Advert_-_23-0407-ITB_Section_F-Bid_Summary.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Pumping and Tankering Services-Group 2 & 3 (Re-Bid)
Solicitation number
23-0407-ITB
Issued by
Pinellas County, Florida

About this file

The document is a bid summary spreadsheet (23-0407-ITB) for Pumping and Tankering Services issued by Pinellas County Utilities (PCU) in Florida, soliciting bids for domestic wastewater pumping and transport services. The invitation to bid covers two service groups: Group 2 (Tractor Trailer/Tanker Non-Emergency) and Group 3 (High Output Mobile Pump for both Non-Emergency and Emergency scenarios), with estimated annual usage of 1,000 hours for tractor-trailer services and 1,500 hours for mobile pump services. The bid submittal is due on May 18, 2023, at 3:00 P.M. EST, and appears to be structured for a potential three-year contract term.

The bid summary includes line items for hourly rates for truck and operator services, as well as disposal charges for third-party facilities and disposal operators, with an estimated 1,500 tons of wastewater to be managed. The pricing structure requires vendors to provide all-inclusive rates that encompass mobilization, demobilization, overhead, profit, transportation, and labor costs. The contract is designed to provide PCU with flexible pumping and tankering services to manage domestic wastewater across its service area during both emergency and non-emergency situations, with the ability to transport wastewater between sanitary sewer pump stations, wastewater treatment facilities, and collection systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID TITLE: Pumping and Tankering Services - Domestic Wastewater - Groups 2 & 3 (Re-Bid)Please fill in the areas higlighted in blue.
BID NUMBER: 23-0407-ITB
Section F - Bid Summary
SUBMITTAL DUE: May 18, 2023 @ 3:00 P.M. EST
All-inclusive rate to include mobilization/demobilization and all other fees including overhead, profit, transportation, labor, etc.
Item No.DescriptionPriority(A)
Est Annual Usage - Hours(B)
Hourly Rate Truck(C)
Hourly Rate Operator(B+C) x A =

Hourly Rate Total

1Group 2 - Tractor Trailer/TankerNon-Emergency1000$ - 0$ - 0$ - 0
2Group 3 - High Output Mobile PumpNon-Emergency500$ - 0$ - 0$ - 0
3Group 3 - High Output Mobile PumpEmergency1000$ - 0$ - 0$ - 0
SUBTOTAL: GROUPS 2 & 3$ - 0
Item No.DISPOSAL CHARGESTONSRATEEXTENDED TOTAL
4Third Party Facility1500$ - 0$ - 0
5Disposal Operator1500$ - 0$ - 0
SUBTOTAL: DISPOSAL CHARGES$ - 0
SUMMARY TABLE
Groups 2 & 3 Annual Total$ - 0
Disposal Annual Total$ - 0
3-YEAR LUMP SUM TOTAL$ - 0

Vendor Notes image1.jpeg

File details come from the government source that posted it. Updated .