Sheet2_generalnotes_1016.pdf
PDF 55 KB Posted
- Solicitation number
- AG-02RC-S-13-0036
About this file
Drawings Sheet 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30Amend.doc | DOC document | |
| Sheet4_fullrecon_1016.pdf | ||
| WageDeterm_SCA_WD95.docx | DOCX document | |
| FoodStorage2011Signed.pdf | ||
| Sheet3_1016scr.pdf | ||
| WorkersCompForm.docx | DOCX document | |
| Exhibit_1016_1054Bworklist.docx | DOCX document | |
| Exhibit_Rd1016_site8_heavybrush.JPG | JPG image | |
| Sheet5_1016ditchswalescarbrush.pdf | ||
| Exhibit_Rd1016_site18_culvert.JPG | JPG image | |
| Sheet1_1016_Cover11x17.pdf | ||
| PAST_PERFORMANCE_SURVEY.docx | DOCX document | |
| RFQ_1016RdDecomm.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
1. Disposal: All materials designated for removal are to be disposed of properly off of National Forest
System Lands in an environmentally safe manner in accordance with all Local, State, and Federal Regulations and section Removal of Structures and Obstructions.
2. Seeding/Mulch: Seed all disturbed areas done by the work conducted within the contract. Apply Mulch to Stream Channel Restoration Areas only. Mulch is applied as per Item 625. Straw bales supplied for erosion control can be used for mulch at Stream Channel Restoration areas following completion of work.
3. Culverts: All Culverts within the Project Work Area will be designated for Removal and Disposal.
4. Existing Vegetation: It is the Contractor's responsibility to protect as much of the trees and other vegetation as possible while working, unless within designated clearing areas. Any excavated vegetation will be utilized as slash placed on the decommissioned sections or as designated by the Contracting Officer.
5. Staking: Unless otherwise SHOWN IN THE DRAWINGS, staking will be done on the ground upon the request of the Contractor to the Contracting Officer within 5 working days of written request.
Contractor shall take reasonable precautions not to disturb flags or stakes.
6. Scarification of Truck Turn Around areas will be indirectly paid under Pay Item 210(15) for Scarification of Roadbed.
6' - 12' 5' MIN.
ROAD
CONSTRUCTION
AHEAD
3' MIN. DEPTH
MOUNTINGS
PORTABLE AND TEMPORARY
4x4 POST MOUNTING
TYPICAL SIGN INSTALLATION (AS PER MUTCD)
TEMPORARY TRAFFIC CONTROL & SIGN NOTES:
1. The Contractor shall have the responsibility for furnishing, installing, maintaining and removing construction warning signs in conformance with the latest revision of the Manual of Uniform Traffic Control Devices (M.U.T.C.D.).
2. Warning signs shall be installed prior to beginning of work AS SHOWN ON THE DRAWINGS and as designated by the Contracting Officer.
3. During periods of non-work (weekends, holidays, end of work day, etc.) all signs shall be covered or removed.
4. All warning signs shall be removed from the project by the Contractor upon completion and acceptance of the project.
5. Payment to the Contractor for furnishing, installing, maintaining, and removing construction warning signs is included in Pay Item 15701 Mobilization. No separate payment will be made.
6. Signs shall not be attached to trees or existing sign posts unless authorized by Contracting Officer in writing.
7. Signs shall be placed on the road side not more than 500 feet from activities when directed by the Contracting Officer.
8. "Home-made" signs shall not be accepted as approved construction warning signs.
Schedule of Items 1016 1054B
157(01) Mobilization 1 LS X X 157(02) Straw Bales 30 AQ X X 157(03) Soil Erosion 1 LS X X 210(01) SCR Cat. 1 7 EA 6 1 210(06) Ditch Relief 5 EA 5 210(08) Full Recontour 3520 LF X 210(09) Partial Recon 3250 LF X 210(11) Relief Swale 5 EA 5 210(12) Brushing 2.83 MI X X 210(15) Scarifying 1,280 LF X 625(08) Seed & Mulch 1 LS X X