This is Addendum #2 to the bidding and construction documents for the Green Road Community Center HVAC Renovations project issued by the City of Raleigh Engineering Services Department, dated September 11, 2026. The addendum modifies the original bidding documents dated August 13, 2026, and establishes a bid due date of September 22, 2026 at 1:00 PM. The project, managed by engineer IMEG Consultants Corp., involves HVAC renovations at the Green Road Community Center in Raleigh, North Carolina. Key project components include removing and replacing six packaged units and one split system totaling 57 tons of capacity, cleaning existing ductwork, providing pre-construction and post-construction test and balance services, and installing a new Building Automation System (BAS) with new controllers and a JACE unit. Substantial completion is required by May 14, 2027, with liquidated damages assessed at $500 per calendar day for any delay beyond that date. All bidders must acknowledge receipt of this addendum on the bid form to avoid disqualification.
The addendum provides technical specifications and clarifications for project execution. The BAS will utilize a combination of field-mounted devices and internal control points visible through a BACnet IP controller, with BACnet MSTP connection permitted only for the existing AC-4 unit being reused and integrated into the new system; all other integration must utilize BACnet IP. The contractor is responsible for providing all material and labor required to field-mount devices for a complete and operational system. Existing unit AC-4 shall receive maintenance including coil cleaning, fan inspection, and filter replacement. The fabric ductwork in the gym, originally specified as Ductsox, Air Sox, or KE Fibertec brand, is to be removed, cleaned, and reinstalled by the contractor, with the specific brand to be determined during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 274-ES-FO-FY27-GreenRdHVACRenovations (1).pdf | ||
| AddNo1-274-ES-FO-FY27-GreenRdHVACRenovations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Green Road Community Center HVAC Renovations
IMEG # 25007326.01 Addendum # 2 Page 1 of 1
ADDENDUM # 2
DATE: September 11, 2026
PROJECT: Green Road Community Center HVAC Renovations
IMEG #25007326.01
City of Raleigh # 274-ESIFS-GRHVR-2021
BID DUE DATE: September 22, 2026 at 1:00 PM
ENGINEER: IMEG Consultants Corp.
3221 Blue Ridge Road, Suite 113
Raleigh, NC 27612
TO: All Contract Document Holders of Record.
This Addendum forms a part of the bidding and construction documents. This Addendum supersedes and supplements all portions of the original bidding and construction documents dated August 13, 2026, with which it conflicts. Please attach this Addendum to the Project Manual(s) in your possession.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID
FORM. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.
1. Liquated damages will be assessed at $500 per calendar day for any portion of day that work is not substantially complete by May 14, 2027.
2. Controls points listed on the BAS drawings are a combination of field mounted devices and internal control points. External and Internal control points are to be visible thru BACnet IP controller. The contractor shall provide material and labor required to field mount devices as required for complete and operational system.
3. BACnet MSTP connection will only be allowed for the existing AC-4 unit to be reused and connected to the new BAS. All other integration shall utilize BACnet IP.
4. Existing unit AC-4 shall have coils cleaned, fan checked and filters replaced as part of the project.
5. Brand of the Fabric ductwork in the gym to be removed, cleaned and reinstalled is unknown. It was originally specified to be Ductsox, Air Sox or KE Fibertec. Contractor shall provide labor necessary to remove, clean and reinstall ductwork as required.
6.
END OF ADDENDUM 2
\\files\Active\Projects\2025\25006703.00\BidPhase\20260320 Addendum 1.docx