Addendum Soccer PB 2.4.25.pdf
PDF 314 KB Posted
- Attached to
- Soccer Press Box
- Solicitation number
- RFP-PAS-250000001114-2
- Issued by
- Bay County, Michigan
About this file
This is Addendum No. 1 issued by Pinconning Area Schools on February 4, 2025, for the Pinconning Soccer Press Box RFP. Bids are due Thursday, February 13, 2025, at 1:30 pm in the Office of the Superintendent, with RFIs required to be submitted by February 7, 2025, at 5:00 PM. Prospective bidders must review all drawings and specifications, with special attention to RFP section #4 Scope of Services. The addendum contains no corrections to the RFP at this time.
The addendum adds a requirement for contractors to include a concrete landing pad outside the storage room doors in their proposals. The pad specifications are 4" thick x 3'-8" W x 11'-9" L, using 4,000 psi concrete with fiberglass mesh laid at a ¼" per foot slope away from the structure. Email proposals are permitted but require prior contact with the district representative listed in the RFP. The document includes the DLP Designs logo and company address in Pinconning, Michigan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Soccer Press Box.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pinconning Area Schools RFP Revisions Issued as Addendum No. 1 February 4, 2025 Pinconning Soccer Press Box
The following clarifications and/or Changes made to the Contract Documents are hereby made part of the Contract Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Proposal Form.
1. Bid date and time remains unchanged Bids are due on Thursday, February 13, 2025 at 1:30 pm in the Office of the Superintendent.
2. Prospective bidders are required to review ALL drawings and specifications and include all work as designated in your work scope. Special attention to RFP section #4 Scope of Services and this addendum.
3. RFI’s must be submitted no later than February 7, 2025 by the end of the business day (5:00
PM). If questions arise after this date, you must clarify your bid and/or supply a voluntary alternate so the owner can equally review and address all bids received.
4. RFP:
a. No corrections at this time.
5. General Notes/Clarifications:
a. Contractor shall include in their proposal a concrete landing pad outside of the storage room doors. Concrete pad shall be 4” thick x (Approximately) 3’-8” W x 11’-9” L. Concrete shall be 4,000 psi and include a fiberglass mesh laid at a slope of ¼” per foot away from the structure.
b. Email proposals are acceptable. If you are planning on emailing your proposal, please contact the district representative listed in the RFP. Email bidding will close out at the same time Bid Proposals are due.
End of Addendum #1