Addendum Three .pdf

PDF 1 MB Posted

Attached to
RFB-189-25 DJJ Hopkinsville Group Home Improvements
Solicitation number
RFB 785 2500000496 4
Issued by
Clark County, Kentucky

About this file

This is Addendum Three to Invitation to Bid No. RFB-189-25 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for Hopkinsville Group Home Improvements at the Department of Juvenile Justice facility in Hopkinsville, Kentucky. The addendum, dated March 26, 2025, introduces a bank stabilization component to the project scope as an additional civil engineering sheet to be included in the bidding documents. The work involves installation of a stone bank that includes removal of large roots and debris from the existing slope, application of eco-friendly weed and grass herbicide to prevent growth of remaining organics, installation of non-woven geotextile fabric (Mirafi 140N or approved equivalent) secured with geotextile anchor pins per manufacturer specifications, and placement of six inches of #3 stone between existing riprap from the edge of pavement to the bottom of slope. The project site plan indicates approximately 23.5 feet, 57.5 feet, 34.5 feet, and 30.5 feet of work areas across different sections of the property.

The addendum references Lynn Imaging for distribution of all additional specifications and drawing changes. Contact for the procurement is Susan Ward, Statewide Procurement Analyst II, located in Owensboro, Kentucky with phone and fax contact information provided. The civil engineering work is prepared by Associated Engineers, Inc., with drawings prepared by D. Lamb and checked by C. Jeremiah Short, P.E., Civil Engineer. Bidders are required to call 48 hours in advance of digging for notification of buried line and cable locations to ensure safe execution of the bank stabilization work.

View the file

Other files

File Type Posted
Final_RFB_785_2500000496_1_SO_FORM.PDF PDF
Final_RFB_785_2500000496_2_SO_FORM.PDF PDF
Final_RFB_785_2500000496_3_SO_FORM.PDF PDF
Addendum One .pdf PDF
Final_RFB_785_2500000496_4_SO_FORM.PDF PDF
Addendum Two .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-189-25

FOR: Hopkinsville Group Home Improvements

Department of Juvenile Justice Hopkinsville, Kentucky

DATE: March 26, 2025

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-189-25 For: Hopkinsville Group Home Improvements

Department of Juvenile Justice Hopkinsville, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Owensboro, Kentucky 2740 North Main Street, Madisonville, Kentucky 42431 Lexington, Kentucky

Phone: (270) 684-8450 Phone: (270) 821-7732 • Fax: (270) 821-7789 Phone: (859) 286-3000

Civil • Structural • Mining • Geotechnical • Forensic • Land Surveying

Construction Monitoring • Environmental • Drilling • Laboratory Services www.associatedengineers.com

Civil Addendum Items

Addendum #3

DJJ Hopkinsville Group Home

RFB-189-25

March 26, 2025

Included in the addenda is an additional civil sheet “BANK STABILIZATION -

ADDENDUM #3”. This should be added as an additional sheet to the plans.

Revisions include:

• Bank stabilization plans. Which details the installation of a stone bank. Including removing large roots and debris, spraying existing grass and weeds with Weed &

Grass Herbicide, installing new Non-woven geotextile and placement of #3 Stone.

C. Jeremiah Short, P.E.

Civil Engineer

Existing Building OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

EMTR

RD

RD

RD

U /E

U

/EU/E

U/E

U/E

U/E

U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E

U/E

U/E U/E

U/E U/E

U/E U/E

U/E U/E

U/E U/E

U/E

U/E

U/E

U/E

U/E U/E

U/E U/E

U/E

U/ E

U/ E

U/E U/E U/E U/E U/E

U/E

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E U/E

U/E U/E U/E U/E U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E

U/E U/E

U/E

U/T

U/T U/T

U/T

U/T

U/T U/T

U/T U/T

U/T U/T

U/T U/T U/T U/T U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T U/T

U/T

U/T

U/T

U/T U/T U/T U/T U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T

U/T U/T

U/T

U/T W W

W W

W W

W W

W W

W W

W W

Propane Pad

Existing RipRap

Existing RipRap

Place 6" of #3 Stone Per Detail Between Existing Rip Rap, From Edge Of Pavement To Bottom Of Slope

Existing Storm Ditch

(DO NOT DISTURB)

Ap pr ox . 2

3.

5'

Approx. 57.5'

Ap pr ox . 3

4.

5'

Ap pr ox . 3

0.

5'

For Buried Line/Cable Locations

CALL 48 HOURS IN ADVANCE OF DIGGING. AUTHORIZED AGENT

DATE

DATE

AGENCY

DIV. OF ENGR.

DRAWN BY

RECORD DATEREVISIONS COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

Approved For Program Concept Only

Approved For Program Concept Only

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DATE

REVIEWED

DRAWING NO.

CONSULTANT FILE NO.

DIV. OF ENGR.

DATE

CHECKED BY

PROJECT FILE NO.

ENGINEERS, INC.

SSOCIATED

ENGINEERS GEOLOGISTS SURVEYORS

For Buried Line/Cable Locations

CALL 48 HOURS IN ADVANCE OF DIGGING. AUTHORIZED AGENT

DATE

DATE

AGENCY

DIV. OF ENGR.

DRAWN BY

RECORD DATEREVISIONS COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

FINANCE AND ADMINISTRATION CABINET

Approved For Program Concept Only

Approved For Program Concept Only

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DATE

REVIEWED

DRAWING NO.

CONSULTANT FILE NO.

DIV. OF ENGR.

DATE

CHECKED BY

PROJECT FILE NO.

ENGINEERS, INC.

2740 North Main St. Madisonville, KY 42431 Phone: (270) 821-7732 Fax: (270) 821-7789

SSOCIATED

www.associatedengineers.com

ENGINEERS GEOLOGISTS SURVEYORS

J. Short

03-26-2025 23-0106B

N

AD

K

Y

ST

AT

E

PL

AN

E, SO

U

TH

Z O

N E

GR

ID

N O

RT

H

BANK STABILIZATION - ADDENDUM #3 HOPKINSVILLE GROUP HOME

HOPKINSVILLE, KENTUCKY

D. Lamb

SCALE: 1" = 5'

5 10 15

GRAPHIC SCALE

0 20

500 EXISTING CONTOUR

EXISTING EDGE OF ASPHALT/CONCRETE

EXISTING BUILDING

LEGEND

PROPOSED #3 STONE

EXISTING BASKETBALL COURT

EXISTING RIPRAP

523-CB0Y-HG-0900

#3 Stone

STONE BANK SECTION

N.T.S.

6"

Existing Soil To Be Removed Of Large Roots & Debris. Remaining Organics (Grass) To Be Sprayed With Eco-Friendly Weed & Grass Herbicide To Prevent Growth

Place Non-Woven Geotextile Fabric (Mirafi 140N or approved equivalent)

Below All Stone. Anchor To Ground Using Geotextile Anchor Pins

Per Manufacturer Recommendations

ADDENDUM #3 3/26/25

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Addendum Two
Civil Addendum Items Addendum #3
Civil Sheet 4 Addendum 3 Hopkinsville Group Home
Sheets and Views
Site Plan1 (2)

File details come from the government source that posted it. Updated .