and fallen trees, minor grading and filling of depressions for drainage, and relocation of on-site barriers such as rocks and logs to prevent motor vehicles from off-road use. In general, equipment rental will be used for minor unforeseen work that is necessary to ensure that the campground is free from hazards, drains and functions properly and is aesthetically pleasing at the completion of the project. The hourly option items will be ordered and directed by the Contracting Officer if exercised.
2.
Unit post placards. There is an error in the size of the placard to fit that specific post. The size should be 3 ½” by 3 ½”. The color should be brown with cream numbers.
3.
Metal angles (for tables and benches) and the fee tube should be primed and painted in accordance with the painting specification in section 02725 – Fee Site, using the 133-60 Class A metal paint and primer. The color for all items should be a dark brown color for all items. The final color selection shall be done by the COR when the paint is approved and the colors for the approved paint are available.
4.
Use of straw waddles should meet the State and local laws for this site.
See Section 02540, Erosion Control Part 2 Materials. Certified Weed Free
5.
Regarding Key Personnel, can one person act in a dual role or does each position have to be filled by different individuals?
One person may act in dual/multiple roles.
Regarding rock for the picnic table pad? Plans say crushed aggregate and specs state round rock.?
¾ inch minus crushed aggregate, it has to be compacted to form a firm and stable surface.
7.
Campfire rings-specifically 02762a-1 ea 6ft group campfire ring, which Model No.manufactured by Pilot Rock is required for this application:?
11 inch model since the drawing shows a 12inch height or as approved by the Contracting Officer. Campfire rings also require black finish per the manufacuture or as approved per FAR 52.211-6 Brand Name or Equal (See Section L).
Amendment No. 1, dated 6/28/13
File details come from the government source that posted it. Updated .