This document is a Department of the Air Force Commercial On-Base Lodging (COBL) Request for Information (RFI#3) Questions and Answers document dated 14 May 2025. The document provides detailed responses to 39 industry questions about an upcoming solicitation for commercial hotel management and development of Air Force lodging facilities. Key details include the Air Force's goal to bring as many lodging assets as possible up to "hard" brand standards, with flexibility for individual offerors to determine the best approach to meeting guest experience requirements. The government will provide detailed financial, occupancy, and facility condition information in a Document Room during Step 2 of the Request for Proposals (RFP).

The RFI reveals that the Air Force anticipates releasing the RFP in July or August 2025, with a 30-calendar day response window for Step 1. The solicitation will cover a diverse group of installations spread throughout the United States, representing various Major Commands and mission types. Offerors will be expected to propose hotel brands, amenities, and room configurations based on historical occupancy data. The Air Force will require separate developer and hotelier entities with no shared ownership, and will not provide guarantees but will offer oversight and asset management. Ancillary revenues from specific facilities defined under 10 USC Section 2871 can be included in proposal financials, and the project will require approvals through the Military Housing Privatization Initiative legislation.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Air Force Commercial On-Base Lodging (COBL)

Request for Information (RFI#3)

Questions and Answers

14 May 2025

Number Question Answer

1 Will the COBL office evaluate the management capabilities of a hotel brand operator by brands within specific STR segments and differentiate between select service and full-service offerings?

The Government will evaluate the management capabilities based on the evaluation factors outlined in RFP Section 4.6

2 Will the RFP include a list of the individual Air Force assets with a facilities matrix and hotel program for each asset to best determine brand fit based on amenities? Providing the property list with the hotel program and facilities matrix early in the process will allow for a hotel brand company to respond with a specific list of brand availability for each asset.

A preliminary overview of the assets at each installation will be provided at the Industry Forum and will be posted afterwards to SAM.gov. Detailed information on each building as well as financial statements and occupancy information will be provided in the Documents Room as part of Step 2 of the RFP.

Number Question Answer

3 Does the COBL office anticipate the need to soft brand certain assets like the PAL program “Historia Collection?”

The Air Force goal is to bring as many assets up to "hard" brand standards as possible. However, the Air Force realizes that may not be feasible or prudent for every asset. It will be up to each offeror how best to achieve the DAF's goals of providing the guest experience, service and amenities typically found in off-base hotels across the entire COBL portfolio.

4 Page 11, paragraph d.: In some cases, a fair amount of space inside lodging buildings is being used by other units on the base. Those “tenants” currently do not pay rent to the lodging program. A question to COBL could be, “For any retained use of space by other government entities within lodging facilities, will those entities be paying rent or other contributing to the maintenance and refurbishment of the space?”

In instances of retained use, no rent will be paid as the space is retained by the Government, however the Lessee and the Government will determine any pro rata cost sharing, as may be appropriate.

5 Page 15, paragraph h.: The government intends to have a “….direct relationship with the lessee, developer and the hotelier.” How is the government defining, and what is the contractual nature, of this “direct relationship?”

The Government intends to be able to directly engage with each party in the form of meetings, conversations, or written communication, without the need to go through the Lessee. For example, if the Air Force wishes to discuss a matter directly with the Hotelier, the Air Force expects to be able to call or email the Hotelier without first notifying or clearing the request through the Lessee.

6 Page 17, paragraph b. 1): Does the definition of the term “project” provided in this paragraph apply to every to use of the term through the RFP document? In other words, the Offeror (Lessee and brand/operator) must have, or have had, an equity interest in all projects presented as a required submittal in the proposal?

The Government will review for clarity the definition of the term Project within the RFP. The Government notes that the current RFP states that, for the development portion of the MERS: "a real estate asset development in which the Offeror has or had an ownership equity interest or was the developer of record."

7 What type of hotel product is the Government prioritizing—select-service, limited-service, extended stay, or full-service? Is there a preferred asset size?

The Air Force has a mix of travel types from short term Temporary Duty (TDY), training assignments, and extended stay Permanent Change of Station (PCS) travel for families moving to new installations. Details on historical occupancy for TDY and PCS travel will be provided as part of Step 2 of the RFP to assist Offerors in determining the best mix of product type to offer.

8 Does the Government have a preference for certain chain scales (e.g., upper-midscale vs.

upscale) within Appendix G’s brand list?

Appendix G will outline the specific list of allowable brands. The STR Chain Scales are publicly available any time on the Smith Travel Research website.

9 Will the Government accept proposals that include independent or soft-brand hotels, provided quality standards align with national brand equivalents?

The Air Force goal is to bring as many assets up to "hard" brand standards as possible. However, the Air Force realizes that may not be feasible or prudent for every asset. It will be up to each offeror how best to achieve the DAF's goals of providing the guest experience, service and amenities typically found in off-base hotels across the entire COBL portfolio.

10 Is the use of a single national brand across all installations preferred, or does the Government anticipate a diverse brand mix by location?

Each Offeror should determine what brands make the most sense to offer in the context of their proposal and describe why those brands were chosen and the value they contribute to the proposal.

11 Will DAF provide input on desired room mix (e.g., suites vs. standard rooms, King vs.

Queen-Queen configuration), or should Offerors determine based on historical occupancy?

The Offeror should determine the best room mix based on historical occupancy.

12 Are full-service hotel amenities such as restaurants, meeting space, or concierge services expected or encouraged at larger bases?

Consistent with the applicable provisions of the RFP, it is the responsibility of the Offeror to propose the amenities they intend to offer and are capable of offering.

13 Are there minimum standards for amenity offerings beyond those listed (e.g., fitness centers, pet-friendly policies, or EV charging stations)?

See Exhibit J of the Draft Lease in RFI #4 for the Minimum Hotel Standards

14 Are there any Government-provided tools or metrics available to estimate expected ADR and occupancy per installation?

As part of Step 2 of the RFP, the Air Force will release full historical financial information, occupancy, etc. A limited overview will be provided as part of the Industry Forum materials and posted to SAM.gov afterwards.

15 Please confirm the anticipated release date for the final Step One RFP. Will a minimum 30-day response window be provided?

The Air Force anticipates releasing the RFP in July or August 2025. 30 calendar days will be provided to respond to Step 1.

16 Will a standardized format or page limit be required for Step One Statement of Qualifications (SOQ) submissions?

Please refer to Section 4.3.1.b of the RFP for detailed submission instructions.

17 Can Offerors submit questions after the final Step One RFP is released, or is this the only opportunity for pre-solicitation inquiries?

The Air Force will add a Step One cutoff date for questions in the RFP. The RFP also includes a cutoff date for questions prior to submittal of Step 2 proposals.

18 For Offerors using a joint venture or teaming structure, will letters of intent suffice in Step One, or must the legal entity be formally established at time of submission?

Yes, letters of intent will suffice for Step One submissions, per Section 4.2.c of the RFP

19 Will Offerors be allowed to propose phased delivery or tiered development plans across Group A installations?

Yes, the Air Force anticipates that development will occur over a period of years. The RFP will ask Offerors to identify the scope they intend to deliver in specific increments of years to evaluate the ability to deliver new and renovated hotels swiftly.

20 Will DSCR modeling for Step Two proposals be evaluated based on stabilized (e.g., Year 5) breakeven metrics, or is Year 1 performance a key requirement?

Debt Coverage will be evaluated throughout the term of the mortgage.

21 Will revenue from ancillary services (e.g., EV charging, laundry, food/beverage) be counted toward total revenue in evaluation of sustainability?

Offerors should only include revenue from ancillary services specifically allowed in 10 USC Section 2871 and those listed under section 1.9.a of the RFP in their proposal. Offerors should describe their ability to deliver other ancillary services in the event that they become allowable in the future but should not include revenue from them in the proposal and pro forma.

22 Is there any flexibility in the 90% GSA per diem ADR cap for high-cost markets where feasibility may be constrained?

No, there will be no flexibility offered.

23 Will the Government provide facility condition assessments, as-builts, or environmental data to inform Offeror pricing and site selection decisions?

Yes, that information will be provided in the Document Room as part of Step 2 of the RFP.

24 What are the liability-related requirements in terms of insurance, permitting, and payroll compliance?

See Condition 28 of the Draft Lease in RFI#4 for insurance coverage requirements

25 Are there any reporting or oversight requirements? If so, what systems or tools will be used to track and monitor progress?

See Condition 31 (Reports) of the Draft Lease in RFI#4 for specific requirements related reports to be furnished to the Government. The Draft Lease in general also describes various Government oversight and approval requirements in multiple conditions/sections.

26 Will there be any guarantees associated with the project? And what type of support (technical, legal, or administrative) will be provided to help ensure its success?

The Government cannot offer any guarantees for this project. The Government will review all legal closing documents and participate in the establishment of the project. Post closing the Government will provide oversight and asset management for its own purposes to ensure legal compliance and effective operation of the project to further the Air Force goals.

27 Is there a defined schedule for disbursement for the fee-based payment structure?

See Exhibit K of the Draft Lease in RFI#4 for details on disbursement of fees.

28 Will there be any form of cost reimbursement associated with startup, operations, or capital improvements?

There will be a transition budget approved by the Air Force that will include allowable reimbursements to be paid at closing to include start up costs as well as environmental due diligence costs.

29 Is Appendix G referenced in the draft RFI 4.3.2(b(3) available as an attachment or a link?

Appendix G is intended to be released with the RFP to account for any changes up to that date made by Smith Travel Research. Appendix G will list hotel brands on the Smith Travel Research chain scales operating in North America that are below Luxury and above Economy on the chain scales. The STR Chain Scales are publicly available any time on the Smith Travel Research website. The Government notes it is considering amending Appendix G to those brands operating in the United States vice North America.

30 Section 1.1 f.- Will there be any OMB scoring parameters and congressional notification periods applicable to COBL? If so, it would be great to outline overall expectation.

Yes, all approvals and notifications required by the Military Housing Privatization Initiative legislation will be completed for this project. That includes a Congressional Notification prior to issuing the RFP, and OSD/OMB approval and Congressional Notification prior to executing the Lease.

31 Section 1.9 a.- It would be helpful if AF would definitively address what amenities outlined in this subsection would not directly compete or would be waived from NAF/MWR primacy for underwriting purposes.

Any ancillary facilities defined under 10 USC Section 2871, and/or specifically outlined in the RFP Section 1.9.a can be assumed to not compete with NAF/MWR primacy.

32 Section 4.3.2 b 1)- Do major renovation/repositioning projects qualify?

Yes, renovation/repositioning projects qualify.

33 Will the Government provide site-specific environmental assessments and facility condition reports pre-award to support risk underwriting?

The Air Force will provide available facility condition assessments and any known environmental conditions for each building/site as part of the Document Room that will be opened during Step 2.

34 If the project fails to close due to external agency decisions (e.g., OMB, OSD), will transition-related costs be recoverable?

If the project fails to close for any reason, the Air Force will not reimburse any expenses.

35 Will Offerors receive access to site-level financials, utility data, and demand/occupancy history in the document room?

Yes, that information will be available in the Document Room during Step 2.

36 Can ancillary revenues (e.g., from cafés or conference rentals) contribute toward financial performance metrics under the lease?

Revenues from Ancillary facilities specifically defined under 10 USC Section 2871, as well as the amenities listed in Section 1.9.a of the RFP can be included in the proposal and pro forma. Revenues from any other ancillary facilities or amenities should not be included in the proposal.

37 Is there flexibility in the "no shared ownership" rule between developer and hotelier if legal separation and governance independence are in place?

No, the Air Force will require the developer and hotelier to be separate entities with no shared ownership.

38 Can the Government clarify the specific installations included in Group A, and whether these are representative of a particular region, readiness tier, or property condition profile?

The list of installations in Group A is now included in the latest draft of the RFP posted to SAM.gov. The installations are generally spread throughout the United States, include installations from each Major Command / represent a variety of Air Force missions, and are of various property conditions and ages.

39 We respectfully request that the government clarify if the government anticipates asking the Hotelier to provide a third party to carry out the requirements that are associated with a PMO as part of their offering.

The Government does not anticipate asking the Hotelier to provide a third party to carry out the requirements that are associated with a PMO as part of their offering.