The file is a detailed Bid Submittal and Summary document for Pinellas County's Fire Protection Systems Services Rebid (Bid Number 23-0476-ITB), covering comprehensive fire system testing, maintenance, inspection, certification, and repair services across multiple county facilities. The contract encompasses seven geographical groups of county buildings, including Northwest, Mid County, Southeast Central, Southeast South, Detention, St. Pete/Clearwater Airport, Utilities, Solid Waste, and STAR Center locations. The contract term appears to be for three years, with services required for various fire protection system components such as fire pumps, valves, back flow preventers, piping, sprinkler heads, standpipes, chemical suppression systems, fire/smoke/heat detection devices, alarm systems, fire panels, and deluge valves.
The total estimated contract value is $360,000, which includes $185,000 for parts with a potential zero percent markup from manufacturer's suggested retail price (MSRP), and an additional $175,000 for unspecified services. The pricing structure includes detailed hourly rates for repair and service calls during different time periods, including regular working hours, after-hours/weekend/holiday rates, and emergency response rates. The bid allows for various inspection frequencies including quarterly, semi-annual, annual, bi-annual, 3-year, and 5-year intervals across different facility types such as courthouses, administrative buildings, detention facilities, utilities infrastructure, and specialized centers. Inspection types range from fire panel checks to hydrant inspections, sprinkler system evaluations, and chemical suppression system tests.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement_-_23-0476-ITB_-_Fire_Protection_Systems_Services.pdf | ||
| Advertisement_-_Sample_Agreement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Locations Pricing
| Section F Bid Submittal and Summary |
| Bid Number: 23-0476-ITB |
| Bid Title: Fire Protection System Services - Rebid |
| Frequency definitions: for clarity, the following terms referred to in the inspection frequency are defined as: |
| Quarterly: 4 times per calendar year, with the annual being the 4th quaterly inspection. NOTE: quarterly pricing will be calculated on 3 inspections per year, the annual is priced seperatley. |
| Semi-Annual: 2 times per calendar year |
| Annual: 1 time per calendar year |
| Bi-Annual: 1 time ever 2 calendar years |
| 3 Year: 1 time every 3 calendar years |
| 5 Year: 1 time every 5 calendar years |
| Pricing Note: if any separate inspection is included in another general inspection, list inspection price and zero and note which inspection it is included in. Example: if annual standpipe inspection is included in annual sprinkler system inspection, list standpipe price as zero and note it is included in the sprinkler inspection. |
| No. in Bid | Location | Frequency | UNIT QTY | PRICE PER INSPECTION/TEST | CONTRACT TERM QTY | CONTRACT TERM TOTAL |
| GROUP A- DAS FACILITY OPERATIONS NORTHWEST | ||||||
| 1 | County Courthouse |
315 Court St Clearwater
AFTER HOURS TESTING
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe Inspection | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 2 | Courthouse Garage 315 Court St Clearwater |
AFTER HOURS TESTING
| Standpipe Hydro Static test | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe Inspection | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe Inspection | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 3 | Old Courthouse |
325 S Ft Harrison Ave Clearwater
AFTER HOURS TESTING
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 4 | Annex Building |
400 S Ft Harrison Ave Clearwater
AFTER HOURS TESTING
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe Inspection | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe Inspection | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 5 | Chemical Suppression System 911 area – Computer Room 400 S Ft Harrison Ave Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 6 | Chemical Suppression System 911 area –Telephone Room 400 S Ft Harrison Ave Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 7 | Chemical Suppression System 911 area–UPS Room |
400 S Ft Harrison Ave Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 8 | Building Department |
440 Court St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe Inspection | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe Inspection | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 9 | Planning |
310 Court St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| 10 | Planning Garage |
310 Court St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 11 | Air Quality |
509 East Ave S Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 12 | Communications |
333 Chestnut St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 13 | Brooker Creek |
3611 Fletch Haven Tarpon Springs
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 14 | Brooker Creek |
3620 Fletch Haven Tarpon Springs
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| 15 | Brooker Creek Preserve |
3940 Keystone Rd Tarpon Springs
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 16 | North County Service Center |
Maintenance
29582 US 19 N
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 17 | Emergency Response Building (ERB) |
Bldg. #1
22211 US 19 N
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe Inspection | Quarterly | 2 | $ - 0 | 9 | $ - 0 | |
| Standpipe Inspection | Annual | 2 | $ - 0 | 3 | $ - 0 | |
| Standpipe Inspection | 5 Year | 2 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 18 | ERB Bldg. #1 Tank A-Halon System Pentafluoridethane HFC 125 22211 US 19 N |
Rm A116A Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 19 | ERB Bldg. #1 Tank B-Halon System Pentafluoridethane HFC 125 22211 US 19 N – Rm A216A |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 20 | ERB Bldg. #1Tank C-Halon System Pentafluoridethane HFC 125 22211 US 19 N – Rm A216A |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 21 | ERNB Bldg. #1Tank D-Halon System Pentafluoridethane HFC 125 22211 US 19 N |
Rm A254A Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 22 | ERB Bldg. #10 |
Halon System 1301 Rm 116
22211 US 19 N
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 23 | ERB Bldg. #16 |
22211 US 19 N
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 24 | Vehicle Services Building (VSB) |
Bldg. #2
22211 US 19 N
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 25 | Utilities Administration |
14 S. Ft. Harrison Ave Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 26 | Palm Harbor Museum 2043 Curlew Rd Palm Harbor | |||||
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP A-SUBTOTAL | $ - 0 | |||||
| GROUP B- DAS FACILITY OPERATIONS MID COUNTY | ||||||
| 27 | Animal Services 12450 Ulmerton Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 28 | (Public Safety Campus (PSC) Bldg.1 (Main) |
10750 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Gas Leak Test | 3 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Test | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Hydrant | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 29 | PSC Bldg. 2 (Facilities) |
10750 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Test | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 30 | PSC Bldg. 3 (Maint.) |
10750 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Test | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 31 | PSC Bldg. 4 |
10750 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| EC ARO Clean Agent Fire Suppression Test | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| EC ARO Clean Agent Fire Suppression Test | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 32 | PSC Bldg. 5 |
10750 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Kitchen Fire Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Fusible Links | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Kitchen Hood Cleaning | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 33 | PSC Parking Garage |
10750 Ulmerton Rd Largo
| Standpipe Hydro Static test | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| 3 section Control Valve | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| 3 section Control Valve | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 34 | Medical Examiner Building |
10900 Ulmerton Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 35 | Tax Collector 13025 Starkey Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 36 | CO-OP Extension 12520 Ulmerton Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 37 | Fleet Building 9685 Ulmerton Rd Largo | $ - 0 | ||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Hydrant | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| 38 | EMS Building 12490 Ulmerton Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Hydrant | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| 39 | Heritage Village 11909 125th St |
Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 40 | Gulf Coast Museum of Art 12211–A Walsingham Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 41 | Supervisor of Elections 13001 Starkey Rd Largo | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP B-SUBTOTAL | $ - 0 | |||||
| GROUP C- DAS FACILITY OPERATIONS SOUTHEAST CENTRAL | ||||||
| 42 | Criminal Justice Center (CJC) |
14250 49th St N Clearwater
WEEKEND INSPECTION
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | Annual | 7 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 7 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 6 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 6 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 6 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 43 | Chemical Suppression System FM 200- Telephone Room 14250 49th St N Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 44 | Chemical Suppression System FM 200- UPS Battery Room 14250 49th St N Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 45 | Chemical Suppression System FM 200- 3rd Floor Computer Room 14250 49th St N Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 46 | CJC Garage |
14250 49th St N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 3 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 3 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 3 | $ - 0 | 1 | $ - 0 | |
| 47 | Sheriff’s Forensic Services |
Tech 1 4801 145th Ave N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 48 | Sheriff’s Forensic Evidence Building |
Tech 2 4707 145th Ave N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 49 | Sheriff’s AFIS Building |
Tech 3 4645 145th Ave N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 50 | Clerk Records 14155 49th St N |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 51 | Sheriff’s K-9 |
3410 118th Ave N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 52 | Weedon Island Education Center |
1800 Weedon Island Dr NE St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Hydrant | Annual | 3 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 3 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 53 | Mosquito Control |
4100 118th Ave N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Hydrant | Annual | 3 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 Year | 3 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 54 | PAL Lealman Center 3755 46th Ave N |
St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 55 | Lealman Fire House |
4017 56th Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP C-SUBTOTAL | $ - 0 | |||||
| GROUP D- DAS FACILITY OPERATIONS SOUTHEAST SOUTH | ||||||
| 56 | County Operations |
Building A 501 1st Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 57 | County Operations Annex Building B |
501 1st Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 58 | St. Pete Courthouse |
Building A 545 1st Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Ansul Clean Agent System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Ansul Clean Agent System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 59 | St. Pete Courthouse Judicial Building |
Building B 545 1st Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 60 | Human Services |
647 1st Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 61 | South County Connection Center |
3874 54th Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 62 | South County Service Center |
1800 66th St N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP D- SUBTOTAL | $ - 0 | |||||
| GROUP E- DAS FACILITY OPERATIONS DETENTION | ||||||
| 63 | Detention Campus 14400 49th St |
Clearwater
| Fire Hydrant | Annual | 31 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 year | 31 | $ - 0 | 1 | $ - 0 | |
| 64 | A Barracks 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| 65 | C Barracks 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Deluge Valves | Annual | 8 | $ - 0 | 3 | $ - 0 | |
| 66 | Phase 1 |
14400 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 5 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 5 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 5 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Deluge Valves | Annual | 12 | $ - 0 | 3 | $ - 0 | |
| 67 | F Wing 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Deluge Valves | Annual | 40 | $ - 0 | 3 | $ - 0 | |
| 68 | G Wing 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Deluge Valves | Annual | 12 | $ - 0 | 3 | $ - 0 | |
| 69 | Mini 1 |
14400 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 70 | Mini 2 |
14400 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 71 | Central 14400 49th St |
Clearwater
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 6 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 6 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 6 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 72 | Annex 1 |
14400 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 73 | Health Care 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 4 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 4 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 4 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 74 | Wood Shop 14400 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 75 | SASB |
14540 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 76 | Annex II (Safe Harbor) 14840 49th St |
Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 77 | Bayside Health Clinic |
14808 49th St N Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 78 | Detention Facility Operations/Sheriff’s Purchasing Warehouse |
1440 49th St Clearwater
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 79 | Detention Infrastructure |
1440 49th St Clearwater
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Clean Agent Suppression Test | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Clean Agent Suppression Test | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP E- SUBTOTAL | $ - 0 | |||||
| GROUP F- ST. PETE/CLEARWATER AIRPORT | ||||||
| 80 | Airport Facilities. 15425 Fairchild Dr, Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 81 | Clearwater Terminal 14700 Terminal Parkway Clearwater | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP F-SUBTOTAL | $ - 0 | |||||
| GROUP G- UTILITIES | ||||||
| 82 | Dunn Water Reclamation Facility – Admin Bldg. |
4111 Dunn Dr Palm Harbor
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 83 | Dunn Water Reclamation Facility – Dewatering Bldg. |
4111 Dunn Dr Palm Harbor
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 84 | Maintenance South |
6730 142nd Ave N Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 85 | PC Utilities Lab |
1620 Ridge Rd Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 86 | Keller Water Treatment Facility Electrical Bldg. |
3655 Keller Circle Tarpon Springs
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 87 | Keller Water Treatment Facility Main Admin Bldg. |
3655 Keller Circle Tarpon Springs
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Kitchen Fire Suppression System | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Fusible Links | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Kitchen Hood Cleaning | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 88 | Pump Station 016 |
10548 Park Blvd. Seminole
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 89 | McKay Creek Booster |
1170 Hamlin Blvd.
Largo
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 90 | FOG Facility |
10901 28th St. N.
St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 91 | SCB Public Education Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 92 | SCB Generator 1 Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 93 | SCB Generator 2 Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 94 | SCB Generator 3 Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 95 | SCB Generator 4 Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 96 | SCB Methanol Storage 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Chemical Fire Suppression | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| 97 | SCB Denitrification Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 98 | SCB Dewat Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 99 | SCB EQ/UV/Warehouse 2 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 100 | SCB North Train Blower Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 101 | SCB South Train Blower Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 102 | SCB Dechlorination Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 103 | SCB Storage Building/Warehouse 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 104 | SCB Maintenance Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 105 | SCB IPS Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 106 | SCB Operations Building 7401 54th Ave N St. Petersburg | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Kitchen Fire Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Fusible Links | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Kitchen Hood Cleaning | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| 107 | Cross Bar Ranch Education Center, 20031 Locket Ave, Spring Hill | |||||
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP G- SUBTOTAL | $ - 0 | |||||
| GROUP H- SOLID WASTE | ||||||
| 108 | Solid Waste - Admin Bldg. 3095 114th Ave N |
St Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 109 | Solid Waste – HEC3 (Foam Fire Suppression System in Chemical Storage Bldg.) |
2855-2857 109th Ave St Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Foam Water Suppression | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Foam Water Suppression | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Foam Water Suppression | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Foam Water Suppression | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 2 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 2 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 2 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 110 | Solid Waste – Scale Houses 3100 114th Ave N |
St Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 111 | Solid Waste –Citizens Hand Unload |
3181 114th Ave N St Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 4 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 4 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 4 | $ - 0 | 1 | $ - 0 | |
| 112 | Solid Waste - Water Treatment Plant |
2861 110th Ave. N.
St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 113 | Solid Waste to Energy – Admin 29400 |
110th Ave N St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| 114 | Solid Waste to Energy – Shower/Locker Bldg. |
2901 110th Ave N.
St. Petersburg
| Fire Panel | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| GROUP H-SUBTOTAL | $ - 0 | |||||
| GROUP I- STAR CENTER | ||||||
| 115 | STAR Center 7887 Bryan Dairy Rd Largo | |||||
| Fire Sprinkler System | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Fire Sprinkler System | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Fire Sprinkler System | 3 Year | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Sprinkler System | 5 year (with internal pipe & check valve) | 1 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 1 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Kitchen Fire Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Fusible Links | Semi-Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Kitchen Hood Cleaning | Annual | 1 | $ - 0 | 3 | $ - 0 | |
| Chemical Suppression System | Semi- Annual | 1 | $ - 0 | 6 | $ - 0 | |
| Fire Hydrant | Annual | 12 | $ - 0 | 3 | $ - 0 | |
| Fire Hydrant | 5 Year | 12 | $ - 0 | 1 | $ - 0 | |
| Standpipe | Quarterly | 4 | $ - 0 | 9 | $ - 0 | |
| Standpipe | Annual | 4 | $ - 0 | 3 | $ - 0 | |
| Standpipe | 5 Year | 4 | $ - 0 | 1 | $ - 0 | |
| Sensitivity Testing | Bi- Annual | 1 | $ - 0 | 1 | $ - 0 | |
| Fire Pump | Annual | 2 | $ - 0 | 6 | $ - 0 | |
| GROUP I-SUBTOTAL | $ - 0 |
Bid Summary
| Section F Bid Submittal and Summary | ||||||
| Bid Number: 23-0476-ITB | ||||||
| Bid Title: Fire Protection System Services- Rebid | ||||||
| SCHEDULED SERVICE AND INSPECTION | CONTRACT TERM SUBTOTAL | |||||
| GROUP A- DAS FACILITY OPERATIONS NORTHWEST | $ - 0 | |||||
| GROUP B- DAS FACILITY OPERATIONS MID COUNTY | $ - 0 | |||||
| GROUP C- DAS FACILITY OPERATIONS SOUTHEAST CENTRAL | $ - 0 | |||||
| GROUP D- DAS FACILITY OPERATIONS SOUTHEAST SOUTH | $ - 0 | |||||
| GROUP E- DAS FACILITY OPERATIONS DETENTION | $ - 0 | |||||
| GROUP F- ST. PETE/CLEARWATER AIRPORT | $ - 0 | |||||
| GROUP G- UTILITIES | $ - 0 | |||||
| GROUP H- SOLID WASTE | $ - 0 | |||||
| GROUP I- STAR CENTER | $ - 0 | |||||
| CONTRACT TERM TOTAL: | $ - 0 | |||||
| REPAIRS/SERVICE CALLS LABOR RATES | ESTIMATED CONTRACT TERM HOURS | HOURLY RATE | CONTRACT SUBTOTAL | |||
| Rate 1: Repair/Service rate per hour: | 1850 | $ - 0 | $ - 0 | |||
| During regular working hours 7:00am to 4:00pm | ||||||
| Monday-Friday | ||||||
| Rate 2: Repair/Service rate per hour: | 150 | $ - 0 | $ - 0 | |||
| Before 7:00am or after 4:00pm, or on weekends or holidays | ||||||
| Rate 3: Emergecy repair/serivce rate per hour: | 60 | $ - 0 | $ - 0 | |||
| Emergency response during regular working hours 7:00am to 4:00pm | ||||||
| Monday-Friday | ||||||
| Rate 4: Emergency repair/service rate per hour: | 30 | $ - 0 | $ - 0 | |||
| Emergency response before 7:00am or after 4:00pm, or on weekends or holidays | ||||||
| REPAIRS/SERVICE CALL ESTIMATED TOTAL: | $ - 0 | |||||
| PARTS | ESTIMATED CONTRACT TERM PARTS TOTAL | PERCENT DISCOUNT FROM MSRP | CONTRACT SUBTOTAL | |||
| $ 185,000.00 | 0% | $ 185,000.00 | ||||
| PARTS ESTIMATED TOTAL: | $ 185,000.00 | |||||
| UNSPECIFIED (CONTRACT TERM): | $ 175,000.00 | |||||
| CONTRACT GRAND TOTAL: | $ 360,000.00 | |||||
| ADDITIONAL SERVICES PRICING | ||||||
| Quarterly | Semi-Annual | Annual | 5 Year | As Needed | ||
| Fire Hydrant Inspection | ||||||
| Fire Pump Inspection | ||||||
| Fire Suppression Inspection | ||||||
| Fusible Links Replacement | ||||||
| Kitchen Hood Cleaning | ||||||
| Heat Detector Replacement | ||||||
| Emergency Service Call- False Alarm | ||||||
| Exit Pull Station Repair | ||||||
| Battery Fault Troubleshoot | ||||||
| Phoneline Troubleshoot | ||||||
| Strobe Horn Replacement | ||||||
| Smoke Detector Replacement (each) | ||||||
| Relacement/Spare Sprinklerheads (each) | ||||||
| 55-gallon drum of fire suppression foam |
Equipment List
| Location Number | Building Address | Building Type | Fire Panel Type | Building Zones | Detection Devices | Pump Size | Sprinklered (Yes/No) | Sprinker/Foam System Devices | Stand pipe Count | Deluge Valves | Suppression System | Fire Hydrants | |||||||
| Smoke | Heat | Duct | Pull | Tampers | Flows | Check Valves | Back Flow Preventer | ||||||||||||
| GROUP A- DAS FACILITY OPERATIONS NORTHWEST | |||||||||||||||||||
| 1 | County Courthouse | ||||||||||||||||||
| 315 Court St Clearwater AFTER HOURS TESTING | 6 story | EST 3 | 21 | 309 | 536 | 50 | 48 | 75 hp | No | 9 | 0 | 0 | 1 | 1 | No | 0 | |||
| 2 | Courthouse Garage 315 Court St Clearwater | ||||||||||||||||||
| AFTER HOURS TESTING | 3 story | Tied in to 315 Court | 0 | 0 | 0 | 0 | 0 | None | Yes | 4 | 2 | 0 | 1 | 1 | No | 0 | |||
| 3 | Old Courthouse | ||||||||||||||||||
| 325 S Ft Harrison Ave Clearwater AFTER HOURS TESTING | 3 story | Notifier NFS2-640 | 16 | 64 | 2 | 9 | 10 | None | Partially Sprinklered | 1 | 1 | 0 | 1 | 0 | No | 0 | |||
| 4 | Annex Building | ||||||||||||||||||
| 400 S Ft Harrison Ave Clearwater AFTER HOURS TESTING | 6 story | Simplex 4002 | 24 | 154 | 19 | 9 | 19 | 75 hp | No | 11 | 2 | 0 | 1 | 1 | No | 0 | |||
| 5 | Chemical Suppression System 911 area – Computer Room 400 S Ft Harrison Ave Clearwater | 6 story | Potter, PFC4410rc | 4 | 6 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | ||
| 6 | Chemical Suppression System 911 area –Telephone Room 400 S Ft Harrison Ave Clearwater | 6 story | Potter, PFC4410rc | 4 | 2 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | ||
| 7 | Chemical Suppression System 911 area–UPS Room | ||||||||||||||||||
| 400 S Ft Harrison Ave Clearwater | 6 story | Potter, PFC4410rc | 4 | 4 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | |||
| 8 | Building Department 440 Court St. | ||||||||||||||||||
| Clearwater | 4 story | Silent Knight 5207 | 32 | 72 | 3 | 14 | 0 | 40 hp | Yes | 16 | 5 | 0 | 1 | 1 | No | 0 | |||
| 9 | Planning Department 310 Court St Clearwater | 2 story | Silent Knight 5700 | 0 | 12 | 4 | 6 | 4 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 10 | Planning Garage 310 Court St Clearwater | 3 story | SFP-10UD | 0 | 3 | 3 | 0 | 3 | None | No | 2 | 1 | 1 | 1 | 1 | No | 0 | ||
| 11 | Air Quality | ||||||||||||||||||
| 509 East Ave S. Clearwater | 2 story | Notifier (Bldg)/Vikin g (Records) | 4 | 101 | 17 | 0 | 25 | None | Main-Yes Records- Pre-action System Cabinet | ||||||||||
| Shop-Yes | 15 | 6 | 0 | 1 | 0 | No | 0 | ||||||||||||
| 12 | Communications 333 Chestnut St. | ||||||||||||||||||
| Clearwater | 1 story | EST 2 | 15 | 62 | 15 | 0 | 6 | None | Yes | 2 | 2 | 0 | 1 | 0 | No | 0 | |||
| 13 | Brooker Creek | ||||||||||||||||||
| 3611 Fletch Haven, Tarpon Springs | 1 story | NFW-50 | 8 | 10 | 1 | 0 | 5 | None | Yes | 1 | 1 | 0 | 1 | 0 | No | 0 | |||
| 14 | Brooker Creek | ||||||||||||||||||
| 3620 Fletch Haven, Tarpon Springs | 1 story | None | None | 0 | 0 | 0 | 0 | None | Yes | 0 | 0 | 0 | 1 | 0 | No | 0 | |||
| 15 | Brooker Creek Preserve | ||||||||||||||||||
| 3940 Keystone Rd. Tarpon Springs | 1 story | 3 - EST 2 | None | 18 | 0 | 9 | 16 | None | Yes | 4 | 3 | 0 | 1 | 0 | No | 0 | |||
| 16 | North County Service Center Maintenance 29582 US 19 N Clearwater | 1 story | Firelite MS40244 | 4 | 18 | 3 | 2 | 6 | 0 | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 17 | Emergency Response Building (ERB) Bldg #1 |
22211 US 19 N.
| Clearwater | 2 story | Notifier 2- | ||||||||||||
| 3030 | None | 126 | 0 | 0 | 0 | None | Yes | 12 | 6 | 0 | 1 | 2 | No | 0 |
| 18 | ERB Bldg. #1 Tank A-Halon System Pentafluoridethane HFC 125 22211 US 19 N |
Rm A116A Server and Control Room
| Clearwater | 2 story | Cheetah | 0 | 35 | 0 | 0 | 2 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 |
| 19 | ERB Bldg. #1 Tank B-Halon System Pentafluoridethane HFC 125 22211 US 19 N – Rm A216A TANK LOCATION | |||||||||||||||
| Clearwater | 2 story | Cheetah | 0 | 0 | 0 | 0 | 0 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 |
| 20 | ERB Bldg. #1Tank C-Halon System Pentafluoridethane HFC 125 22211 US 19 N – Rm A216A TANK LOCATION | |||||||||||||||
| Clearwater | 2 story | Cheetah | 0 | 0 | 0 | 0 | 0 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 |
| 21 | ERNB Bldg. #1Tank D-Halon System Pentafluoridethane HFC 125 22211 US 19 N |
Rm A254A Server Room
| Clearwater | 2 story | Cheetah | 0 | 2 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 |
| 22 | ERB Bldg. #10 |
Halon System 1301 Rm 116
22211 US 19 N
| Clearwater | 2 story | Cheetah | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 |
| 23 | ERB Bldg. #16 |
22211 US 19 N
| Clearwater | 1 story | MS9600UDLS | 1 | 7 | 2 | 28 | 0 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 |
| 24 | Vehicle Services Building (VSB) Bldg #2 |
22211 US 19 N.
| Clearwater | 1 story | Firelite MS- 9050 UD | 1 | 8 | 0 | 0 | 0 | None | Yes | 1 | 1 | 0 | 1 | 1 | No | 0 | |||
| 25 | Utilities Administration 14 S. Ft. Harrison Ave | ||||||||||||||||||
| Clearwater | 6 story | Simplex 4002 | Address- able | 10 | 24 | 18 | 15 | 40 | Yes | 13 | 8 | 0 | 1 | 1 | No | 0 | |||
| 26 | Palm Harbor Museum 2043 Curlew Rd Palm Harbor | 1 story | Silent Knight | 1 | 5 | 0 | 0 | 4 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| GROUP B- DAS FACILITY OPERATIONS MID COUNTY | |||||||||||||||||||
| 27 | Animal Services 12450 Ulmerton Rd Largo | 1 story | Silent Knight | 14 | 7 | 3 | 4 | 14 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 28 | Public Safety Campus (PSC) Bldg.1 (Main) | ||||||||||||||||||
| 10750 Ulmerton Rd Largo | 3 story | NFS 3030 | 3 | 279 | 10 | 13 | 29 | None | Yes | 10 | 5 | 10 | 1 | 1 | No | 0 | |||
| 29 | PSC Bldg. 2 (Facilities) | ||||||||||||||||||
| 10750 Ulmerton Rd Largo | 1 story | NFS2-640 | 1 | 1 | 0 | 5 | 7 | None | Yes | 1 | 1 | 1 | 0 | 1 | No | 0 | |||
| 30 | PSC Bldg. 3 (Maint.) | ||||||||||||||||||
| 10750 Ulmerton Rd Largo | 1 story | NFS2-640 | 1 | 1 | 0 | 2 | 10 | None | Yes | 2 | 1 | 1 | 0 | 1 | No | 0 | |||
| 31 | PSC Bldg 4 10750 Ulmerton Rd Largo | No | 0 | ||||||||||||||||
| 32 | PSC Bldg. 5 | ||||||||||||||||||
| 10750 Ulmerton Rd Largo | 1 story | NFS2-640 | 1 | 2 | 4 | 0 | 8 | None | Yes | 4 | 1 | 1 | 0 | 1 | No | 0 | |||
| 33 | PSC Parking Garage 10750 Ulmerton Rd Largo | No | 0 | ||||||||||||||||
| 34 | Medical Examiner Building | ||||||||||||||||||
| 10900 Ulmerton Rd., Largo | 2 story | Notifier 640 | None | 116 | 1 | 7 | 8 | None | Yes | 3 | 2 | 1 | 1 | 0 | No | 0 | |||
| 35 | Tax Collector 13025 Starkey Rd Largo | 1 story | FireLite | 4 | 1 | 0 | 1 | 1 | None | Yes | 1 | 1 | 0 | 1 | 1 | No | 0 | ||
| 36 | Co-Op Extension 12520 Ulmerton Rd Largo | 1 story | Silent Knight | 13 | 26 | 2 | 0 | 6 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 37 | Fleet Building | ||||||||||||||||||
| 9685 Ulmerton Rd Largo | 2 story | Gamewell IF602252B |
Silent
| Knight in Body Shop | None | 10 | 1 | 3 | 28 | None | 1 - Main | ||
| 1 - Body Shop | 3 | 3 | 2 | 1 | 0 | No | 0 | ||
| 38 | EMS Building | ||||||||
| 12490 Ulmerton Rd Largo | 2 story | Cerberus | None | 153 | 39 | 5 | 44 | None | Yes - |
| Garage | 1 | 1 | 1 | 1 | 0 | No | 0 | ||
| 39 | Heritage Village 11909 125th St., Largo | 10 | |||||||
| buildings | Ademco Vista 750, FBP |
Wireless–2
| panels | None | 72 | 7 | 0 | 11 | None | Yes - All | 11 | 12 | 12 | 2 | 0 | No | 0 | ||||
| 40 | Gulf Coast Museum of Art 12211–A Walsingham Rd Largo | 1 story | Notifier and Preaction System | None | 49 | 6 | 3 | 5 | None | Yes – Pre- action System | 3 | 2 | 2 | 2 | 0 | No | 0 | |
| 41 | Supervisor of Elections 13001 Starkey Rd Largo | 2 story | Notifier NFS 3030 | None | 1 | 0 | 24 | 8 | None | Yes - Pre- action System | 3 | 2 | 2 | 1 | 0 | No | 0 | |
| GROUP C- DAS FACILITY OPERATIONS SOUTHEAST CENTRAL | ||||||||||||||||||
| 42 | Criminal Justice Center (CJC) 14250 49th St N., Clearwater WEEKEND INSPECTION | A: 1 |
story B,C,D,E, F, H: 4 story
| G: 2 story | Simplex 4100 | 7 | 285 | 4 | 64 | 79 | 125 | Yes | 17 | 17 | 3 | 2 | 6 | No | 7 | ||||
| 43 | Chemical Suppression System FM 200- Telephone Room 14250 49th St N Clearwater | 4 story | Kiddie | 1 | 0 | 0 | 0 | 2 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | ||
| 44 | Chemical Suppression System FM 200- UPS Battery Room 14250 49th St N Clearwater | 4 story | Kiddie | 1 | 0 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | ||
| 45 | Chemical Suppression System FM 200- 3rd Floor Computer Room 14250 49th St N Clearwater | 4 story | Simplex 4004R | 1 | 0 | 0 | 0 | 1 | None | No | 0 | 0 | 0 | 0 | 0 | Yes | 0 | ||
| 46 | CJC Garage | ||||||||||||||||||
| 14250 49th St N., Clearwater | Parking Garage | Honeywell | |||||||||||||||||
| Firelite 636 Pt. | 1 | 4 | 4 | 0 | 11 | None | No | 0 | 0 | 0 | 1 | 3 | No | 0 | |||||
| 47 | Sheriff's Forensic Services Tech 1 4801 145th Ave N Clearwater | 1 story | FireLite MS-9200 | 1 | 5 | 8 | 1 | 9 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 48 | Sheriff's Forensic Services Tech 2 4707 145th Ave N Clearwater | 1 story | Slient Knight | 1 | 7 | 17 | 0 | 9 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 49 | Sheriff's Forensic Services Tech 3 4645 145th Ave N Clearwater | 1 story | FireLite MS5UD | 1 | 26 | 2 | 0 | 4 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 50 | Clerk Records 14155 49th St N Clearwater | 1 story | Slient Knight | 6 | 5 | 16 | 0 | 7 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 51 | Sheriff's K-9 3410 118th Ave N Clearwater | 1 story | Fire Shield | 1 | 7 | 4 | 0 | 5 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 52 | Weedon Island Education Center 1800 Weedon Island Dr NE | ||||||||||||||||||
| St. Petersburg | 2 story | Firelite MS9600 | 6 | 22 | 1 | 10 | 7 | None | Yes | 3 | 3 | 1 | 1 | 1 | No | 3 | |||
| 53 | Mosquito Control | ||||||||||||||||||
| 4100 118th Ave N., Clearwater | 1 story | EST 2 | None | 16 | 0 | 0 | 7 | None | Yes | 2 | 2 | 1 | 1 | 1 | No | 3 | |||
| 54 | PAL Lealman Center 3755 46th Ave N St. Petersburg | 1 story | FireLite MS521 | 1 | 10 | 1 | 0 | 3 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 55 | Lealman Fire House | ||||||||||||||||||
| 4017 56th Ave N., St. Petersburg | 1 Story | Honeywell | |||||||||||||||||
| Firelite Ms- 5024 | 4 | 1 | 4 | 0 | 3 | None | Yes | 1 | 1 | 1 | 1 | 1 | No | 0 | |||||
| GROUP D- DAS FACILITY OPERATIONS SOUTHEAST SOUTH | |||||||||||||||||||
| 56 | County Operations - Building A 501 1st Ave N |
St. Petersburg
| WEEKEND INSPECTION | 10 story | Gamewell 654 | 34 | 107 | 4 | 19 | 37 | 40 hp | Yes | 14 | 10 | 1 | 1 | 1 | No | 0 |
| 57 | County Operations-Annex Building B 501 1st Ave N |
St. Petersburg
| WEEKEND INSPECTION | 7 story | Gamewell 654 | None | 30 | 1 | 2 | 15 | 50 hp | Yes | 6 | 2 | 1 | 1 | 1 | No | 0 |
| 58 | St. Pete Courthouse - Building A 545 1st Ave N., St. Petersburg | |||||||||||||||
| WEEKEND INSPECTION | 5 story | Notifier | 8 | 93 | 45 | 8 | 32 | 75 hp | Yes | 14 | 4 | 1 | 1 | 1 | Yes | 0 |
| 59 | St. Pete Courthouse Judicial Building - Building B |
545 1st Ave N St. Petersburg
| WEEKEND INSPECTION | 1 story | Notifier | None | 3 | 2 | 1 | 3 | None | Yes | 1 | 1 | 1 | 1 | 0 | No | 0 | |||
| 60 | Human Services 647 11st Ave N St. Petersburg | 2 story | Pyrotronics CP400 | 8 | 21 | 6 | 7 | 5 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 61 | South County Connection Center | ||||||||||||||||||
| 3874 54th Ave N St. Petersburg WEEKEND INSPECTION | 1 story | Sonitrol | 1 | 6 | 0 | 0 | 0 | None | Yes | 1 | 1 | 1 | 1 | 0 | No | 0 | |||
| 62 | South County Service Center 1800 66th St N St Petersburg | 2 story | Notifier NPW-100X | None | 6 | 1 | 5 | 10 | None | Yes | 2 | 3 | 1 | 1 | 1 | No | 0 | ||
| GROUP E- DAS FACILITY OPERATIONS DETENTION | |||||||||||||||||||
| 63 | Detention Campus 14400 49th St Clearwater | 31 | |||||||||||||||||
| 64 | A Barracks 14400 49th St Clearwater | 1 story | FireLite 9200 | 7 | 28 | 14 | 3 | 7 | None | Yes | 0 | 1 | 1 | 1 | 1 | No | 0 | ||
| 65 | C Barracks | ||||||||||||||||||
| 14400 49th St., Clearwater | 2 story | Firelite | |||||||||||||||||
| 9200 | 12 | 80 | 10 | 0 | 6 | None | Yes | 3 | 9 | 1 | 0 | 0 | 8 | No | 0 | ||||
| 66 | Phase 1 | ||||||||||||||||||
| 14400 49th St., Clearwater | 1 story | Notifier | |||||||||||||||||
| 3030 | 7 | 121 | 35 | 0 | 14 | None | Yes | 3 | 6 | 2 | 0 | 5 | 12 | No | 0 | ||||
| 67 | F Wing | ||||||||||||||||||
| 14400 49th St., Clearwater | 5 story | Notifier | |||||||||||||||||
| 3030 | 67 | 318 | 10 | 0 | 21 | 75 hp | Yes | 4 | 5 | 1 | 0 | 1 | 40 | No | 0 | ||||
| 68 | G Wing | ||||||||||||||||||
| 14400 49th St., Clearwater | 2 story | See Phase | |||||||||||||||||
| 1 | 20 | 37 | 35 | 0 | 8 | None | Yes | 0 | 4 | 1 | 0 | 1 | 12 | No | 0 | ||||
| 69 | Mini 1 | ||||||||||||||||||
| 14400 49th St., Clearwater | 1 story | Firelite | |||||||||||||||||
| 9200 | 9 | 12 | 20 | 0 | 10 | None | Yes | 0 | 1 | 1 | 0 | 0 | No | 0 | |||||
| 70 | Mini 2 | ||||||||||||||||||
| 14400 49th St., Clearwater | 1 story | Firelite | |||||||||||||||||
| 9200 | 11 | 18 | 24 | 0 | 10 | None | Yes | 0 | 1 | 1 | 0 | 0 | No | 0 | |||||
| 71 | Central | ||||||||||||||||||
| 14400 49th St., Clearwater | 7 story | Not applicable | 20 | 501 | 141 | 97 | 23 | 100 | |||||||||||
| hp | Yes | 24 | 18 | 2 | 0 | 6 | No | 0 | |||||||||||
| 72 | Annex 1 | ||||||||||||||||||
| 14400 49th St., Clearwater | 1 story | Firelite | |||||||||||||||||
| 9600 | 26 | 40 | 6 | 10 | 20 | None | Yes | 0 | 0 | 0 | 0 | 0 | No | 0 | |||||
| 73 | Healthcare | ||||||||||||||||||
| 14400 49th St. Clearwater | 4 story | Firelite | |||||||||||||||||
| 9600 | 4 | 180 | 21 | 18 | 24 | 50 HP | Yes | 14 | 10 | 2 | 1 | 4 | No | 0 | |||||
| 74 | Wood Shop 14400 St Cearwater | 1 story | FireLite MS24 | 1 | 4 | 6 | 2 | 2 | None | No | 0 | 0 | 0 | 0 | 0 | No | 0 | ||
| 75 | SASB |
14540 49th St.
| Clearwater | 2 story | Firelite 9600 | None | 7 | 1 | 4 | 11 | None | Yes | 2 | 4 | 2 | 1 | 0 | No | 0 |
| 76 | Annex II (Safe Harbor) 14840 49th St. | |||||||||||||||
| Clearwater | 2 story | Firelite 9600 | 2 | 18 | 12 | 6 | 6 | None | Yes | 0 | 1 | 1 | 1 | 0 | No | 0 |
| 77 | Bayside Health Clinic 14808 49th St N. | |||||||||||||||
| Clearwater | 1 story | Silent Knight 5700 | 1 | 1 | 0 | 2 | 4 | None | Yes | 1 | 1 | 2 | 0 | 0 | No | 0 |
| 78 | Detention Facility Operations/Sheriff’s Purchasing Warehouse |
1440 49th St.
| Clearwater | 1 story | Notifier | 7 | 5 | 0 | 6 | 11 | 50 HP | Yes | 6 | 2 | 4 | 1 | 0 | No | 0 | |||
| 79 | Detention IB Building 1440 49th St. | ||||||||||||||||||
| Clearwater | 3 story | Notifier | 11 | 27 | 8 | 14 | 2 | None | Yes | 7 | 5 | 5 | 1 | 2 | Yes | 0 | |||
| GROUP F- ST. PETE/CLEARWATER AIRPORT | |||||||||||||||||||
| 80 | 15425 Fairchild Dr, Clearwater | 2 story | Kidde VS | 1 | 0 | 0 | 2 | 3 | None | Yes | 2 | 3 | 1 | 1 | 0 | No | 0 | ||
| 81 | Clearwater Terminal 14700 Terminal Parkway | ||||||||||||||||||
| Clearwater | 2 story | Notifier NFS2-640E | 0 | 100 | 8 | 41 | 42 | None | Yes | 2 | 4 | 1 | 0 | 1 | No | 0 | |||
| 82 | Terminal | ||||||||||||||||||
| 14700 Terminal Parkway Clearwater | 2 story | Notifier XP Series – Tied to Notifier panel above in line 78 | 0 | 123 | 25 | 0 | 159 | None | Yes | 0 | 4 | 1 | 0 | 1 | No | 0 | |||
| GROUP G- UTILITIES | |||||||||||||||||||
| 83 | Dunn Water Reclamation Facility- Admin Bldg 4111 Dunn Dr Palm Harbor | 1 story | Notifier 500 | 1 | 29 | 3 | 3 | 5 | None | No | 0 | 0 | 0 | 0 | 0 | 0 | No | 0 | |
| 84 | Dunn Water Reclamation Facility- Dewatering Bldg 4111 Dunn Dr Palm Harbor | 3 story | Slienbt Knight IFP-50 | 4 | 1 | 3 | 0 | 0 | None | No | 0 | 0 | 0 | 0 | 0 | 0 | No | 0 | |
| 85 | Maintenance South | ||||||||||||||||||
| 6730 142nd Ave N., Largo | 1 story | ||||||||||||||||||
| *Lift may be required to reach equipment | Silent Knight 5204 | 4 | 1 | 0 | 0 | 1 | None | Partially Warehouse only | 0 | 1 | 1 | 2 | 1 | 0 | Canopy sprinkled with antifreeze in system test 5 yr. Two inspector test valves, one external bell | 0 | |||
| 86 | PC Utilities Lab 1620 Ridge Rd Largo | 1 story | Firelite ES-200X | 1 | 22 | 37 | 7 | 4 | None | No | N/A | N/A | N/A | N/A | 0 | 0 | No | 0 | |
| 87 | Keller Water Treatment Facility Electrical Bldg 3655 Keller Circle Tarpon Spring | 1 story | Notifier LCD80 | 1 | 8 | 0 | 0 | 1 | None | No | N/A | N/A | N/A | N/A | 0 | 0 | No | 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .