ADDM1.pdf

PDF 217 KB Posted

Attached to
Enid Woodring Regional Airport Construct Taxilane
Solicitation number
A-2401
Issued by
Garfield County, Eakly Town, Oklahoma

About this file

This document is an Addendum (No. 01) issued by Parkhill for the Enid Woodring Regional Airport Taxilane Construction project, with the project number 01308821.B0, dated September 9, 2024. The addendum modifies the original Contract Documents dated August 23, 2024, and specifically updates the Disadvantaged Business Enterprise (DBE) goal to 4.3% for the project. Bidders are required to acknowledge receipt of this addendum on page 11 of the Bid Proposal and attach the entire addendum to their submission.

The addendum focuses on adjusting the DBE utilization requirement, providing a form for bidders to demonstrate their commitment to the 4.3% DBE goal. Bidders must either commit to meeting the DBE goal or submit documentation demonstrating good faith efforts if unable to meet the full percentage. The document emphasizes the importance of including copies of DBE and non-DBE subcontractor quotes when selecting subcontractors, in accordance with Section 26.53(b) of the contract specifications.

View the file

Other files

File Type Posted
WDG_ConstructTaxilane_ProjectManual.pdf PDF
WDG_ConstructTaxilane_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A:\2021\3088.21\B0_WDG_AM.11_Construct_Taxilane\04_PRCMNT\02_ADDM\ADDM1\ADDM1.docx

ADDENDUM

NO. 01

TO: All Planholders

FROM: Parkhill

PROJECT NAME: Enid Woodring Regional Airport-Construct Taxilane

PROJECT NO.: 01308821.B0

DATE: September 9, 2024

Attention all Prospective Proposers/Planholders: The following are modifications to referenced Drawings and Project Manual. This Addendum becomes a part of Contract Documents and modifies original Contract Documents dated August 23, 2024 as noted herein:

This Addendum consists of 1 page and 1 attachment.

I. CHANGE(S) TO TECHNICAL SPECIFICATIONS:

1. Proposal page 19 is hereby reissued and denoted with “Addendum No. 1” in the footer.

The DBE goal shall hereby be modified to 4.3% for this project.

END OF ADDENDUM NO. 01

Respectfully submitted, PARKHILL

Bidder shall acknowledge receipt of this addendum on page 11 of Bid Proposal.

Attach entire addendum to Bid Proposal submission.

01308821.B0 PROPOSAL-ADDENDUM NO. 1 19

08/24

Forms 1 & 2 for Demonstration of Good Faith Efforts

Form 1: Disadvantaged Business Enterprise (DBE) Utilization

The undersigned Bidder/Offeror has satisfied the requirements of the Bid Specification in the following manner (please check the appropriate space):

The Bidder/Offeror is committed to a minimum of 4.30% DBE utilization on this

Contract.

The Bidder/Offeror (if unable to meet the DBE goal of 4.30%) is committed to a minimum of _____% utilization on this Contract and submits documentation demonstrating good faith efforts.

Name of Bidder/Offeror’s firm: ____________________________________________________

By: __________________________________________________________________________

(Signature) (Title)

IMPORTANT NOTE: The documentation of good faith efforts must include copies of each

DBE and non-DBE subcontractor quote submitted to the Bidder when a non-DBE subcontractor is selected over a DBE for Work on the Contract

Section 26.53(b)