This addendum to the Litchfield Housing Trust's invitation to bid for drainage upgrades at Gagarin Place in Litchfield, Connecticut, provides responses to 17 questions and requests for information submitted by prospective bidders. The project owner is the Litchfield Housing Trust, and the bid opening has been extended to October 13, 2026, at 2:00 p.m. at the Litchfield Town Hall. The scope of work encompasses stormwater drainage improvements at the five-unit residential property, including installation of underground PVC piping, catch basin modifications, trench and swale drain installation, riprap removal and replacement, downspout removal and rerouting, and minimal grading between units with restoration of disturbed areas. The information session and site visit occurred on September 22, 2026, and responses to bidder questions clarify specific technical aspects, including that correcting the riprap knockout in front of house #24 is excluded, that curtain drains under the riprap swale will remain in place, and that downspout and gutter rerouting is included in scope. The estimated project start date is Spring 2027 to allow for optimal working conditions and seeding. Work hours will be determined post-award, and prevailing wages are not required.
The addendum addresses key budgetary and administrative matters, noting that the overall project valuation is unknown at this time and that the budget will include contingency to address potential material price increases given the extended timeline from bid due date to project start. The Litchfield Housing Trust indicated it may allow for material stockpiling at a location to be determined onsite and stated it is reviewing conservation easement impacts on construction access and staging. A revised plan addressing site complications was scheduled for delivery by October 6, 2026. Contact for additional questions was directed to Ken Hrica at hricaassociates@optonline.net with a copy to Jim Simoncelli at office@litchfieldhousingtrust.org. The addendum also corrects an error in the non-collusion packet, which had incorrectly named the Litchfield Housing Authority rather than the Litchfield Housing Trust as the project owner.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LITCHFIELD HOUSING TRUST
INVITATION TO BID – DRAINAGE UPGRADES
GAGARIN PLACE
Information Session & Site Visit September 22, 2026
Questions/Requests for Information
1. Who is the project owner?
Litchfield Housing Trust
2. Will the bid opening be extended?
YES. The bid opening will be extended to OCTOBER 13 2026 at 2PM at the Litchfield Town Hall (74 West St, Litchfield), office of the First Selectman at 2PM.
3. The plans note that the riprap knockout in front of house #24 is not part of the scope – is this the case?
Based on the depth below grade of the existing catch basin in front of house #24, correcting the riprap knockout is not included in the scope of work.
4. The non-collusion packet names Litchfield Housing Authority as project owner.
This will be corrected via an addendum.
5. Is there a curtain drain under the riprap swale behind the houses?
Yes, consisting of a 6” drain on the west wide, and 4” drain on the east side. Both are to remain.
6. Does the basin in the collector that is roughly behind house #18 have a knockout?
No. Part of the scope will be to sawcut the catch basin rise on both east and west ends to create stormwater flow entry points into the sides of the basin.
7. For the new drain that is supposed to be installed, should the outgoing pipe be upsized?
Upsizing of the main 12” piping from the swale basin to the outfall device is not in the project scope.
8. Are removing downspouts and re-routing front gutters part of the scope?
Yes, we want to get as many of the gutters as possible connected to the new system.
9. Will there be any re-grading between units as part of the scope?
The bulk of grading will be behind the units. Grading between units will be minimal if at all. Any construction disturbance between and in front of units shall be regraded, topsoiled, seeded and mulched.
10. For the drain in front of house #16, will there be a cut out drain added?
No. Existing cutouts already exist on both sides of the basin. The cutout on the west side shall be modified to be clear and open. The cutout on the east side adjacent to driveway shall be bricked and mortared shut, riprap removed, and backfilled, topsoiled, seeded and mulched to collect overland flow.
11. How will the conservation easement impact the construction entrance?
We are looking into this and will address access and stockpiling as necessary.
12. What will the work hours be?
This will be determined once project is awarded.
13. When is the estimated start date?
Spring 2027 to better allow for drier working conditions, seeding and erosion control.
14. If the start date is outside of the 120 days from the bid due date, what will be done about material price increases?
Our budget will include contingency to allow for any necessary change orders. Additionally, we may allow for material stockpiles and a to be determined location onsite.
15. What is the estimated valuation of the overall project?
Unknown at this time.
16. Will prevailing wages be required?
No.
17. Where should additional questions be directed?
Email questions to Ken Hrica at hricaassociates@optonline.net, and cc Jim Simoncelli at o ffice@litchfieldhousingtrust.org. A revised plan addressing site complications will be provided by Tuesday October 6, 2026. Please hold off on additional questions before reviewing the revised plan.