This is an Addendum #2 (Questions and Answers document) for RFP PR-26-002, issued by the City of Cartersville, Georgia, for City Hall Furnishings at 10 N Public Square, Cartersville, GA 30120. The project encompasses office furniture for standard and executive offices, workstations, service window areas, conference rooms, council/courtroom seating, breakroom furniture, and specialty rooms including a PR media production space. Key specifications indicate a preference for quality solid wood and steel materials, height-adjustable desks with modesty panels, stackable audience seating without casters, and custom media production tables. The City intends to award the contract to a single vendor and anticipates an award date of Wednesday, April 1, 2026, with building construction completion estimated 13 months from the addendum date (approximately June 2027). Installation scheduling, delivery logistics, phasing options, and site-specific coordination details remain flexible and will be finalized with the selected vendor post-award.

Pricing should not reflect any specific government contract vehicles such as Georgia State or OMNIA contracts. The City has no preferred manufacturers or established furniture standards and is open to alternative material suggestions meeting quality durability requirements. Installation shall occur in accordance with the General Contractor's established operating hours, with the awarded vendor responsible for all trash removal and packaging disposal. No loading dock will be available; deliveries will utilize two passenger elevators with dimensions and weight limits to be coordinated later. The vendor must maintain standard insurance coverage for delivery and installation services, with floor protection requirements to be determined during the coordination phase. Temporary onsite storage availability, delivery truck size restrictions, and other logistics details will be addressed with the awarded vendor following contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RequestforProposals
CityHallFurnishings

RFP: PR-26-002

Addendum #2

Date: Thursday, March 5, 2026

ThisAddendumformsapartoftheRequestforProposalsforCityHallFurnishingsandshall
beacknowledgedaspartoftheproposalsubmission.
PurposeofAddendum
ThepurposeofthisAddendumistoprovideresponsestoquestionssubmittedby
prospectivebiddersregardingtheCityHallFurnishingsRFP.
Thequestionsbelowhavebeencompiledfromallinquiriesreceived.Responsesare
providedforclarificationpurposesandapplytoallproposers.

General / Procurement

1. Please confirm the exact project address.

a. 10NPublicSquareCartersville,GA30120
2. Willpricingneedtoreflectaspecificcontract(e.g.,GeorgiaStateContractorOMNIA

Contract)?

a. No

3. Will the furniture package be awarded to a single vendor or could partial awards be made?

a. Ourintentistoutilizeasinglevendorfortheentiretyoftheproject
4. Willapricingspreadsheetbeprovidedandcanvendorsmodifyit(addcolumns,

rows, tabs)?

a. No

5. Is it acceptable to submit more than one proposal?

a. Yes

6. DoestheCityhavepreferredfurnituremanufacturers,dealers,orestablished
furniturestandards/typicalsforoffices?
a. No,pleaserefertotheScheduleandLayoutintheRFPdocumentsforour
preferredlayouts/officepackages

7. Is there a finish schedule or preferred material palette that vendors should follow?

a. Wedonothaveafinishschedule.WhilethisRFPisnotexclusivetoany
materialsorproducts,thepreferencewouldbeforallfurnituretobequality,
solidwoodandsteelmaterialsthatwillwithstandextendedusethroughout
thefacilitieslifetime.
8. Isthereaspecificationsdocumentortaggedfloorplanavailableforreference?
a. PleaserefertotheScheduleandLayoutintheRFPdocumentsforour
preferredlayouts/officepackages
9. Isthereexistingfurniturethatneedstobemovedorreinstalledaspartofthis

project?

a. No

Office Furniture (Standard & Executive Offices)

10. Should private offices use veneer surfaces or is wood grain laminate acceptable?

a. WhilethisRFPisnotexclusivetoanymaterialsorproducts,thepreference
wouldbeforallfurnituretobequality,solidwoodandsteelmaterialsthat
willwithstandextendedusethroughoutthefacilitieslifetime.
11. Shouldexecutiveofficesdifferfromstandardofficesindesksize,depth,materials,
orstorage?
a. Yes,wewouldlikeexecutiveofficestobeslightlyelevatedfromthestandard
offices.ThefurniturelayoutandscheduleincludedintheRFPdoesreflect
largerdesksandvariationsofbookshelvesversuslateralfilewithshelving
hutchetc.
12. Forheight-adjustabledesks,shouldonlythemainworksurfaceadjustorshouldthe
entireL-shape/returnbeheightadjustable?
a. Whilethisisnotarequirement,preferencewouldbetheentiretyofthedesk
surfacetoadjust.
13. Shouldheight-adjustabledesksbeenclosedorcantheybeexposed?Ifexposed,are
modestypanelsrequiredandwhatmaterialispreferred(laminate,fabric,plexiglass,

etc.)?

a. Alldesksshouldhavemodestypanelsatminimumwithpreferenceof
executivedesksbeingfullyenclosed.WhilethisRFPisnotexclusivetoany
materialsorproducts,thepreferencewouldbeforallfurnituretobequality,
solidwoodandsteelmaterialsthatwillwithstandextendedusethroughout
thefacilitieslifetime.

14. What configuration should desk drawer units be (box/box/file or file/file)?

a. Box/box/file

15. Should pedestal storage units be mobile or fixed, and should they include locking mechanisms?

a. Nopreferenceonmobileorfixed.Lockingpreferred.
16. Aremonitorarmsrequiredfordesksandifsohowmanymonitorsperworkstation
andwhatmonitorspecificationsareusedbytheCity?
a. Monitorarmsnotrequired
17. Aretaskchairsrequiredforallofficesandshouldtheybemeshbackwith
upholsteredseatorfullyupholstered?
a. Officesshouldincludestandardofficechairs,notextendedheightrange
chairs.Nopreferenceonmaterial.
18. Areguestchairsrequiredinofficesandifsowhatisthetypicalquantityperoffice?
a. Yes,pleaseinclude1guestchairinallstandardoffices,andtwoguestchairs
inexecutiveoffices.TheCityManager(320)officewillalsoincludeseating
aroundmeetingtable.
19. Shouldseatingstandardsbeconsistentacrossalloffices?
a. Pleaserefertopriorquestions18and17

20. Do wardrobes require filing at the bottom with storage above or full-height enclosed storage?

a. Nopreference,justneedtoincludesometypeofflexiblestoragesolutionin
additiontodesk/pedestal.

Workstations / Service Window Areas

21. For workstations, what are the required dimensions, panel heights, and overall configuration?

a. Approximate dimensions and configurations are reflected on the furniture

layoutattachedtotheRFP.
22. Areprivacyscreensrequiredforanyworkstationsorservicewindowdesks(e.g.,
meterreaderorinspectorworkstations)?
a. Worskstations/windowdesksrequiringscreeningarecalledoutinthe
FurnitureScheduledocumentattachedtotheRFP
23. Shouldworkstationstoragepedestalsbemobileorfixed?
a. Nopreferenceonmobileorfixed.Lockingpreferred.
24. Shouldservicewindowstationsfunctionastransactionalcounters(liketeller
windows)orinformationalhelpdesks?
a. Pleasequoteworkstationsandwindowdesksshouldasnormalheight
adjustabledesks.
25. Wherewillpoweranddataconnectionsoriginatefortheworkstations?
a. Power/Dataforworkstationswillbeonadjacentwalls.Nopower
distributionneededwithintheworkstationfurnishings.
26. Shouldtheworkstation/servicewindowdesksincludeoneortwodrawerunits?
a. Two,asthesesetupsdonothavetheadditionalwardrobe/storagesolution
theofficeshave.
27. Dotheheight-adjustabledesksatservicewindowsalsorequireprivacyscreensor
modestypanels?
a. Worskstations/windowdesksrequiringscreeningarecalledoutinthe

Furniture Schedule document attached to the RFP.

Conference Rooms

28. Do conference tables require integrated power modules (outlets, USB, HDMI)? If so how many per table?

a. Conferencetablesrequiringintegratedpowermodulesreflectpowerblocks
onthetablesintheFurnitureLayoutdocumentattachedtotheRFP.Please
refertothelayoutforquantities.
29. Shouldconferencetablesbeveneerorwoodgrainlaminate?
a. WhilethisRFPisnotexclusivetoanymaterialsorproducts,thepreference
wouldbeforallfurnituretobequality,solidwoodandsteelmaterialsthat
willwithstandextendedusethroughoutthefacilitieslifetime.
30. DoconsoletablesinconferenceroomsrequirestorageorAVintegration?
a. ConsoletablesdonotrequireanystorageorAVintegration.Conference

spaces with Credenza’s would be those with storage integrated.

Council / Courtroom & Public Meeting Spaces

31. For the council/courtroom audience seating, should chairs be fixed, stackable,

nesting,ormodularseating,casters?
a. Audienceseatingshouldbestackable.Nocasters
32. Shouldcourtroomaudiencechairsbeupholstered,wood,orpolyseatingandshould
theyincludecushions?
a. Nopreference
33. Shouldaudienceseatingincludearms,bearmless,orusesharedarms?

a. Armless

34. Will chairs need to be ganged together or stored on dollies when not in use?

a. Audiencechairswillneedtobestackableforstorage.Dolliespreferred.
35. ArethereADAseatingquantityrequirements?
a. SeatingwillnotbefixedsonospecificADAseatingisrequiredcurrently.
36. Shouldtrainingtablesinthecouncil/courtroomincludepowermodulesormodesty

panels?

a. Power not needed. Modesty panels optional.

37. Shouldtrainingtablesbeflip-top,nesting,orfixedtablesandshouldtheyhave
castersorglides?
a. Trainingtablesshouldbeoncastersandnesting/fliptopforstorage.
38. Willtheroomneedtobereconfigurableorremaininafixedlayout?
a. Thisroomwillbereconfigurablewith126audiencechairswhensetfor
Court/Councilmeetings,andtables/chairsforothereventsandtrainings.

39. Will this room be used for long meetings or training sessions requiring ergonomic seating?

a. Thespacewillbeusedforvariousmeetings,trainings,andevents,however
weareopentoallsuggestedseatingproducts
40. Shouldthedaischairsbefixedtothefloorormovable?
a. DiasChairswillnotbefixedandshouldbeoncasters.
41. Shouldthepodiumincludepower,storage,orcasters?
a. Podiumshouldbeoncastersandcanincludepassthroughsforcablingfrom

floor pockets. Storage is preferred.

Breakroom / Shared Spaces

42. How many seats should the breakroom accommodate?

a. PleaserefertothefurniturelayoutdocumentattachedtotheRFPasseating
forthesetablesisreflectedintheplan.

43. Should breakroom seating be standard height or bar height?

a. Standard

Specialty Rooms

44. For the PR Media Room, what is the intended function of this space and what are the requirements for the custom media production table (size, height, and power needs)?

a. ThiswillbeaproductionstudiospaceforPR/Communicationsfilming,
podcasts,andotherprojects.Spacewillneedtoincludesoftseating/side
tableset-up,2bookshelfunitsoncasters,custommediaproductiontableon
castersandseating.
Theproductiondesk/tableinthisspacewillneedtoaccommodateupto4
seatsfornewscast/podcastdiscussionstyleproductions.Standing/Bar
height.Nopowernecessary.Custombrandedtreatmentpreferredonthe
faceofthetable.
45. ShouldtherollingbookshelfunitsinthePRMediaRoombemetalorlaminate?
a. Nopreference.Theyaretobeusedinfilmproductions,sotheyshouldbe
aestheticallyappealing.
46. ForVault212andPlanReview216,whatdocumentsizesmustthestorage

accommodate?

a. These pieces will be used to blueprint/rolled large format plan documents.

47. IsthedeskintheAV133heightadjustable?
a. Nopreference.

Delivery, Installation & Logistics

48. Will installation occur in phases (by floor or department) or as a single mobilization?

a. At this time, installation plans have not been finalized. This will be

coordinatedwiththeawardedvendoratalaterdate.
49. Whatistheanticipatedinstallationscheduleandstartdaterelativetoconstruction

completion?

a. The building is estimated to be completed 13 months from now. As to

installationschedule,thiswillbecoordinatedwiththeawardedvendorata
laterdate.

50. Will a loading dock be available for deliveries?

a. No

51. Willafreightelevatorbeavailableandwhatareitsdimensionsandweightlimits?
a. No,therewillbetwopassengerelevatorsinthebuilding.
52. Arethererestrictionsondeliverytrucksizeorrequirementsforstreetoff-loading?
a. Thiswillbecoordinatedwiththeawardedvendoratalaterdate.
53. Willtemporaryonsitestoragebeavailableifspacesarenotreadyforinstallation?
a. Thiswillbecoordinatedwiththeawardedvendoratalaterdate.
54. Willothertradesbeworkingonsiteduringfurnitureinstallation?
a. Unknownatthistime
55. Willinstallationoccurduringnormalbusinesshours,andwhatlaborconditions
applyforinstallation(straighttimevsovertime)?
a. InstallationshalloccurinaccordancewiththeGeneralContractor’s
establishedoperatinghours.TheCitywillnotberesponsibleforany
overtimelaborcostsincurredoutsideofthosehours.
56. Arevendorsresponsiblefortrashremovalandpackagingdisposal,orwill
dumpstersbeavailableonsite?
a. Yes,awardedvendorwillberesponsiblefortrashremoval.Available
dumpstersunknownatthistime.
57. Whatsecurity,insurance,backgroundchecks,orfloorprotectionrequirementsmust
installersfollow?
a. Therearenospecificsecurityrequirements.Floorprotectionwillbe
coordinatedwiththeawardedvendoratalaterdate.Theselectedvendor
shallmaintainallstandardinsurancecoveragerequiredforfurniture
deliveryandinstallationservices,

Timeline

58. What is the anticipated furniture award date relative to construction completion?

a. ThisRFPisplannedtobeawardedonWednesday,April1,2026.Andthe
constructionofthefacilityisestimatedtobecompleted13monthsfrom

now.

59. Isthereflexibilitytophaseprocurementforlong-leaditemsifneeded?
a. Weareopentodiscussingthiswiththeawardedvendorasneeded.