Amendment 3 (Extends close to February 23, 2009)

View the file

Other files for this federal contract opportunity

Other files attached to Eight Fathom Cabin, newest first.
File Type Posted
amend_4.pdf PDF
amend_2.pdf PDF
amend_1.pdf PDF
sheet-9_foundation.pdf PDF
sheet-1_title sheet.pdf PDF
revised-Covr_RFP.pdf PDF
sheet-7_cabin floorplan.pdf PDF
sheet-8_cabin loft details.pdf PDF
sheet-10_counter.pdf PDF
revised-AG-0116-S-08-0057_eight-fathom-cabin_rymer.pdf PDF
sheet-6_cabin elevations.pdf PDF
sheet-5_section.pdf PDF
sheet-3_cabin site plan.pdf PDF
sheet-4_details.pdf PDF
sheet-14_bunk.pdf PDF
sheet-12_table.pdf PDF
sheet-11_shelf.pdf PDF
sheet-2_site plan.pdf PDF
sheet-13_bench.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Three (3) February 11, 2009

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Tongass National Forest Fed. Bldg., 648 Mission St.

Ketchikan, AK 99901

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0116-S-09-0020

Eight Fathom Cabin

9B. DATED (SEE ITEM 11)

01/20/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

This amendment contains:

Section 133400 – 2.03.Arevision, Section H.4 use of Premises revision, and additional responses to Contractor’s Questions.

This solicitation closing date and time is extended to February 23, 2009 at 2:00 pm.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Tonya Rymer, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AG-0116-S-09-0020 Eight Fathom Cabin Page 2 Amendment No. 3

Section 133400 – 2.03.A REVISION:

Add the following to the end of the specification section:

Provide and install heavy-duty snow stops to protect stove pipe and related mounting hardware. Stops to be as recommended by roofing manufacturer and installed in accordance with their installation instructions.

Section H.4 USE OF PREMISES Revision:

Add the following to the end of the specification:

f) The Forest Service will allow contractor use of the 8-Fathom mobile home camp located about 500’ north of the proposed cabin site for housing while work is proceeding on the project. Prior to using the facility, review and sign standard housing agreement regarding use of premises. The mobile home is provided on an as-is basis. Repair any damage to the facility that occurs from use by the contractor. Contractor to supply own propane, firewood and diesel fuel for electrical generator.

Question 1) Is there any snow stop requirement behind the skylights and stove pipe?

Answer: Yes, Refer to the Section 133400 – 2.03.A Revision listed above.

Question 2) Are there plans to replace the existing boardwalk with new materials?

Answer: No. There will be very limited repair of existing boardwalks using lumber materials.

Question 3) What size D-logs are prefered for the cabin?

Answer: The contract does not specify a particular milling pattern for wall timbers, such as D-logs. The size will be as proposed by the contractor as long as the structural requirements are met and stamped by the architect or engineer.

Question 4) Standard practice around Southeast Alaska requires concrete foundations to be below 32” grade for frost protection using a “big foot” and “sonah-tube”. The drawings show a concrete block on top of the sediment without a size minimum nor a depth requirement. What further details can you give us on the foundation?

Answer: Sheet #9, Cabin Foundation Details, shows a design concept for the foundation. It is not intended that this is the only acceptable foundation design. The contractor is responsible for submitting a foundation design for approval that meets the Structural Design Values shown in Section 011100 – 2.02.b, other requirements shown in the contract, and is stamped by a registered Architect or Engineer.

Question 5) Is there any requirement on the outhouse hole as far as erosion protection once the

AG-0116-S-09-0020 Eight Fathom Cabin Page 3 Amendment No. 3 hole is dug and the outhouse installed? If so, what are the retaining wall requirements?

Answer: The outhouse hole is intended to be dug in native earth as close to the dimensions shown as the ground stability will allow. There are no requirements for retaining walls.

Question 6) I’ve heard of an old FS cabin near the site. Is this cabin close, and if so, is it available for use during construction?

Answer: Yes, Refer to the Section H.4 Use of Premises revision listed above.

Question 7) Is the Forest Service providing funds for a “locate” to define the perimeter of the cabin and trail system?

Answer: See Sheet #2 for trail and outhouse staking. See Sheet #3 for cabin staking.

Other major site features such as the Stream Rehabilitation work shall be staked by the contractor for approval by the Government prior to beginning construction activities on those items.

Question 8) The elevation views on Sheet #6 show the stove pipe leaving the roof along the lower eave. Eight fathom gets a lot of snow so should a stove pipe exiting close to the ridge be the best solution to prevent snow load damage?

Answer: The stove pipe location will be as in the contract. The Forest Service will provide an additional set of pipe brackets for installation by the contractor to reinforce the installation.