This is a Solicitation Addendum Three document issued by the State of Nebraska, Department of Administrative Services State Purchasing Bureau, revising the procurement schedule for High-Speed Transport Services for Network Nebraska. The solicitation (Number 124043 O5) seeks qualified vendors to provide leased lit fiber circuits with Ethernet-based, layer-2 high-speed data connectivity to 294 educational entities across Nebraska, linking them to seven core aggregation points. The original electronic bid submission deadline was January 23, 2026, at 2:00 p.m. Central Time. According to the revised schedule, the State will post an "Intent to Award" notice on February 20 and February 25, 2026, with a contract finalization period running from February 23 through March 6, 2026. The contract award is scheduled for March 9, 2026, with a contract start date of July 1, 2026. The initial contract term is four years, with potential four one-year renewal options, and all new circuits must be operational by the first Friday in August of each service year.

Vendors must provide bandwidth options ranging from 100 Mbps to higher capacities and bundle all costs, including equipment, hardware, installation, cross-connects, and maintenance, into circuit costs without additional charges. All service providers are required to comply with FCC E-Rate requirements, possess a Service Provider Form 498 I.D. (SPIN), and meet rigorous technical standards including 99.99% uptime, maximum 15-millisecond latency, and 24-hour trouble response guarantees. The state reserves the right to conduct annual technology refresh reviews and may impose liquidated damages for E-Rate eligibility failures. While no specific set-aside designations or award values are explicitly mentioned in this addendum, the solicitation allows for awards to one or multiple vendors, with total 48-month costs calculated through a specific pricing methodology including monthly recurring charges, non-recurring charges, and applicable taxes.

View the file

Other files

File Type Posted
Solicitation Intent to Award Notice.docx DOCX document
Hamilton Stacked Bid Docs Redacted.pdf PDF
Addendum One Appendix A - Cost Sheet.docx DOCX document
Segra Stacked Bid Docs.pdf PDF
Viaero Stacked Bid Docs.pdf PDF
Allo MRC Bid Stacked Docs.pdf PDF
124043 O5 RFP 12.12 FINALa.docx DOCX document
NebraskaLink Stacked Bid Docs.pdf PDF
Appendix A - Cost Sheet (ADD 2).xlsx XLSX spreadsheet
Addendum Two Appendix A - Cost Sheet.docx DOCX document
Windstream Stacked Bid Docs.pdf PDF
Allo NRC Bid Stacked Docs.pdf PDF
Appendix A_TABULATION_MASTER_FINAL Revision 31326.xlsx XLSX spreadsheet
Midstates Stacked Bid Docs.pdf PDF
Addendum Five Revised Schedule of Events.docx DOCX document
Great Plains Stacked Bid Docs.pdf PDF
Glenwood Bid Stacked Docs.pdf PDF
Solicitation List of Respondents.docx DOCX document
NebraskaLink Stacked Bid Docs.pdf PDF
Solicitation Intent to Award Notice.docx DOCX document
Windstream Stacked Bid Docs.pdf PDF
124043 O5 RFP 12.12 FINALa.docx DOCX document
Allo MRC Bid Stacked Docs.pdf PDF
Glenwood Bid Stacked Docs.pdf PDF
Addendum Two Appendix A - Cost Sheet.docx DOCX document
Addendum Five Revised Schedule of Events.docx DOCX document
Addendum One Appendix A - Cost Sheet.docx DOCX document
Appendix A - Cost Sheet (ADD 2).xlsx XLSX spreadsheet
Viaero Stacked Bid Docs.pdf PDF
Addendum Three Revised Schedule of Events.docx DOCX document
Appendix A Master-FINAL.pdf PDF
Solicitation List of Respondents.docx DOCX document
Great Plains Stacked Bid Docs.pdf PDF
Segra Stacked Bid Docs.pdf PDF
Allo NRC Bid Stacked Docs.pdf PDF
Midstates Stacked Bid Docs.pdf PDF
Hamilton Stacked Bid Docs Redacted.pdf PDF
Addendum Three Revised Schedule of Events.docx DOCX document
Addendum Two Appendix A - Cost Sheet.docx DOCX document
124043 O5 RFP 12.12 FINALa.docx DOCX document
Appendix A - Cost Sheet (ADD 2).xlsx XLSX spreadsheet
Addendum One Appendix A - Cost Sheet.docx DOCX document
124043 O5 RFP 12.12 FINALa.docx DOCX document
Addendum Two Appendix A - Cost Sheet.docx DOCX document
Addendum One Appendix A - Cost Sheet.docx DOCX document
Appendix A - Cost Sheet (ADD 2).xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION ADDENDUM THREE

REVISED SCHEDULE OF EVENTS

SOLICITATION NUMBER: 124043 O5

High Speed Transport Services Opening Date: January 23, 2026 Addendum Effective Date: February 20, 2026

Revised Schedule of Events

The State expects to adhere to the tentative procurement schedule shown below. It should be noted, however, that some dates are approximate and subject to change. It is the responsibility of bidders to check the State Purchasing Bureau website for all addenda or amendments.

Activity
Date/Time
1
Post “Intent to Award” to the Internet at: https://das.nebraska.gov/materiel/bidopps.html
February 20, 2026

February 25, 2026

Contract finalization period
February 23, 2026- February 27, 2026

February 26, 2026 – March 6, 2026

Contract award
March 9, 2026
Contract start date
July 1, 2026

This addendum will be incorporated into the solicitation.

SPB Form 27 Last Revised 4-17-2025

File details come from the government source that posted it. Updated .