This is Addendum Three to an Invitation to Bid issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for a kitchen renovation project at Owensboro Community & Technical College within the Kentucky Community & Technical College System. The addendum, dated February 6, 2024, modifies the original specifications and drawings dated September 2023 for RFB-161-24 (RFB-785-2400000351). The single substantive change requires replacement of Sheet M1.1 (Kitchen HVAC Plans) with an updated version that includes revised mechanical, electrical, plumbing, and HVAC specifications for the kitchen renovation scope of work.
The updated Sheet M1.1 contains detailed HVAC design specifications including cooling capacity data for two existing air conditioning units (AC-1 with 7,000 CFM total cooling supply and AC-2 with 11,600 CFM total cooling supply), building exhaust and makeup air requirements (3,150 CFM kitchen hood exhaust and 2,520 CFM makeup air unit capacity), and revised minimum airflow setpoint adjustments for nine VAV boxes to 35 percent of design airflow. The drawing includes a complete kitchen HVAC plan and demolition plan at quarter-inch scale, a roof HVAC plan, grilles and diffusers schedule with specifications, and comprehensive general notes addressing ductwork coordination, external insulation requirements, thermostat mounting at 60 inches above finished floor, certified test and balance requirements, and compliance with Kentucky Building Code, Kentucky Mechanical Code, and SMACNA HVAC Duct Construction Standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2400000351_4_SO_FORM.PDF | ||
| Final_RFB_785_2400000351_2_SO_FORM.PDF | ||
| Addendum One.pdf | ||
| Final_RFB_785_2400000351_3_SO_FORM.PDF | ||
| Final_RFB_785_2400000351_1_SO_FORM.PDF | ||
| Addendum Two.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-161-24
FOR: Kitchen Renovation Owensboro Community & Technical College Kentucky Community & Technical College System Owensboro, Kentucky
DATE: February 6, 2024
RFB-785-2400000351
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-161-24 For: Kitchen Renovation Owensboro Community & Technical College Kentucky Community & Technical College System Owensboro, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
P a g e
T000-LASTNAME-
INT
Project: Addendum No.:
Date: , 2024
Owner: Project Number:
Contract for:
The original specifications and drawings dated September, 2023 for the project noted above are amended as noted in this Addendum Number 003. Receipt of this addendum and any subsequent addenda must be acknowledged on the final bid documents. This addendum consists of One (1) item(s) and One (1) attachment(s).
2-1 Reference attached Sheet M1.1. Replace Sheet M1.1 bound in the Construction Documents with the Sheet attached herein..
P a g e
Attachments:
By:
CC:
S-1
S-1
"ø
10"ø
S-1
S-1
R-1
14"x12"
"ø
"ø
M6
12"ø
12"ø
12"ø
12"ø 1 "ø
M4 M5
"ø
M4
M3
M3
M7
24"x16"
M1 M1
M1
M1
M2
M8
M9
M10
M10
M10
8' - 6"
6' - 0"
17' - 4"
2' - 0"
2' - 0"
COOLING MIXED AIR TEMPERATURE
CFM DB (°F) WB (°F)
TOTAL COOLING SUPPLY: 7,000 AMBIENT TEMP: 94 77
O.A.: 1,200 RETURN AIR TEMP: 75 62.5 (50% RH)
DRY BULB (°F): 78.3 PERCENTAGE O.A.: 17%
WET BULB (°F): 65.0
PROJECT: OCTC KITCHEN RENOVATION
UNIT TAG: EXISTING AC-1
COOLING MIXED AIR TEMPERATURE
CFM DB (°F) WB (°F)
TOTAL COOLING SUPPLY: 11,600 AMBIENT TEMP: 94 77
O.A.: 2,200 RETURN AIR TEMP: 75 62.5 (50% RH)
DRY BULB (°F): 78.6 PERCENTAGE O.A.: 19%
WET BULB (°F): 65.3
UNIT TAG: EXISTING AC-2
CFM CFM
TOTAL BUILDING EXHAUST: -1530 SPACE EXHAUST: -3150
TOTAL BUILDING OA: 3400 SPACE MAKEUP AIR UNIT: 2520
SPACE OA(DINING ROOM/KITCHEN): 988 (19% OF 5200 CFM SUPPLY)
KITCHEN HOOD EXHAUST: -3150 BUILDING EXTRA MAKEUP AIR THROUGH SERVING COUNTER WINDOW
AT DESIGN AIRFLOW
MAKEUP AIR UNIT: 2520 TOTAL SPACE AIRFLOW: 358 CFM (POSTIVE)
TOTAL BUILDING AIRFLOW: 1240 CFM (POSTIVE)
RAISE MINIMUM AIRFLOW SETPOINT ON VAV BOXES, 1-1, 1-11, 1-12, 2-2, 2-8, 2-10, 2-11, 2-12, 2-13 TO 35% OF DESIGN AIRFLOW DESIGN AIRFLOW FOR SPACES OPEN TO DINING ROOM IS 1800 X .35 X .17 = 107(AC-1) 8800 X .35 X .19 = 585(AC-2)
107 CFM + 585 CFM = 692 > 630 REQUIRED FOR ADDITIONAL MAKEUP AIR.
R E
NI
GNEAN LOIS
ES
F O R P
E
KENTUC
K Y
FO
ETAT
S
DESNE
L I C
STEINHART
23766
W.
YANR
DRAWING INFORMATION
CHECKED BY
REVISION HISTORY OF THIS DRAWING
DRAWING NO.
AS BUILT DATE
MM/DD/YR
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE
RTA DATE
AS BUILT DATE MM/DD/YR
DRAWN BY
A&E FILE NO. 2301-124
DECA LOG #
ACCOUNT NO.
470 CAU8 OC 3200
DESCRIPTION OF REVISIONS DATE
DESIGNED BY
11/03/2023
11/03/2023
KCTCS - OCTC KITCHEN RENOVATION
KITCHEN HVAC PLANS
M1.1
WSD
RWS
RWS
PLAN NOTES:
M1 REMOVE SUPPLY DIFFUSER AND DUCT TO WHERE SHOWN.
GENERAL NOTES:
A. THE HVAC DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED
TO INDICATE GENERAL ARRANGEMENT OF EQUIPMENT,
DUCTWORK AND PIPING. CONTRACTOR SHALL MAKE
MODIFICATIONS IN THE INSTALLATION SO ALL EQUIPMENT AND
MATERIALS FIT PROPERLY AND CAN BE SERVICED. COORDINATE
ALL WORK WITH OTHER TRADES.
B. COORDINATE LOCATION OF GRILLES AND DIFFUSERS WITH
ARCHITECTURAL REFLECTED CEILING PLANS.
C. COORDINATE DUCTWORK WITH LIGHT FIXTURE SUPPORTS,
CONDUIT, PLUMBING, FIRE PROTECTION PIPING AND OTHER
TRADES.
D. ALL CONTROL WIRING SHALL BE BY MECHANICAL CONTRACTOR.
E. SEAL AROUND ALL PENETRATIONS.
F. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE FOLLOWING
REGULATIONS, CODES, AND STANDARDS.
KENTUCKY BUILDING CODE
KENTUCKY MECHANICAL CODE
KENTUCKY PLUMBING CODE
SMACNA HVAC DUCT CONSTRUCTION STANDARDS
OSHA
G. ROUTE DUCTWORK AS SHOWN ON PLAN; FIELD VERIFY ROUTING,
AND CLEARANCES. PREFABRICATE AS MUCH DUCT AS POSSIBLE.
ALLOW FOR FIELD TRIM AND ADJUSTMENTS. COORDINATE ANY
CONFLICTS WITH ARCHITECT PRIOR TO INSTALLATION.
H. FIRESTOP ALL FIRE-RATED WALL OR FLOOR PENETRATIONS.
I. ROUTE ALL DUCTWORK AS TIGHT AS POSSIBLE TO BOTTOM OF
STRUCTURE AND HIGH BETWEEN STRUCTURE. COORDINATE WITH
OTHER TRADES TO MAINTAIN CEILING HEIGHTS.
J. ADJUST TOTAL SYSTEM AIRFLOW REQUIRED TO MEET DESIGN.
K. ALL SUPPLY AND RETURN DUCTWORK SHALL BE EXTERNALLY
INSULATED.
L. ALL THERMOSTATS SHALL BE MOUNTED AT 60" A.F.F. UNLESS
NOTED OTHERWISE. WHEN AN ELECTRICAL SWITCH OR OTHER
DEVICE IS MOUNTED IN THE SAME LOCATION AS A THERMOSTAT,
ALL DEVICES SHALL BE ALIGNED VERTICALLY. VERIFY ALL
THERMOSTAT LOCATIONS WITH ARCHITECT PRIOR TO
INSTALLATION.
M. COORDINATE PIPE ROUTING WITH ALL TRADES. EQUIPMENT SHALL
MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES AS
REQUIRED.
N. REFERENCE REFLECTED CEILING PLAN FOR TYPES AND HEIGHTS
OF CEILINGS.
O. CERTIFIED TEST AND BALANCE CONTRACTOR SHALL BALANCE
NEW AND EXISTING DIFFUSERS AND VAV BOXES TO NOTED
AIRFLOWS. TAB CONTRACTOR SHALL BE BY OWNER.
P. PIPING, DUCTWORK, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED
FROM ROOF DECK. SUPPORT FROM STRUCTURE.
Q. REMOVE ABANDONED DUCTWORK AND PIPING IN CEILING CAVITY.
RE-SUPPORT DUCTWORK TO REMAIN AS REQUIRED.
1/4" = 1'-0"
KITCHEN HVAC PLAN
1/4" = 1'-0"
KITCHEN HVAC DEMOLITION PLAN
1'0' 2' 4'
North
1'0' 2' 4'
North
M2 REMOVE RETURN AIR GRILLE.
GRILLES AND DIFFUSERS SCHEDULE
SYMBOL MANUF. TYPE PANEL SIZE CORE TYPE INLET SIZE MAX. CFM THROW FEET
PRESSURE
DROP(IN.) SOUND N.C. MOUNTING REMARKS
S-1 PRICE ASPD 24"x24" SQUARE PLAQUE 10"ø 380 10 0.09 20 LAY-IN ALUMINUM
R-1 PRICE 81 24"x24" EGG CRATE 22"x22" 1860 - 0.05 20 LAY-IN 1/2"x1/2"x1" ALUMINUM
NOTES:
1. THROW DATA FOR SQUARE DIFFUSERS ARE BASED ON 4-WAY THROW TERMINAL VELOCITY AT 50 FPM.
2. PROVIDE APPROPRIATE MOUNTING HARDWARE FOR FLUSH MOUNTED FRAMES WHERE REQUIRED. SEE REFLECTED CEILING PLANS FOR TYPE OF CEILING.
M3 CONNECT 14"ø GREASE DUCT TO 15"x10" DUCT
CONNECTION ON HOOD. TRANSITION AS REQUIRED.
M4 14"ø WELDED 16 GAUGE CARBON STEEL GREASE DUCT WITH
1-1/2" THICK, 6 PCF, GREASE DUCT FIRE BARRIER WRAP.
PROVIDE CLEANOUT IN SIDE OF DUCT.
M5 20"x14"x14" WYE FITTING WITH 20"ø GREASE DUCT UP TO 20"x20" CONNECTION AT FAN CURB. PROVIDE CLEANOUT
WITHIN 3FT OF FAN CONNECTION. CONNECTION SHALL BE
FLANGED, GASKETED AND BOLTED. GASKET AND SEALING
MATERIALS SHALL BE RATED FOR CONTINUOUS DUTY AT
MINIMUM 1,500°F TEMPERATURE.
M6 12"ø MUA SUPPLY DUCT CONNECTION TO 24"x16" ON HOOD.
TRANSITION AS REQUIRED. TYP. OF 4 LOCATIONS.
M7 24"x16" MUA SUPPLY DUCT UP TO MUA UNIT OF ROOF.
TRANSITION AT CONNECTION AS REQUIRED.
1/4" = 1'-0"
ROOF HVAC PLAN
1'0' 2' 4'
North
M8 MAKEUP-AIR UNIT ON ROOF. SEE FOOD SERVICE DRAWINGS
FOR MORE INFORMATION.
M9 KITCHEN HOOD EXHAUST FAN ON ROOF. SEE FOOD SERVICE
DRAWINGS FOR MORE INFORMATION.
M10 ROOFTOP EQUIPMENT WALKWAY AND GUARDRAIL SYSTEM
TO BE PROVIDED AND INSTALLED BY G.C. REFER TO
SPECIFICATION SECTION 077246 ROOF ACCESSORIES FOR
MORE INFORMATION.
ADDENDUM #3 02/05/24