AF 813 FTQW 16-2602 ANG Meter Upgrade JLH.pdf
PDF 5 MB Posted
- Attached to
- Repair EMCS and Meters Federal contract opportunity
- Solicitation number
- W50S6K20B0004
- Issued by
- Department of the Army National Guard
About this file
This federal contract opportunity notice provides details for project number 16-2602 to repair EMCS and meters at Eielson Air Force Base in Alaska. The project scope includes replacing an outdated EMCS control system, installing advanced metering systems for building utilities, establishing isolated data network systems for DDC controls, and related work. Optional additions include underground utilities work and wireless network bridges. The contract is set aside for small businesses with a NAICS code of 238210 and size standard of $16.5 million average annual revenue. The estimated value is between $1 million and $1.5 million. A pre-solicitation notice will be issued on or around April 20, 2020, with pre-bid conference on May 15 and bid opening on June 1. Interested contractors must register in SAM and FedBizOpps for solicitation access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 200129 Eielson EMCS Type B Final_STAMPED.pdf | ||
| RCS 20-007 REMARKS PAGE.pdf | ||
| 200129_Eielson EMCS Type B Final SPECIFICATIONS_STAMPED.pdf | ||
| CMRA Updated Statement of Work and Information for Bidders.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Control Symbol
RCS:
REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS
INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).
SECTION I - PROPONENT INFORMATION
1. TO (Environmental Planning Function) 2. FROM (Proponent organization and functional address symbol) 2a. TELEPHONE NO.
3. TITLE OF PROPOSED ACTION
4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)
5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)
6. PROPONENT APPROVAL (Name and Grade) 6a. SIGNATURE 6b. DATE
SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY. (Check appropriate box and describe potential environmental effects + 0 U - Including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U= unknown effect)
7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)
8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)
9. WATER RESOURCES (Quality, quantity, source, etc.)
10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity-distance, bird/wildlife aircraft hazard, etc.)
11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)
12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)
13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)
14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)
15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)
16. OTHER (Potential impacts not addressed above.)
SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION
17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # ; OR
PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.
18. REMARKS
19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION 19a. SIGNATURE 19b. DATE (Name and Grade)
THIS FORM CONSOLIDATES AF FORMS 813 AND 814.
PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.
PAGE 1 OF PAGE(S) AF IMT 813, 19990901, V1
V1
AF IMT 813, SEP 99, CONTINUATION SHEET
PAGE OF PAGE(S)
375 Tanker Rd.
Alaska ANG-Repair EMCS & Meters
M -0
0-
.0
SY
M
BO
LS
AB
BR
EV
IA
TI
O N
S, D
ET
AI
LS
A
N D
SC
H
ED
U
LE
S
JA
N
U
AR
Y
, 2
SN
W
R R
W
AM
T
X:\4259500\161602.01\TECH\CAD\M-001.DWG
1/28/2020 7:21:53 PM
Eielson AFB, AK 99702-1740
SH
EE
T C
O N
TE
N
TS
D O
N O
T
SC
AL
E
D R
AW
IN
G S
M &H
N O
D
AT
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
IS
SU
ED
of
SH
EE
T
N O
C op yr ig ht
Th is d oc um en t, or a ny p or tio n th er eo f, sh al l no t b e du pl ic at ed , d is cl os ed
, o r u se d on a ny ot he r p ro je ct o r e xt en si on o f t hi s pr oj ec t ex ce pt b y w rit te n ag re em en t w ith
M ea d
H un t, In c.
M ea d
H un t s ha ll no t b e re sp on si bl e fo r a ny u na ut ho riz ed u se o f, or al te ra tio n to th es e do cu m en ts
M ea d an d H un t, In c.
N E
C as ca de s Pa rk w ay
Su ite
Po rtl an d, O R ph on e:
-5
-1 m ea dh un t.c om
EL
EC
TR
IC
M
ET
ER
(E
M ) S
C H
ED
U
LE
M
AR
K M
AN
U
FA
C
TU
R
ER
, M
O D
EL
N
U M
BE
R
VO
LT
AG
E
FR
EQ
U
EN
C Y
AC
C
U R
AC
Y
C O
M M
P O
R T
(2
C O
M M
P R
O
TO
C O
L
LO
C
AT
IO
N
R
EM
AR
KS
EM
-1
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
H
BO
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-1
H
BO
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
EM
-3
EL
EC
TR
O
-IN
D
U
ST
R
IE
S N
EX
U
S
0-
0V
H z
0.
5%
(1
ET
H
ER
N
ET
M
O D
BU
S
TC
P/
IP
SE
E
PL
AN
S
R
EM
AR
KS
(1
AP
PA
R
EN
T
PO
W
ER
(2
U N
IT
S
H
AL
L
BE
P R
O
VI
D
ED
W
IT
H M
IN
IM
U M
(2 ) I
N
TE
R N
AL
C
O M
M P
O R
TS
F
O R
P U
LS
E
O U
TP
U
T.
W
AT
ER
M
ET
ER
(W M
) S C
H
ED
U
LE
M
AR
K M
AN
U
FA
C
TU
R
ER
, M
O D
EL
N
U M
BE
R
SI
ZE
(IN
FL
U
ID
T
YP
E
D
ES
IG
N
PR
ES
S.
(P
SI
FL
U
ID
TE
M P.
F)
D
ES
IG
N
F
LU
ID
F
LO
W
R
AT
E
FL
U
ID
SP
EC
IF
IC
G R
AV
IT
Y
LO
C
AT
IO
N
R
EM
AR
KS
M
AX
M
IN
U N
IT
S
W M
-1
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(3
W M
-1
BA
D G
ER
, M
O D
EL
3/
W
AT
ER
0.
G
PM
BL
D
G
(2
W M
-1
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
W M
-3
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
W M
-3
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
W M
-3
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
W M
-3
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
W M
-3
BA
D G
ER
, T
U R
BO
W
AT
ER
G
PM
BL
D G
(1
R
EM
AR
KS
(1
PR
O
VI
D
E M
ET
ER
W
IT
H E
R
0-
LP
T O
TA
LI
ZE
R
A N
D R
AT
E
O F
FL
O
W
IN
D
IC
AT
O
R F
O R
C O
N N
EC
TI
O N
T O
D D
C S
YS
TE
M
(2
PR
O
VI
D
E M
ET
ER
W
IT
H H
R -E
-2
EN
C O
D
ER
A N
D R
AT
E
O F
FL
O
W
IN
D
IC
AT
O
R F
O R
C O
N N
EC
TI
O N
T O
D D
C S
YS
TE
M
(3
PR
O
VI
D
E M
ET
ER
W
IT
H E
R
0-
LP
T O
TA
LI
ZE
R
A N
D R
EM
O
TE
R
AT
E
O F
FL
O
W
IN
D
IC
AT
O
R F
O R
C O
N N
EC
TI
O N
T O
D D
C S
YS
TE
M . C
O O
R D
IN
AT
E R
EM
O
TE
R
AT
E O
F
FL
O W
IN
D
IC
AT
O R
L O
C
AT
IO
N
W
IT
H O
W N
ER
.C O
N D
EN
SA
TE
M
ET
ER
(C D
M ) S
C H
ED
U
LE
M
AR
K M
AN
U
FA
C
TU
R
ER
, M
O D
EL
N
U M
BE
R
SI
ZE
(IN
FL
U
ID
T
YP
E
D
ES
IG
N
PR
ES
S.
(P
SI
FL
U
ID
TE
M P.
F)
D
ES
IG
N
F
LU
ID
F
LO
W
R
AT
E
FL
U
ID
SP
EC
IF
IC
G R
AV
IT
Y
LO
C
AT
IO
N
R
EM
AR
KS
M
AX
M
IN
U N
IT
S
C D
M -1
BA
D
G
ER
, I N
D U
ST
R
IA
L
TU
R
BO
W
AT
ER
G
PM
BL
D
G
(1
R
EM
AR
KS
(1
PR
O
VI
D
E M
ET
ER
W
IT
H M
S-
ER
TO
TA
LI
ZE
R
P U
LS
E
TR
AN
SM
IT
TE
R
A N
D S
IX
-D
IG
IT
T O
TA
LI
ZI
N
G R
EG
IS
TE
R
F O
R C
O N
N
EC
TI
O
N T
O D
D C
S
YS
TE
M
BA
C
KF
LO
W P
R
EV
EN
TI
O N
D
EV
IC
E
SC
H
ED
U
LE
D
ES
IG
N
C O
N D
IT
IO
N S
IS
O
LA
TI
O N
V
AL
VE
S
M
AX
IM
U
M
SI
ZE
FL
O
W
PD
BO
D
Y
TE
M P
M
AW
P
LE
N G
TH
M
AR
K M
FR
, M
O D
EL
N
U M
BE
R
TY
PE
(IN
(G
PM
(P
SI
D
M
TL
TY
PE
M
TL
PO
R
TS
(F
(P
SI
G
(IN
2) R
EM
AR
KS
BP
D
-3
W
AT
TS
, L F9
M
BR
Z
(1 1)
BL
BR
Z (1
1) N
PT
.0
0.
.0
(3 1)
(3 2)
TY
PE
AB
BR
EV
IA
TI
O
N S
D O
U
BL
E C
H
EC
K
VA
LV
E
AS
SE
M
BL
Y W
IT
H
IN
TE
R M
ED
IA
TE
A
TM
O
SP
H
ER
IC
B R
EA
K
IA
W
A
SS
E-
BL
BA
LL
R
ED
U C
ED
P
R
ES
SU
R
E
ZO
N E
AS
SE
M
BL
Y
IA
W A
SS
E-
G T-
O
SY
G
AT
E, R
ES
IL
IE
N
T
SE
AT
, O
U
TS
ID
E
ST
EM
A N
D Y
O
KE
D O
U
BL
E C
H
EC
K
VA
LV
E
AS
SE
M
BL
Y
IA
W A
SS
E-
R
EM
AR
KS
(1 1)
LE
AD
F R
EE
(3 1)
PR
O
VI
D
E
IN
D
IR
EC
T
D R
AI
N
F R
O M
V
AL
VE
T
O D
R
AI
N L
O C
AT
IO
N
C O
N N
EC
T
D R
AI
N
T O
V
AL
VE
W
IT
H
A
IR
G
AP
(3 2)
SS
R
EL
IE
F
VA
LV
E
SE
AT
S
N C M
M
AI
N
BY
PA
SS
3/ 4"
1-
1/ 2"
3/ 4"
2"
3" 1" 2" 3"
4"
4" 6" 8"
W
AT
ER
S
ER
VI
C E
M
AI
N
BY
PA
SS
. P
IP
E
SI
ZE
P
ER
T
AB
LE
W A
TE
R
M
ET
ER
P
IP
IN
G (I
N
FO
R M
A
TI
O N
A L
O N
LY
N
O S
C
AL
E
C O
N D
U
IT
S
TO
TE
R
M
IN
AL
TO
P
VI
EW
B
A
PR
O
VI
D
E
BU
SH
IN
G O
N A
LL
C
O N
D U
IT
E
N D
S
PR
O
VI
D
E M
O U
SE
H
O
LE
A S
BO
TT
O M
IN
B
AS
E
(IN
B
O
TT
O M
SE
C
TI
O
N
IF
S
TA
C
KE
D
C O
N D
U
IT
D
EP
TH
S
H O
W N
IS
A
PP
R
O
XI
M
AT
E.
F
IE
LD
V
ER
IF
Y
TO
PR
O
VI
D E
SL
O
PE
IN
C O
N D
U
IT
A W
AY
F
R O
M B
U
IL
D
IN
G
PO
SI
TI
O
N H
AN
D
H O
LE
A
N D
C O
N D
U
IT
S
TO
M
AX
IM
IZ
E D
IM
EN
SI
O
N S
"A " A
N D
"B
SE
AL
D U
C
TS
/C O
N D
U
IT
W
IT
H
M S
C O
TC
H
C
AS
T
T
O
PR
EV
EN
T
EN
TR
Y
O F
W
AT
ER
IN
TO
T
H E
D U
C
TS
. S
EA
L O
C C
U
PI
ED
D
U C
TS
F
O
LL
O W
IN
G
C
AB
LE
IN
ST
AL
LA
TI
O N
D
ET
AI
L
N O
TE
S
1. 2. 3. 4. 5.
IN
C
O M
IN
G
C O
N D
U
IT
N
EW
IN
G
R O
U N
D
PU
LL
BO
X (H
AN
D
H O
LE
C R
O
SS
-S
EC
TI
O
N A
H
AN
D H
O
LE
L
ID
PV
C
C O
N D
U
IT
(S
TO
T
ER
M
IN
AL
PO
SI
TI
O
N C
O N
C R
ET
E
PA
VE
R U
N D
ER
E
AC
H
C O
R N
ER
(4
) O F
H
AN
D H
O
LE
TO
P
R
EV
EN
T
SE
TT
LI
N
G
SL
O
PE
C
O N
D U
IT
A
W
AY
FR
O
M B
U
IL
D
IN
G
BA
C
KF
IL
L
TO
W
IT
H
IN
2-
IN
C H
ES
O
F
FI
N
IS
H
ED
G R
AD
E
D
IM
"A
BU
IL
D
IN
G
IN
TE
R
IO
R
M O
G U
L-
TY
PE
LB
F
IT
TI
N
G
C O
N D
U
IT
" B
ED
O
F C
O M
PA
C
TE
D
C R
U
SH
ED
R
O C
K.
E
XT
EN
D R
O C
K
" B
EY
O N
D P
ER
IM
ET
ER
O F
H
AN
D H
O
LE
O N
A
LL
S
ID
ES
C R
O
SS
-S
EC
TI
O
N B
C O
N D
U
IT
S
FR
O M
PU
LL
BO
X
TO
B
U
IL
D
IN
G
IN
TE
R
IO
R
D
IM
"B
BU
IL
D
IN
G
EX
TE
R
IO
R
W
AL
L
IM
C C
O N
D U
IT
T
O C
O M
M U
N
IC
AT
IO
N S
R O
O M
O R
O
TH
ER
SP
AC
E
U N
D
ER
G R
O U
N D
B O
X (H
A N
D H
O
LD
) D
ET
A
IL
TE
R M
IN
A
L
EN
TR
A
N C
E
- P
LN
N O
S C
AL
E
EL
EC
TR
IC
M
ET
ER
C T
C O
N N
EC
TI
O N
S
VO
LT
AG
E
C O
N N
EC
TI
O N
S
F1 F2 F3
C T
W
IR
IN
G
VO
LT
AG
E
W
IR
IN
G
(6
-IN
PU
TS
(M
AX
IM
U M
R S4
T
W
IS
TE
D
P
AI
R
C
AT
C
O
PP
EREM
C
S C
O N
TR
O
LL
ER
N
EW
C O
M M
R
AC
K
EX
IS
TI
N G
B U
IL
D
IN
G
M
AI
N P
O W
ER
N O
TE
S:
1. 2.
TH
IS
D
IA
G R
AM
IS
F O
R R
EF
ER
EN
C
E O
N
LY
T O
IL
LU
ST
R
AT
E
TH
E
SY
ST
EM
C
O M
PO
N
EN
TS
O F
TH
E
M
ET
ER
IN
G S
YS
TE
M
SE
E
AL
L
D R
AW
IN
G D
ET
AI
LS
A
N D
S C
H
EM
AT
IC
S
FO
R P
AR
TS
, W
IR
IN
G
, A N
D
IN
ST
AL
LA
TI
O N
D
ET
AI
LS
O
VE
R A
LL
M
ET
ER
IN
G
S
YS
TE
M
C O
M
PO
N
EN
T B
LO
C
K D
IA
G
R A
M D
ET
A
IL
N O
S C
AL
E
O R
E
TH
ER
N
ET
G R
O U
N D
C U
T
AW
AY
G
EN
ER
AL
N O
TE
S:
1.
TH
IS
D
ET
AI
L R
EP
R
ES
EN
TS
T
H E
EN
TI
R E
TR
EN
C H
A R
O U
N D
B U
IL
D
IN
G
A N
D
EN
C O
M
PA
SS
M
U
LT
IP
LE
O
BS
TA
C
LE
S
FO
U
N D
IN
T
R
EN
C H
P
AT
H . T
H
IS
D
ET
AI
L
IS
F
O R
G
EN
ER
AL
R
EF
ER
EN
C E
AN
D
D O
ES
N
O T
R
EF
ER
T
O O
N E
PA
R
TI
C
U
LA
R L
O C
AT
IO
N O
N S
IT
E
TH
IS
S
EC
TI
O
N R
EP
R
ES
EN
TS
PO
R
TI
O N
S O
F
TR
EN
C
H P
AS
SI
N G
TH
R
O U
G H
G R
AS
SY
/U N
P
AV
ED
E
AR
TH
BA
C
KF
IL
L
AN
D C
O M
PA
C
T
EA
R
TH
AF
TE
R C
O N
D U
IT
IS
IN
ST
AL
LE
D
U N
D
IS
TU
R
BE
D
E
AR
TH
U N
D
IS
TU
R
BE
D
P
AV
ED
S
U R
FA
C
E
BA
C
KF
IL
L
AN
D C
O M
PA
C
T
EA
R
TH
T O
PP
ED
W
IT
H C
O M
PA
C
TE
D
AG
G
R
EG
AT
E
BE
FO
R E
R
ES
TO
R
IN
G
A
SP
H
AL
T
SU
R
FA
C E.
C O
O R
D
IN
AT
E
W
IT
H F
IE
LD
C O
N D
IT
IO
N S
TO
M
AT
C
H T
H
IC
KN
ES
S O
F
AS
PH
AL
T
AN
D D
EP
TH
O F
C O
M
PA
C
TE
D A
G G
R
EG
AT
E
BA
SE
C O
R E
8"
IN
TO
C
O N
C R
ET
E
EV
ER
Y
" O N
C
EN
TE
R
. P
LA
C E
#5 R
EB
AR
B
ED
D
ED
IN
E
PO
XY
P R
IO
R
T O
R
ES
TO
R
IN
G
C O
N C
R
ET
E
D
EP
TH
O
F
TR
EN
C
H
LA
P
R
EB
AR
" I N
C
EN
TE
R
O F
TR
EN
C H
D
IR
EC
T
BU
R
IE
D
C O
N D
U
IT
U N
D
IS
TU
R
BE
D
E
AR
TH
BA
C
KF
IL
L
AN
D C
O M
PA
C
T
EA
R
TH
AF
TE
R C
O N
D U
IT
IS
IN
ST
AL
LE
D
TH
IS
S
EC
TI
O
N R
EP
R
ES
EN
TS
PO
R
TI
O N
S O
F
TR
EN
C
H P
AS
SI
N G
TH
R
O U
G H
A
SP
H
AL
T
SU
R
FA
C
ES
TH
IS
S
EC
TI
O
N R
EP
R
ES
EN
TS
PO
R
TI
O N
S O
F
TR
EN
C
H P
AS
SI
N G
TH
R
O U
G H
C O
N C
R
ET
E
PA
VI
N
G
M
AT
C H
T H
IC
KN
ES
S
O F
C O
N C
R
ET
E
PA
VI
N
G
IN
F
IE
LD
C O
M
PA
C
TE
D A
G G
R
EG
AT
E
D
EP
TH
T
O M
AT
C
H T
H
IC
KN
ES
S O
F
SU
R R
O U
N D
IN
G
P
AV
EM
EN
T
SE
C
TI
O N
IN
A
LL
L
O C
AT
IO
N S
G R
O U
N D
T R
EN
C
H D
ET
A
IL
N O
S C
AL
E
/2
9/
TY
PE
B F
IN
AL
R O
AD
EX
IS
TI
N
G P
AV
EM
EN
T
SI
TE
P
LA
N K
EY
ED
N O
TE
S:
7.
N
EW
U
N D
ER
G
R O
U N
D C
O N
D U
IT
M
AY
B
E
TR
EN
C
H
ED
A N
D D
IR
EC
T
BU
R
IE
D
D
IR
EC
TI
O N
AL
LY
B O
R
ED
U
N D
ER
G
R O
U N
D C
O N
D U
IT
L
O C
AT
IO
N S
SH
AL
L
BE
FI
EL
D
V
ER
IF
IE
D A
N D
A D
JU
ST
ED
A
S N
EC
ES
SA
R
Y
TO
A
VO
ID
O
BS
TR
U C
TI
O
N S.
S
EE
D
ET
AI
LS
O N
S H
EE
T
M -0
7.
SE
E C
O N
TI
N
U
AT
IO
N
O N
S H
EE
T
M -1
7.
SE
E C
O N
TI
N
U
AT
IO
N
O N
S H
EE
T
M -1
7.
SE
E C
O N
TI
N
U
AT
IO
N
O N
S H
EE
T
M -1
7.
SE
E C
O N
TI
N
U
AT
IO
N
O N
S H
EE
T
M -1
7.
SE
E C
O N
TI
N
U
AT
IO
N
O N
S H
EE
T
M -1
2" C
O N
D U
IT
(U
N D
ER
G
R O
U N
D
2" C
O N
D U
IT
(U
N D
ER
G
R O
U N
D
2" C
O N
D U
IT
(U
N D
ER
G
R O
U N
D
N
EW
H
AN
D H
O
LE
AP
PR
O
XI
M
AT
E
LO
C
AT
IO
N
O F
EX
IS
TI
N
G U
N D
ER
G
R O
U N
D
EL
EC
TR
IC
AL
F
EE
D T
O B
LD
G
375 Tanker Rd.
Alaska ANG-Repair EMCS & Meters
-0
0-
.0
EN
LA
R G
ED
S
IT
E
U
TI
LI
TY
P
LA
N S
JA
N
U
AR
Y
, 2
SN
W
R R
W
AM
T
X:\4259500\161602.01\TECH\CAD\M-003.DWG
1/28/2020 7:22:03 PM
Eielson AFB, AK 99702-1740
SH
EE
T C
O N
TE
N
TS
D O
N O
T
SC
AL
E
D R
AW
IN
G S
M &H
N O
D
AT
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
IS
SU
ED
of
SH
EE
T
N O
C op yr ig ht
Th is d oc um en t, or a ny p or tio n th er eo f, sh al l no t b e du pl ic at ed , d is cl os ed
, o r u se d on a ny ot he r p ro je ct o r e xt en si on o f t hi s pr oj ec t ex ce pt b y w rit te n ag re em en t w ith
M ea d
H un t, In c.
M ea d
H un t s ha ll no t b e re sp on si bl e fo r a ny u na ut ho riz ed u se o f, or al te ra tio n to th es e do cu m en ts
M ea d an d H un t, In c.
N E
C as ca de s Pa rk w ay
Su ite
Po rtl an d, O R ph on e:
-5
-1 m ea dh un t.c om
TR
UE
MAG.
.0
°28 .5
SI
TE
U
TI
LI
TY
P
LA
N
A B
I#
1/
8"
'-0
SI
TE
U
TI
LI
TY
P
LA
N
A B
I#
1/
8"
'-0
/2
9/
TY
PE
B F
IN
AL
Alaska Air National Guard
Eielson AFB, Alaska
Alaska ANG
Repair EMCS & Meters
Type B-3 Submittal Book
Project No. FTQW 16-2602
November 22, 2019
Prepared by:
M&H Project No.: 4259500-161602.01
MSgt Jeffrey Porter
Contracting - 168 MSG/MSC
Eielson Air Force Base
375 Tanker Rd, Room 307
Eielson AFB, AK 99702
Subject: Type B-3 Final Design Submittal
Repair EMCS & Meters – Project No. FTQW 16-2602
Eielson Air Force Base, Alaska
Dear MSgt Porter:
The TetraTech/Mead & Hunt Joint Venture is pleased to present the Type B-3 Final Design Submittal for
Repair EMCS & Meters, Eielson Air Force Base, Alaska.
If there is anything else you require, please contact us.
Sincerely, MEAD & HUNT, Inc.
Jeffrey Mason, PE
Project Manager
Page i
Table of Contents Page
Attachment 5 - TYPE B-3 Certification ...................................................................................................... ii
Attachment 12 - TYPE B-3 Final Design Submittal Checklist ................................................................ iii
Attachment 13 – TYPE B-3 Cost Estimate Executive Summary............................................................ iv
1. INTRODUCTION
A. PROJECT TITLE AND NUMBER
B. SCOPE
C. AT/FP CLASSIFICATION
D. SUMMARY OF APPLICABLE PERMITS
E. MAXIMUM CONSTRUCTION COST
F. HOURS OF OPERATION
2. NARRATIVES
A. MECHANICAL / DDC CONTROLS SYSTEM NARRATIVE
B. ELECTRICAL DESIGN NARRATIVE
C. TECHNOLOGY NARRATIVE
D. PHASING NARRATIVE
3. PROJECT APPROVAL PACKAGE
A. DD Form 1391
4. OPINION OF PROBABLE CONSTRUCTION COST
5. PROJECT SCHEDULE
APPENDICES
Appendix A – ECIP Lifecycle Cost Analysis
Appendix B – Type B-1 Review Comment Responses
Appendix C – Categorization of Control Correlation Identifiers
Appendix D – Type B-2 Review Comment Responses
ANG Design Objectives and Procedures (Tab C) 16 APR 10
ATTACHMENT 5
Page ii
BASE: EIELSON AIR FORCE BASE STATE: AK DATE: 22 November 2019
PROJECT NUMBER: FTQW 16-2602
TITLE: REPAIR EMCS & METERS
Type B-3 Certification
Prepared by A-E and BCE
Submitted to NGB/A7O at completion of B-3
The purpose of this Certification is to confirm that project FTQW 16-2602 can proceed without further reprogramming, adjustment to program scope or cost cutting required to provide a complete and usable facility meeting the requirements established in the DD Form 1391. The total estimated Base Bid plus
ABI’s or Options is at or below the Maximum Construction Cost.
Scope met
CWE
Total Estimate $ 1,352,000 MCC $ 1,360,000
Base Amount $ 1,220,000 90% MCC $ 1,224,000
ABI’s/Options $ 132,000 10% MCC $ 136,000
Do not submit if Total CWE exceeds MCC or Scope is not met.
Contact NGB/A7O to evaluate options if these cannot be met.
ATFP Addressed.
Base Civil Engineer – Sign Date
Base CC – Sign Date
ATTACHMENT 12
Page iii
TYPE B-3 – PRE-FINAL DESIGN SUBMITTAL
CHECKLIST
X CORRECTED FINAL DRAWINGS FOR ALL DISCIPLINES
X
FINAL SPECIFICATIONS INCLUDING DIVISION I – GENERAL PROVISIONS,
INCLUDING SUMMARY OF WORK, BID STRUCTURING, AND CONSTRUCTION
PHASING PLAN (If required for this project.)
CORRECTED FINAL CONSTRUCTION COST ESTIMATE INCLUDING ABI's or BID
OPTIONS
N/A
FINAL ANG SUSTAINABLE DESIGN AND ENERGY CONSERVATION SCORE SHEET
AND NARRATIVE
X UPDATED BASIS OF DESIGN, PARTS I AND II
X PREVIOUS REVIEW COMMENTS WITH A-E DISPOSITION
ATTACHMENT 13
Page iv
COST ESTIMATE EXECUTIVE SUMMARY
SUBMITTAL STAGE: Type B-3
TITLE: Repair EMCS & Meters
ASSUMED BID OPENING DATE: FY 2019
MCC $ 1,360,000
90% MCC $ 1,224,000
BASE BID (Exclude Contingency & SIOH) $ 1,220,000
ADDITIVE BID ITEMS or BID OPTIONS
1 UNDERGROUND WORK AT BLDG 3127/3128 $ 68,000
2 UNDERGROUND WORK AT BLDG 3130/3131/3132 $ 64,000
3 $ 0
4 $ 0
TOTAL ABI’S / BID OPTIONS $ 132,000
TOTAL (BASE BID PLUS ABI’S / BID OPTIONS $ 1,352,000
SEPARATE CONTRACT COSTS
(e.g.) prewired workstations, utility connections, etc.) $ 0
TOTAL ESTIMATE $ 1,352,000
Section One – Introduction
1. INTRODUCTION
A. PROJECT TITLE AND NUMBER
Repair EMCS & Meters
Project No. FTQW 16-2602
B. SCOPE
266,695 Square Feet (SF) total for all Air National Guard facilities.
The base requires a properly configured Energy Management Control System (EMCS) and utility meters to support the 168th mission providing Global Air Refueling, Missile Warning and Space Surveillance for the State and Nation. This project will upgrade the existing EMCS system to accommodate meter data collection and the capability to export the data via CD/DVD due to cyber-security restrictions. The upgrade will also use the meter data to optimize operations to reduce energy consumption charges.
Recent energy audits have shown elements of the base to be extremely inefficient with respect to energy management and energy conservation. The Energy Independence and Security Act of 2007 requires components by 2020 to monitor 85% of the electricity, steam and water use in high use facilities.
The current EMCS system was installed in 1996 and has not been comprehensively upgraded since.
Most buildings are currently controlled by the original Siebe Environmental/Barber-Colman GCM equipment installed in 1996. Building 3180 was recently renovated and a new Schneider Electric
Struxureware system was installed. Both of these systems currently utilize the Air Force network infrastructure to communicate with the “head end” located in Civil Engineering, Building 3225.
Recent security changes have made it difficult for the Siebe equipment and the newer Schneider electric equipment to communicate over the existing modern communications infrastructure. The existing antiquated equipment does not have the capability to communicate via modern security protocols. The current DDC equipment makes use of the secure military network and is separated logically, and not physically, from the remainder of the military network traffic. The existing situation creates ongoing communications problems and necessitates Air Force COMM staff and ANG staff spending hours solving connection issues. Troubleshooting of energy consuming systems in each building is limited due to the lack of tools available in the current system and the ongoing communications trouble.
This project will upgrade the main supervisory controller and network communications devices in each facility. This new equipment will communicate over a physically separate comm system over modern infrastructure and because one of the focuses of the project is the physically separate DDC controls from all other network traffic the DDC and energy management functions of all facilities will be improved.
Facilities that are included in the scope of this project include:
Building 1168 – Aircraft Maintenance Shop
Building 1171 – Fuel Systems Maintenance Hangar
Building 1172 – AGE Storage Building
Building 1173 – Tug & Deicer Warm Storage
Building 1174 – Refueling Pump Station
Building 1176 – Composite Maintenance Facility
Building 1180 – GOX’s Covered Storage
Building 3127 – ANG Headquarters
Building 3128 – Alert Parking Garage
Building 3129 – Squadron Operations Facility
Building 3130 – Base Supply Equipment Warehouse
Building 3131 – Supply Hazardous Storage
Building 3132 – Supply Cold Storage
Building 3133 – Vehicle Maintenance Shop
Building 3180 – Communications Facility
Building 3225 – Base Composite Engineering and Maintenance Facility
Building 32251 – CE Covered Storage Facility
Building 3345 – Medical Training Facility
Phasing
Project construction will be phased in order to minimize interruptions to the operation of all buildings.
Commissioning
Commissioning will be incorporated into the final design documentation. The commissioning will help to ensure that the requirements of the design are met by the installing contractor and that the system functions as designed. The selected commissioning agent will verify the accuracy of the graphics and will require that a significant sample of controls points are tested.
C. AT/FP CLASSIFICATION
Per UFC 4-010-01, Section 1-8.2 Applicability AT/FP standards apply to existing buildings when triggered by one or more of subsections 1-8.2.1 through 1-8.2.4.
• 1-8.2.1 – Major Investments: The scope ($1,360,000) of this project is assumed to be less than 50% of the Plant Replacement Value.
• 1-8.2.2 – Change of Occupancy Level: This project does not change the overall use of the existing facility.
• 1-8.2.3 – Window, Skylight, and Glazed Door Replacement and Installation: This project does not include window, skylight and glazed door replacement.
• 1-8.2.4 – Roadway Improvement Projects: This project does not include roadway improvements.
Because none of these triggers apply to this project, no AT/FP upgrades are proposed. New systems installed in the facility will meet current UFC 4-010-01 requirements.
D. SUMMARY OF APPLICABLE PERMITS
Each project that involves excavation dewatering within 1,500 feet of a known or suspected contaminated site or groundwater plume requires separate authorization under the APDES General Permit for
Excavation Dewatering. Excavation permits for work on the Eielson AFB will be required.
E. MAXIMUM CONSTRUCTION COST
Maximum Construction Cost (MCC) is $1,360,000.
F. HOURS OF OPERATION
Approximate Hours of Operation
Personnel Weekdays
(Mon – Fri)
Weekday Nights
(Mon – Fri)
Weekend Days
(Sat – Sun)
Weekend Nights
(Sat – Sun)
FT 0700 – 1530 - - -
Contractors will not be allowed to work Federal Holidays or 168 WG Alternate Work Schedule (AWS) off days. Any work outside of listed hours will be coordinated with and approved by the Contracting Officer
(CO) or Contracting Officer Representative (COR) a minimum of four business days in advance.
Section Two – Narratives
2. NARRATIVES
A. MECHANICAL / DDC CONTROLS SYSTEM NARRATIVE
Applicable Codes, Guidelines, Criteria
Local Codes:
• 2012 International Mechanical Code
• Alaska Administrative Code
Uniform Facilities Criteria:
• UFC 1-200-01 – General Building Requirements, with Change 2; 7-1-13
• UFC 3-410-01 – Heating, Ventilating, and Air Conditioning Systems, with Change 3; 1-25-17
• UFC 3-410-02 – Lonworks ® Direct Digital Control for HVAC and Other Local Building Systems with Change 1
• UFC 3-430-11 – Boiler Control Systems
• UFC 4-010-01 – DoD Minimum Antiterrorism Standards for Buildings, with Change 1; 2-9-12
• UFC 4-010-06 – Cybersecurity of Facility-Related Control Systems, with Change 1; 1-18-17
Air National Guard Engineering Technical Letters:
• ETL 15-01 Air National Guard Design Policy Tab D; 1 May 2015
Air Force Guidance Memorandum
• AFGM2018-32-01 – Civil Engineer Control Systems Cybersecurity
American Society of Heating, Refrigeration, and Air Conditioning Engineers:
• ASHRAE 135-2016 – A Data Communication Protocol of Building Automation and Control
Networks
Design Conditions
Project Location: Eielson AFB, AK
Elevation: approximately 548 feet above mean sea level
Outdoor air conditions:
Summer: 81º F DB / 61ºF WB (ASHRAE 0.4%)
Winter: -33ºF DB (ASHRAE 99.6%)
Controls System Descriptions
Existing Controls and Metering Systems
Building 1168 – Aircraft Maintenance Shop
This building is served by an existing DDC control system that consists of (1) Siebe GCM supervisory controller and (10) Barber-Colman Microzone II controllers. These devices control the air handling, steam, heating glycol and other HVAC systems.
This building has an electric utility meter on the exterior of the building but this meter does not communicate with any control system. This building also contains a Badger steam condensate meter to measure steam usage and a domestic water meter. The condensate and water meters have the capability to communicate with a digital controls system but the meters are not connected at this time.
This facility contains a separate electrical meter and electrical controls for Head Bolt Outlets (HBO) with the exception of ½ of the east parking lot.
This building has an existing Monaco M-Series fire alarm control panel.
Building 1171 – Fuel Systems Maintenance Hangar controller and (13) Barber-Colman Microzone II controllers. These devices control the air handling, steam, heating glycol, radiant slab, snow melt and other HVAC systems. This facility also contains a Honeywell
HA71 Digital Gas Controller to monitor for noxious gases and control associated systems.
communicate with any control system. This building contains a Badger steam condensate meter to measure steam usage and domestic water meter. The condensate and water meters have the capability to communicate with a digital controls system but the meters are not connected at this time. Head Bolt
Outlets (HBO) are currently not controlled by the existing DDC system.
Building 1172 – AGE Storage Building
This building is served by existing digital controls that consist of (2) Barber-Colman Microzone II controller with associated stand-alone control panel with manual switches, timers and alarms for connected exhaust fan. These devices control the air handling, steam and other HVAC systems.
measure steam usage. The condensate meter has the capability to communicate with a digital controls system but the meter is not connected at this time.
This building has an existing EST fire alarm control panel.
Building 1173 – Tug & Deicer Warm Storage
This building is served by existing digital controls that consist of (4) Barber-Colman Microzone II controllers. These devices control the (6) existing unit heaters, steam and glycol heating systems.
This building has an inoperative electric utility meter on the exterior of the building. This meter does not measure steam usage. The condensate and water meters have the capability to communicate with a digital controls system but the meters are not connected at this time.
This building has an existing EST fire alarm control panel.
Building 1174 – Refueling Pump Station
This canopy does not have any existing DDC or other controls systems.
This canopy is fed from an electric utility meter in the adjacent building 1176 but this meter does not communicate with any control system. There are no other metering systems present in this canopy.
Building 1176 – Composite Maintenance Facility controller and (30) Barber-Colman Microzone II controllers. These devices control 80% of the air handling, steam, glycol heating, radiant slab, snow melt and other HVAC systems. Air handling units 5, 6, 7 and 13 and HVAC serving most offices is not currently connected to the DDC.
This building has an electric utility meter located in the building mechanical room but this meter does not communicate with any control system. The east mechanical room in this building contains a Badger steam condensate meter to measure steam usage. The west mechanical room does not contain a steam condensate meter. The condensate meter has the capability to communicate with a digital controls system but the meter are not connected at this time. This facility contains electrical controls for exterior engine block heaters.
Building 1180 – GOX’s Covered Storage
This building does not have any existing DDC or other controls systems.
communicate with any control system. There are no other metering systems present in this building.
This building has an existing Monaco M-Series fire alarm control panel located on the exterior of the building.
Building 3127 – ANG Headquarters controller and (14) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heat and other HVAC systems. The majority of control valves in this facility are not controlled by the
DDC.
This building has an electric utility meter located in the building mechanical room but this meter does not system but the meter is not connected at this time. This facility is currently in the design phase for a proposed renovation. The majority of DDC controls will remain and be integrated in to the new EMCS.
Any DDC controls added by the renovation project will be integrated as well.
Building 3128 – Alert Parking Garage
There are no metering systems present in this building. The exterior lighting and HBOs are not connected.
Building 3129 – Squadron Operations Facility controller and (22) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heat and other HVAC systems. The facility lighting and HBO’s are not currently DDC controlled.
This building has an electric utility meter in the transformer enclosure exterior to the building but this meter does not communicate with any control system. This building contains a Badger steam condensate meter to measure steam usage and domestic water meter. The condensate meter has the capability to communicate with a digital controls system but the meter is not connected at this time. The domestic water meter is not DDC capable.
This building has an existing Simplex fire alarm control panel.
Building 3130 – Base Supply Equipment Warehouse controller and (20) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heat and other HVAC systems. In addition to these systems, the facility lighting and HBO systems are DDC controlled.
system but the meter is not connected at this time.
Building 3131 – Supply Hazardous Storage
There are no other metering systems present in this building. This facility does contain an existing fire alarm control panel of unknown brand.
Building 3132 – Supply Cold Storage
There are no other metering systems present in this building.
Building 3133 – Vehicle Maintenance Shop controller and (15) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heat and other HVAC systems. This facility also contains a Honeywell HA71 Digital Gas Controller to monitor for noxious gases and control associated systems. In addition to these systems, the HBO systems are DDC controlled. The BOSS building located in the parking lot does not currently have DDC controls. All systems in the BOSS building are stand-alone.
measure steam usage and domestic water meter. The condensate meter has the capability to communicate with a digital controls system but the meter is not connected at this time. The existing domestic water meter does not have DDC capability.
Building 3180 – Communications Facility
This building is served by an existing DDC control system that consists of (1) Schneider Electric supervisory controller and (4) Invensys application controllers. These devices control the air handling, steam, glycol heat and other HVAC systems.
This building has an electric utility meter on the exterior of the building that communicates with the
Schneider Electric control system. This building contains a Badger steam condensate meter to measure steam usage and domestic water meter. The condensate and water meters have the capability to communicate with a digital controls system but the meters are not connected at this time. This facility contains electrical controls for exterior engine block heaters.
Building 3225 – Base Composite Engineering and Maintenance Facility controller and (15) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heating and other HVAC systems. In addition to these systems, the facility lighting and HBO systems are DDC controlled.
measure steam usage and domestic water meter. The condensate and water meters have the capability to communicate with a digital controls system but the meters are not connected at this time.
Building 3345 – Medical Training Facility controller and (4) Barber-Colman Microzone II controllers. These devices control the air handling, steam, glycol heat and other HVAC systems. The facility lighting and HBO systems are not currently DDC controlled.
measure steam usage and domestic water meter. The condensate meter has the capability to communicate with a digital controls system but the meter is not connected at this time. The existing domestic water meter is not DDC capable.
Building 32251 – CE Covered Storage Facility
This building does not have any existing DDC or other controls systems. The facility lighting and HBO systems are not currently DDC controlled.
communicate with any control system. There are no other metering systems present in this building.
Energy Management Systems Proposed for this Project
New supervisory controllers will be provided to replace the existing GCM supervisory controllers. A new head end operator workstation will be located in Building 3225 to serve as the central point for monitoring all buildings. All new controllers will utilize the ASHRAE 135 BACnet standard communication protocol for building automation and control networks. Graphics for all buildings and systems will be re-generated for the new energy management system. The graphics will contain, at a minimum, an overall base map displaying all facilities, floor plans of each facility and system schematics displaying the real-time status of all controlled systems and devices.
New supervisory JACE DDC controllers will be installed in each building to replace the outdated Siebe
GCM controllers. The existing Barber-Colman Microzone field level controls will be retained along with all associated sensors, actuators, valves, etc. The existing-to-remain Microzone controllers and associated control points and sequence of operations will not be modified by this project but will be integrated into the new JACE controllers. The new supervisory controller will be provided with software drivers capable of communication with Microzone controls points. All of the existing Microzone controls points will be
‘mapped’ and integrated into the new controls system.
The JACE controller features a global design that functions with legacy systems and has the ability to scale for future needs. It’s open nature allows installation of any number of controllers and communications protocols. The JACE controllers provides integrated control, supervision, data logging, alarming, scheduling and network management. The JACE controllers provide all supervisory level facility scheduling and alarms. The scheduling and alarm data will be received at the Building 3225 operators workstation where it can be monitored or modified.
The existing Liebert computer room unit controls, swamp cooler, associated gauges and pumps in
Building 3180 will be integrated into the new system for monitoring of that equipment. All other existing systems that are currently without DDC control will remain without DDC control.
The current Eielson communications network is no longer available for use by the DDC facilities controls.
This project will create a new dedicated network for the DDC controls system by installing new network switches in the existing comm racks in each building that currently has communications capability. The communications will be transmitted over the existing underground base communications infrastructure but will be entirely segregated from secure military networks. The system will not be connected to Internet and will have to be supportable as an independent and isolated communication network system.
Buildings 3128, 3131, 3132 and 32251 do not currently have communications infrastructure in place.
Building 3128 will be connected to building 3127 via new underground conduits that will be direct buried or directionally bored between handholes near each building and a new cable pulled into place. Buildings
3131 and 3132 will be connected to building 3130. For these facilities, new underground conduits that will be direct buried or directionally bored between handholes near each building and a new cable pulled into place. The new cables will be terminated inside each building for future comm/controls use. Due to soil contamination between building 3225 and 32251 underground comm infrastructure will not be installed.
The communication for this facility will be provided by a new line-of-site wireless system. This system will utilize highly directional antennas mounted on the exterior of buildings 3225 and 32251 that are in direct site of one another. These antennas will be connected to the DDC network through line-of-site access points/bridges. This type of wireless system typically utilizes radio frequencies, microwaves or infrared lasers to communicate.
Currently utility usage meters are not integrated into the EMCS so actual energy consumption for each facility can only be determined by visually reading meters. All existing, recently replaced and newly installed meters will be integrated into the new DDC controls system allowing the actual energy consumption data to be gathered. Locations without electricity, water or steam condensate meters will be provided with new meters and those will also be integrated into the new DDC. The meters provided will match the existing meters for consistency throughout the base.
The following table summarizes the meter work to be completed by this project:
BUILDING Steam Condensate
Meter
Electric
Utility Meter
EMCS Data
Electric Meter
Water Meter
1168 EXISTING EXISTING NEW EXISTING TO
BE REPLACED
1171 EXISTING EXISTING NEW EXISTING
1172 EXISTING EXISTING NEW NEW
1173 EXISTING EXISTING NEW N/A
1174 N/A Fed from
Fed from
1176 EXISTING(east)-
NEW(west mech rm)
EXISTING NEW EXISTING TO
1176 HBO’S N/A EXISTING NEW N/A
1180 N/A Fed from
3127 EXISTING EXISTING NEW NEW
3128 N/A Fed from
EXISTING
3129 EXISTING EXISTING NEW EXISTING TO
3130 EXISTING EXISTING NEW EXISTING TO
3131 N/A Fed from
3132 N/A Fed from
3133 EXISTING EXISTING NEW EXISTING TO
3180 EXISTING EXISTING INTEGRATE EXISTING
3225 EXISTING EXISTING NEW EXISTING
32251 N/A EXISTING NEW N/A
3345 EXISTING EXISTING NEW EXISTING TO
Electrical controls for exterior engine block heaters will be integrated for buildings 1176, 3130, 3225.
The new energy management system can be provided by any of the following contractors: Tridium-
Niagara.
The contractor listed above is capable of providing the supervisory level controls system proposed. Due to the open nature of the Tridium JACE controllers and because no controls or controllers on the field level will be replaced it is not necessary for the base to establish a field level controls standard at this time. All contractors must provide support local to the Fairbanks area.
B. ELECTRICAL DESIGN NARRATIVE
Design References
Uniform Facilities Criteria:
• UFC 1-200-01 General Building Requirements; Change 2, 1 November 2014
• UFC 3-501-01 Electrical Engineering; Change 3, 14 April 2015
• UFC 3-520-01 Interior Electrical Systems; Change 3, 14 April 2015
• UFC 3-530-01 Interior and Exterior Lighting Systems and Controls; 01 April 2015
• UFC 3-550-01 Exterior Electrical Power Distribution; Change 1, 01 July 2012
• UFC 3-560-01 Electrical Safety, O&M; Change 5, 14 April 2015
• UFC 3-600-01 Fire Protection Engineering for Facilities; Change 3, 01 March 2013
• UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings; Change 1, 01 October 2013
Air National Guard Engineering Technical Letters:
• ETL 15-01-05 Electrical and Communications Engineering; 1 May 2015
Codes:
• NFPA 70 National Electrical Code
• NFPA 70E Standard for Electrical Safety in the Workplace
• NFPA 72 National Fire Alarm and Signaling Code
• NFPA 101 Life Safety Code
Interior Electrical Distribution System
Existing branch circuit feeds for existing control panels will be utilized wherever possible. New electrical circuits will be installed by the EMCS Contractor where necessary.
Heater Block (HBO) Controls
The existing exterior electrical heater block systems will be integrated into the new EMCS.
Lighting Controls
Only facilities that currently include DDC integrated controls for exterior lighting will be integrated into the new EMCS. Provisions will be made in the new EMCS to accommodate future lighting control integration.
Fire Alarm System
Fire Alarm System control points currently monitored by a DDC system will be integrated into the new
EMCS and provide alarms for fire events. These points are typically air handler smoke detectors and a general fire alarm failsafe signal.
C. TECHNOLOGY NARRATIVE
Design References
Unified Facilities Criteria
• UFC 3-580-01 - Telecommunications Interior Infrastructure Planning And Design, with Change 1;
06-01-2016
• UFC 4-010-06 – Cybersecurity of Facility-Related Control Systems, with Change 1; 1-18-17
Engineering Technical Letters
Technology Systems
Technology Systems for this project consist of the following systems: Telecommunication System (Voice and Data)
Site Utility
New 1-1/4” or 1-1/2” innerduct conduits with communications cable between buildings 3130, 3131, 3132.
New communications cable is to be direct buried or directionally bored between buildings 3127 and 3128.
Proposed Telecommunication Systems
Communications system infrastructure (including cable, boxes and conduit) is included by the contractor under this project contract.
Cybersecurity
The proposed network structure created by this project will physically separate the new EMCS data communications from the remainder of the military network traffic. The EMCS and the associated network will not be capable of internet communication. No outside communicating devices will be provided to allow connection to the base DDC network.
National Guard Bureau and Eielson COMM staff has been consulted to evaluate the security impact risk of the proposed controls system/network according to UFC 4-010-06 – Cybersecurity of Facility-Related
Control Systems, with Change 1; 1-18-17 and the five steps for cybersecurity design.
Step 1:
The Confidence-Impact-Availability (C-I-A) rating has been determined for this project: LOW–LOW–LOW
Step 2:
A list of relevant security control has been determined according to NIST SP 800-82. A tabulation of controls has been included in Appendix C of this report.
Step 3:
A list of Control Correlation Identifiers (CCI) has been created using the security controls determined in step 2. A tabulation of CCI’s has been included in Appendix C of this report.
Step 4:
Each of the Control Correlation Identifiers (CCI) has been categorized into one of the following categories: DOD-Defined, Designer, Non-Designer, Platform Enclave, Impractical. See the tabulation of
CCI’s that has been included in Appendix C of this report.
Step 5:
Each of the Control Correlation Identifiers (CCI) that are categorized Designer have been incorporated into the project specifications. Specification section UFGS 25 05 11 Cybersecurity For Facility-Related
Control Systems has been included.
Cybersecurity Design Requirements
Design to Minimize Failure:
Dependency on the network will be achieved because the new EMCS system will not contain the control sequences required to operate mechanical/HVAC equipment in each facility. Those sequences reside at the field level controllers for each piece of equipment and do not require the EMCS or IT network to function. The EMCS will serve as a means to monitor, trend and schedule equipment. This project design will integrate the existing control points required to operate the facility equipment and will not increase or add to the complexity of the existing control strategies.
Design to Manage Failure:
As stated above, the new EMCS system will not contain the control sequences required to operate mechanical/HVAC equipment in each facility. Those sequences reside at the field level controllers for each piece of equipment and do not require the EMCS or IT network to function.
Do Not Implement Standard IT Functions:
The project specifications and drawings have been designed to establish a physically isolated EMCS network that includes cybersecurity measures as required by specification section 25 05 11. This network has been designed and specified to prevent the use of standard IT functions such as VoIP communications, public access and collaborative computing technologies.
Do Not Provide Remote Access:
The project specifications and drawings have been designed to prevent the new EMCS system and the existing DDC controls from connecting to the internet WAN and therefore blocking remote access. EMCS network access will only be allowed through the workstation located in Building 3225 or laptop connected via network cable at a DDC controller.
D. PHASING NARRATIVE
In order to keep buildings operational, the EMCS construction schedule will be organized to minimize system downtime. The phasing of the construction will make every effort to isolate work and minimize any operational disruption. The general intent is that the new EMCS will be in place and buildings will be integrated in a sequential manner into the new system. Phasing will be prioritized first by the amount of site work required and next how critical each building is to the ANG mission. Final phasing will be determined by the AKANG and the installing contractor.
Phasing Priority List (most site work first then descending least critical to most critical):
1. Building 3132 – Supply Cold Storage
2. Building 3131 – Supply Hazardous Storage
3. Building 3130 – Base Supply Equipment Warehouse
4. Building 3128 – Alert Parking Garage
5. Building 3127 – ANG Headquarters
6. Building 32251 – CE Covered Storage Facility
7. Building 3225 – Base Composite Engineering and Maintenance Facility
8. Building 1173 – Tug & Deicer Warm Storage
9. Building 1172 – AGE Storage Building
10. Building 3345 – Medical Training Facility
11. Building 1168 – Aircraft Maintenance Shop
12. Building 3133 – Vehicle Maintenance Shop
13. Building 3180 – Communications Facility
14. Building 3129 – Squadron Operations Facility
15. Building 1176 – Composite Maintenance Facility
16. Building 1171 – Fuel Systems Maintenance Hangar
Section Three – Project Approval Package
3. PROJECT APPROVAL PACKAGE
A. DD Form 1391
Section Four – Opinion Of Probable Construction Cost
4. OPINION OF PROBABLE CONSTRUCTION COST
Type B-3 Submittal
OPINION OF PROBABLE CONSTRUCTION COST
REPAIR EMCS & METERS
EIELSON AFB, AK
Nov 22, 2019
Submitted to:
ALASKA ANG - 168TH WING
375 TANKER RD, ROOM 307
EIELSON AFB, AK 99702
Prepared by:
MEAD & HUNT, INC.
9600 NE CASCADES PARKWAY, SUITE 100
PORTLAND, OR 97220
(503)-548-1494
M & H Project Number:
FTQW 16-2602
X:\4259500\161602.01\TECH\cost est\Eielson Type B-3 FINAL Estimate
SUBMITTAL STAGE: Type B-3 Submittal
LOCATION: EIELSON AFB, AK
ASSUMED BID
OPENING DATE
MCC or PA $1,360,000
90% MCC $1,224,000
BASE BID $1,220,000
ADDITIVE BID ITEMS or BID OPTIONS
1. UNDERGOUND WORK AT BLDG 3127/3128 $68,000
2. UNDERGROUND WORK AT BLDG 3130/3131/3132 $64,000
3. $0
4. $0
TOTAL ABI'S / BID OPTIONS $132,000
TOTAL BASE BID PLUS ABI'S / BID OPTIONS $1,352,000
SEPARATE CONTRACT COSTS $0
(e.g. prewired workstations, utility connections, etc.)
TOTAL ESTIMATE* $1,352,000
* Construction contingency, permits, procurement costs, fees, and other additional costs are not included unless specifically listed under SEPARATE CONTRACT COSTS.
COST ESTIMATE EXECUTIVE SUMMARY
DATE
Client: Alaska ANG - 168th Wing Project Name: Repair EMCS & Meters Address: 375 Tanker Rd, Room 307 Project Number: FTQW 16-2602
City: Eielson AFB, AK Estimator: W9133L-16-D-007-2Z01 Date: 11/22/19 M & H Project Number: 4259500-161602.01
Division 1 - General Requirements
Division 2 - Existing Conditions
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood , Plastics, and Composites
Division 7 - Thermal and Moisture Protection
Division 8 - Openings
Division 9 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Systems
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Mechanical
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31-33 - Site and Infrastructure
Estimated Base Bid Construction Cost
1.
2.
3.
4.
Total Base Bid and ABI's or Bid Options
$0
$0 1.050
1.050
EIELSON EMCS - SUMMARY
BASE COST
DESCRIPTION
UNIT COSTS
GC SUB MARK-UP
1.000
TOTAL COST
1.050 $1,163,000
1.050 $0
$68,000
$01.050
$1,352,000
$64,000
$1,220,000
$2,000
$52,000
$2,000
$55,000
$0 1.050 $0
1.050 $0
$01.050
$1,108,000
23 05 15 3/4" Copper pipe and fittings LF 15 $7.00 $5.94 $105 $89 $194 $371 23 05 15 2" Copper pipe and fittings LF 65 $18.05 $9.58 $1,173 $623 $1,796 $3,286 23 05 15 3" Steel pipe and fittings LF 30 $18.45 $16.87 $554 $506 $1,060 $2,038 23 05 15 2" Backflow Prevention device Ea. 1 $1,175.00 $57.73 $1,175 $58 $1,233 $1,992 23 05 15 Piping Demo LF 110 $0.00 $2.64 $0 $290 $290 $667
$0 $0 $0 $0 230900 Operator Workstation / Server Ea. 1 $3,500.00 $1,000.00 $3,500 $1,000 $4,500 $7,835 230900 Laptops Ea. 2 $1,500.00 $250.00 $3,000 $500 $3,500 $5,895 230900 Supervisory Controllers Ea. 12 $5,425.00 $650.00 $65,100 $7,800 $72,900 $120,922 230900 Application Controllers Ea. 4 $3,275.00 $750.00 $13,100 $3,000 $16,100 $27,618 230900 Point Integration Ea. 1150 $0.00 $265.00 $0 $304,750 $304,750 $699,793 230900 Network Switches Ea. 12 $1,850.00 $1,700.00 $22,200 $20,400 $42,600 $81,972 230900 Control Panel Enclosures Ea. 12 $196.06 $248.06 $2,353 $2,977 $5,329 $10,558 230900 Conduit and Cable for meter wiring LF 750 $7.70 $30.46 $5,775 $22,845 $28,620 $61,597
230900 Condensate Meters Ea. 1 $1,467.00 $250.00 $1,467 $250 $1,717 $2,895 230900 Electric Meters Ea. 13 $1,150.00 $775.00 $14,950 $10,075 $25,025 $46,791 230900 Water Meters Ea. 8 $1,600.00 $750.00 $12,800 $6,000 $18,800 $34,032
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$147,251 $381,163 $528,414
5.00 % $7,363 $19,058 $26,421
$154,614 $400,221 $554,835
1.00 $154,614 ------ $154,614
1.07 ------ $426,235 $426,235
37.00 % $57,207 $148,082 $205,289 $211,821 $574,317 $786,138
0.00 % $0 ------ $0 OVERHEAD Labor (%) 42.40 ------ $243,510 $243,510 PROFIT Mat'l (%) 10.00 Labor (%) 10.00 $21,182 $57,432 $78,614
$233,003 $875,259 $1,108,262 $1,108,262TOTAL
Sub-Total "A"
DESIGN CONTINGENCY
Sub-Total "B"
MATERIAL INDEX MULTIPLIER
LABOR INDEX MULTIPLIER
JOB CONDITIONS MULTIPLIER
Sub-Total "C"
SALES TAX
EIELSON EMCS - CONTROL COSTS
CSI DESCRIPTION UNITS QTY
Total Cost
With
Multipliers
Mat'l /
Equip.
Labor
UNIT COST TOTAL COST
Labor Total
260000 Electrical Allowance Ea. 1 $9,000.00 $18,000.00 $9,000 $18,000 $27,000 $52,179
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$9,000 $18,000 $27,000
0.00 % $0 $0 $0
$9,000 $18,000 $27,000
1.00 $9,000 ------ $9,000
1.07 ------ $19,170 $19,170
37.00 % $3,330 $6,660 $9,990 $12,330 $25,830 $38,160
OVERHEAD Labor (%) 39.50 ------ $10,203 $10,203 PROFIT Mat'l (%) 10.00 Labor (%) 10.00 $1,233 $2,583 $3,816
$13,563 $38,616 $52,179 $52,179TOTAL
Sub-Total "B"
MATERIAL INDEX MULTIPLIER
LABOR INDEX MULTIPLIER
JOB CONDITIONS MULTIPLIER
EIELSON EMCS - ELECTRICAL POWER COSTS
Total Cost
UNIT COST TOTAL COST
270000 Wireless network bridge Ea. 1 $650.00 $250.00 $650 $250 $900 $1,516
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$650 $250…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .