This is a Test & Inspection Plan (TIP) document for the AFE Enclosure, a component of the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory. Document number AL-1880-6554, Revision A, was released March 31, 2026.

The TIP establishes the test and inspection process for assembling and verifying the AFE (Analog Front End) enclosure, which consists of three circuit boards (AFE Board A, B, and C), one backside board, two lids, and the main enclosure housing. The procedure requires 24 socket head screws (1/8") for board installation and 29 socket head screws (1/4") for lid attachment, along with supporting tools including torque screwdrivers, nut drivers, and SMA fittings. The inspection process includes visual examination for surface defects (scratches, dents, rust, oxidation), verification of proper coating application, confirmation of correct labeling and part numbers (AL-1809-0328 for enclosure, AL-1809-0361 for lids), and validation of X and Y axis engravings. The fitment check verifies that all components install correctly and all screws can be easily secured without obstruction. Testing requires a verification signoff sheet capturing serial number, test dates, tester name, and completion sign-off by an entity independent of the assembly technician. All test steps must be documented with PASS/FAIL results and photographic evidence of installed boards.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFE ENCLOSURE TIP

RELEASE DATE : 2026-03-31

AUTHOR:

DOCUMENT NUMBER: AL-1880-6554 REVISION: A

DOCUMENT STATUS: RELEASED

DOCUMENT TYPE: TEST & INSPECTION PLAN (TIP)

CATEGORY CODE: LS1514

O ffi ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, D

C C

A ut h K ey : 8

7R

BY

ED

RQ

K

Downloaded by: Windchill Watermarker

AL-1880-6554 REV.A Doc.Status:RELEASED Page 2 of 11

TABLE OF CONTENTS

1 Approvals 2 2 Abbreviations and Acronyms 2 3 Introduction 3 4 Reference 3 5 Hardware required 3 6 Procedure 5

6.1 Setup 5

6.2 Inspection 5

6.2.1 Visual Inspection 5

6.2.2 Fitment Check 5

6.3 Verification 8

Verification Signoff Sheet 9

REVISION HISTORY

Rev. CM Number Description of Change

A Baseline

1 APPROVALS

The following individual(s) shall approve this document:

Approver Project Role

Changchun Sun CAM (Level 5)

Jonah Weber Instrumentation Technical Lead

Jiani Niu QA Manager

The following individual(s) reviewed this document:

Reviewed By : barnardv

2 ABBREVIATIONS AND ACRONYMS

Advanced Light Source

Lawrence Berkeley National Laboratory

All officially released LBNL documents are watermarked and contain LBNL Document Control

Center release information in the lower-left corner of the document's pages

Printed hard copies of this document are for reference only.

ALS Advanced Light Source ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 3 of 11

3 INTRODUCTION

This document defines the test and inspection process for the AFE enclosure..

4 REFERENCE

5 HARDWARE REQUIRED

REF QTY

AFE BOARD A 1

AFE BOARD B 1

AFE BOARD C 1

AFE BACKSIDE BOARD 1

AFE Lids 2

AFE ENCLOSURE 1

1-72 Socket Head Screw (for AFE Boards) 1/8” 24

1-72 Socket Head Screw (for AFE Lids) 1/4” 29

All officially released LBNL documents are watermarked and contain LBNL Document Control

ALS-U Advanced Light Source Upgrade

AFE Analog Front End

AFE Lid AL-1809-0361

AFE Enclosure AL-1809-0328

AFE Board A AL-1731-6642

AFE Board B AL-1760-5393

AFE Board C AL-1871-9932

AFE Backside Board AL-1880-0239 ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 4 of 11

Large Cage Pins 4

Small Cage Pins 7

Torque Screw Driver 1

NUT DRIVER 1

SMA FITTING 1

SMA PIN 1

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 5 of 11

6 PROCEDURE

6.1 Setup

1. Enter the following information on the Verification Signoff Sheet:

a. SERIAL NUMBER

b. START DATE

c. TIP NUMBER AND REVISION

d. TESTER(S) NAME

6.2 Inspection

6.2.1 Visual Inspection

1. Inspect for scratches, dents, deformations, rust, or oxidation.

2. Check that all sharp edges are removed.

3. Verify that the coating was properly applied. (i.e. There’s no flaking or patches)

4. Verify that the enclosure is labeled with the correct AL#. (AL-1809-0328, Rev_)

5. Verify the X and Y axis are engraved to the side of the AFE enclosure. (Figure 1)

6.2.2Fitment Check

1. Load AFE Board A, B, and C into the deeper side of the AFE enclosure. (Figure 2)

a. Use 1-72 socket head screws ⅛” and screwdriver to tighten down the three boards.

b. Verify all screws can be easily secured to the enclosure.

2. Load the AFE backside board on the shallow end of the AFE enclosure. (Figure 3)

a. Use 1-72 socket head screws ⅛” and screwdriver to tighten down the three boards.

b. Verify all screws can be easily secured to the enclosure.

3. Verify that the AFE Lids are labeled with correct AL#. (AL-1809-0361)

4. Attach the AFE Lid to the enclosure using 1-72 head screws ¼”.

5. Repeat for the other side of the enclosure.

6. Verify all screws can be easily secured to the enclosure.

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 6 of 11

Figure 1

Figure 2

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 7 of 11

Figure 3

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 8 of 11

6.3Verification

1. On the Verification Sign Off Sheet, verify that the TESTER has entered the following information: SERIAL NUMBER, TEST START DATE, TIP NUMBER AND REVISION, TESTER(S) NAME and TEST COMPLETION DATE.

2. Verify that the serial number on the front panel matches the serial number on the

Verification Sign Off Sheet.

3. On the Verification Sign Off Sheet, verify that all test steps have been completed.

4. On the Verification Sign Off Sheet, sign and date the COMPLETION TEST AND

INSPECTION VERIFIED BY line.

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 9 of 11

Verification Signoff Sheet

VERIFICATION MUST BE DONE BY AN ENTITY OTHER THAN THE ASSEMBLY

TECHNICIAN

TEST START DATE: TEST COMPLETION DATE:

SERIAL NUMBER:

TIP NUMBER AND REVISION:

TESTER(S) NAME (Print, Sign and Date):

COMPLETED TEST VERIFIED BY (Print, Sign and Date):

Table 1 Verification Steps

Section

STEP #

DESCRIPTION RECORDED

INFORMATION

(As Noted)

TESTER

(Initial)

DATA

6.2.1

Step# 1

Inspect for scratches, dents, deformations, rust, or oxidation.

PASS/FAIL

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 10 of 11

6.2.1

Step# 2

Check that all sharp edges are removed.

PASS/FAIL

6.2.1

Step# 3

Verify that the coating was properly applied. (i.e.

There’s no flaking or patches).

PASS/FAIL

6.2.1

Step# 4

Verify that the enclosure is labeled with the correct

AL#. (AL-1809-0328,

Rev_)

PASS/FAIL

6.2.1

Step# 5

Verify the X and Y axis are engraved to the side of the

AFE enclosure.

PASS/FAIL

Table 2 Fitment check

Section

STEP #

DESCRIPTION RECORDED

INFORMATION

(As Noted)

TESTER

(Initial)

DATA

6.2.2

Step# 1b

Verify all screws can be easily secured to the enclosure. (AFE Board A,B, and C)

PASS/FAIL Insert photo of boards installed in enclosure

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

AL-1880-6554 REV.A Doc.Status:RELEASED Page 11 of 11

6.2.2

Step# 2b

Verify all screws can be easily secured to the enclosure. (AFE Backside

Board)

PASS/FAIL Insert photo of boards installed in enclosure

6.2.2

Step# 6

Verify all screws can be easily secured to the enclosure. (AFE Lid)

PASS/FAIL Insert photo of boards installed in enclosure

All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

1s t, C

A ut h K ey : 8

7R

BY

ED

RQ

1APPROVALS
2ABBREVIATIONS AND ACRONYMS
3INTRODUCTION
4REFERENCE
5HARDWARE REQUIRED
6PROCEDURE
6.1Setup
6.2Inspection
6.2.1Visual Inspection
6.2.2Fitment Check

6.3Verification

Verification Signoff Sheet