This is Addendum Three to Invitation to Bid No. RFB-185-26 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in conjunction with the Department for Environmental Protection. The project addresses environmental site clean-up and TENORM (Technologically Enhanced Naturally Occurring Radioactive Material) remediation at the Winona Garret Lease located in Ravenna, Kentucky. The addendum was issued on July 7, 2026, and clarifies contractor responsibilities regarding sample collection, analysis, waste disposal procedures, and site restoration requirements. Key specifications include contractor-managed sample collection and analysis of TENORM-containing waste prior to disposal, expedited confirmatory sampling with analytical turnaround times of three days for volatile organic compounds, semi-volatile organic compounds, and RCRA 8 metals, and 21-day ingrowth analysis for combined Radium-226 and Radium-228. The addendum confirms that solidification of sludges may be conducted at the site using cement mixture and that temporary 6-foot steel fencing will be installed and removed by the contractor following project completion.
The addendum addresses contractor questions regarding waste stream profiling procedures, analytical testing schedules, and site restoration commitments. Notably, the addendum confirms that constructed access roadway improvements will remain in place following remedial activities completion rather than being removed. Laboratory turnaround time for radium analysis is specified at 20 business days for standard processing and 21 days with ingrowth for expedited confirmatory sampling. The contractor is responsible for establishing specific processes for sample collection and analysis consistent with disposal facility requirements and project manual specifications outlined in sections 02420.3.04 and 02300.3.04.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum One.pdf | ||
| Final_RFB_785_2600000597_2_SO_FORM.PDF | ||
| Final_RFB_785_2600000597_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000597_3_SO_FORM.PDF | ||
| Addendum Two.pdf | ||
| Final_RFB_785_2600000597_4_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-185-26
FOR: Environmental Site Clean-Up Winona Garret Lease Department for Environmental Protection Ravenna, Kentucky
DATE: July 7, 2026
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-185-26 For: Environmental Site Clean-Up Winona Garret Lease Department for Environmental Protection Ravenna, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
RFB-185-26
Addendum Three
Contractor Question & Answers
• Please confirm the intended process for sample collection and analysis of each load prior to disposal? (Laboratory turnaround times for Ra-226 and Ra228 is 20 business days) o Per Project Manual Section 02420.3.04.D.1., Contractor shall collect and analyze samples of TENORM containing waste prior to disposal.
o Per Project Manual Section 02420.3.04.F.3., Waste stream profiling, at selected disposal facility, to be accomplished by Contractor.
o Based on the above, the process for sample collection and analysis is to be established by Contractor per the requirements of the disposal facility.
• Can you provide an approximate turnaround time for Engineers expedited confirmatory sampling schedule for determining contractor time onsite or need for re-mobilization?
o Per Project Manual Section 02420.3.04.G.3., Confirmatory samples will be analyzed on an expedited schedule and testing will include: Combined Radium-226 and Radium-228, Volatile Organic Compounds, Semi-Volatile Organic Compounds, and RCRA 8 Metals.
o The analytical testing schedule for Volatile Organic Compounds, Semi-Volatile Organic Compounds, and RCRA 8 Metals will have a 3 day turn-around-time.
o The analytical testing schedule for Combined Radium-226 and Radium-228 will require a 21-day ingrowth with actual analysis afterwards.
• Can solidification (if needed) of sludges be conducted at the Site?
o Yes.
• Will the access road improvements be left in place following completion of remedial activities?
o Yes, access road improvements will remain in place at close of Project.
• Please confirm that temporary fencing surrounding construction area will be 6’ steel fencing post driven and will it be removed following project completion?
o Yes, per Project Manual Section 02300.3.04., temporary fencing surrounding the construction area will be 6’ steel fencing post driven into the ground.
o Yes, the temporary fencing will be removed by Contractor following project completion.
• Constructed access roadway for clean-up site ingress o egress to remain at close of Project.
• Yes, TENORM material can be solidified through a cement mixture before transfer to a waste facility.
| Addendum Three |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |