This is an Addendum One document issued by the City of Springfield for the Downtown Springfield Communications Fiber Project, modifying the Special Provisions and Specifications for the underlying construction contract. The addendum addresses two primary modifications to the original contract requirements. First, the City of Springfield will furnish the contractor with a 20,000-foot reel of Commscope 144 count loose-tube, light armored, gel-free fiber (part number D-144-LA-8W-F12NS) for use in the project, with the contractor required to return any unused fiber upon project completion; all other parts and accessories must be furnished by the contractor. Second, a revised Traffic Control Plan drawing prepared by the City's consulting engineer replaces pages 178 to 189 of the original Special Provisions and Specifications. The addendum was issued on October 1, 2026, and all bidders were required to acknowledge receipt of this addendum in the space provided in item C on page 1 of the Bid Form.

The revised Traffic Control Plan drawings included in the addendum provide detailed standards for work zone traffic control, intersection work zone details, signalized intersection details, and accessible routes with temporary pedestrian detours. These technical drawings establish requirements for temporary traffic control devices, lane closures, taper lengths, buffer zones, sign placement, pedestrian facilities, and ADA-compliant detours. The specifications reference Oregon Standard Drawings and Specifications effective June 1, 2026 through November 30, 2026, and indicate that all materials and design must comply with current Oregon Standard Specifications and generally accepted engineering principles under the responsibility of a registered professional engineer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Park Place HVAC Project – Addendum One Page 1 of 2

DOWNTOWN SPRINGFIELD COMMUNICATIONS FIBER PROJECT

Addendum One October 1, 2026

The Special Provisions and Specifications for the above-named Project are modified as follows:

1. The City of Springfield will furnish to the Contractor a 20,000 foot reel of Commscope 144 count loose-tube, light armored, gel-free fiber (Commscope part number “D-144-LA-8W- F12NS”) for use in the project. At Project completion, Contractor shall return any unused fiber to the City. All other parts and accessories for the Work are to be furnished by the Contractor.

2. A revised Traffic Control Plan drawing has been prepared by the City’s consulting engineer, and is included with this Addendum. This drawing replaces pages 178 to 189 of the Special Provisions and Specifications.

All Bidders must acknowledge receipt of this Addendum in the space provided in item C. on page 1 of the Bid Form.

END OF ADDENDUM ONE

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

MIL-353

Stamp

TM841

INTERSECTION WORK ZONE DETAILS

T M

.d g n

12-JUL-2024N/A

J U

L

L

T a p e r

T a p e r

A

AHEAD

CLOSED

RIGHT LANE

AHEAD

WORK

ROAD

NOTES:

W

W a

W

B u f f e r

B

A

B

A

AHEAD

ROAD

ROAD WORK

END

SHOULDER

RIGHT

AHEAD

WORK

ROAD

ROAD WORK

END

W

W

W

ROAD

L

T a p e r

Buffer "B"

8' B(III)R

8' B(III)R

Sequential Arrow

A

B

C

A

AHEAD

WORK

ROAD

ROAD WORK

END

ROAD WORK

END

W

30x30 R3-8 Series

30x30 R3-7

W

W

A

A

B

C

Sequential Arrow

8' B(III)R

A

A

T a p e r

NOTES:

MUST

RIGHT LANE

TURN RIGHT

LEFT

MERGE

TRAFFIC

THRU

ROAD

as shown or directed.

mandatory turn lanes, lane direction legends in more, place temporary

14 consecutive days or

When work is in place for

AHEAD

WORK

ROAD

AHEAD

RIGHT LANE

LEFT LANE

W

W

W

MUST

LEFT LANE

TURN LEFT

30x30 R3-7

Sequential Arrow

8' B(III)L

A

2 A

B

C

A

8' B(III)L

Sequential Arrow

A

T a p e r

50 - 100'

AHEAD

WORK

ROAD

W

L

T a p e r

B

T a p e r1

ROAD WORK

END

ONLYONLY

AHEAD

WORK

ROAD

W

W

W

TO STOP

PREPARED

BE

TO STOP

PREPARED

BE

ROAD WORK

END

AHEAD

WORK

ROAD

Buffer "B"

A

B

C

A

C

B

A

A

ROAD WORK

END

ROAD WORK

END

ROAD WORK

END

AHEAD

ROAD

W

W

W

W

A

A

Buffer "B"

8' B(III)R

A

B

C

Sequential Arrow

8' B(III)R

GENERAL NOTES FOR ALL DETAILS:

UNDER TRAFFIC

UNDER CONSTRUCTION

lanes, as shown or directed.

legends in mandatory turn place temporary lane direction

14 consecutive days or more, When work is in place for

3" L

3" L

L

48x24

CG20-2A

by the Engineer length is determined Left turn lane storage

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

48x24

CG20-2A

RIGHT LANE CLOSURE, FAR SIDE

4-Lane, 2-Way

LEFT LANE CLOSURE, FAR SIDE

4-Lane, 2-Way

SHOULDER CLOSURE

2-Lane, 2-Way

RIGHT LANE CLOSURE

2-LANE, 1-WAY

ONE LANE CLOSURE

2-Lane, 2-Way

RIGHT LANE CLOSURE, NEAR SIDE

4-Lane, 2-Way

Table on TM800 for max. spacing.

28" Tubular Markers See TCD Spacing

Table on TM800 for max. spacing.

Temp. Plastic Drums See TCD Spacing

(AFAD)

Automated Flagging Assistance Device

HERE ON

RED

STOP

24x36

R10-6

HERE ON

RED

STOP

24x36

R10-6

AHEAD

SIGNAL

W a

AHEAD

SIGNAL

W a

TM821, TM840 & TM854.

To be accompanied by Dwg. Nos. TM820, are expected.

Install a "BICYCLES ON ROADWAY" (CW11-1) sign in advance of the closure when a bike lane is closed, or when the shoulder is closed and bikes

Place channelizing devices around intersection radii, business accesses and driveways at 10' spacing.

Where shoulder width is limited, Sequential Arrow may be placed within the lane closure taper.

Tubular markers may be used in lane closure tapers where posted speed is 40 mph or less.

When a through road intersects within the work zone, place a "ROAD WORK AHEAD" (W20-1) sign in advance of the intersection at sign spacing A.

To determine sign spacing A, B, and C, use "TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. TM800.

"LEFT LANE ENDS" (W4-2L) symbol sign, or "LEFT SHOULDER CLOSED" (W21-5a) sign, where applicable.

For left lane or shoulder work, place TCD to close left lane or shoulder. Use "LEFT LANE CLOSED AHEAD" (W20-5) sign, To determine Taper Length ("L") and Buffer Length ("B"), use the "MINIMUM LENGTHS TABLE" on Dwg. TM800.

The "SIGNAL AHEAD" (W3-3a) sign may be substituted with the signal ahead symbol (W3-3) sign.

Additional Traffic Control Measures (TCM) may be required for all legs of the intersection.

Added AFADs to drawing.01-2022

07-2024 Fixed a typo.

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: June 1, 2026 - November 30, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

TM842

SIGNALIZED INTERSECTION DETAILS

T M

.d g n

19-JAN-2024N/A

J A

N

ROAD

W

A

A

(Mount on Single Post TSS)

24x24

R3-2 B u f f e r

B

T a p e r

L

A

A

B

C

C W

C W

W

1AHEAD

WORK

ROAD

AHEAD

CLOSED

TURN LANE

LEFT

CLOSED

TURN LANE

LEFT

W

W

W

GENERAL NOTES FOR ALL DETAILS:

A A

B

2" L

T a p e r

B u f f e r

B

3" L

2 - 8' B(III)R

T a p e r

L

2" L

T a p e r

A

B

C

A

(Mount on Single Post TSS)

24x24

R3-2

(Mount on TSS)

24x24 R3-2

C W

C W

W

1AHEAD

WORK

ROAD

AHEAD

CLOSED

TURN LANE

LEFT

CLOSED

TURN LANE

LEFT

AHEAD

WORK

ROAD

(Mount on Single Post TSS)

24x24

R3-2

A

A

B

3" L

T a p e r

L

8' B(III)R

T a p e r

L

2" L

T a p e r

A

B

C

A

W

C W

C W

W

W

W

1AHEAD

WORK

ROAD

(Mount on Single Post TSS)

30x30

R3-8

ONLYONLY

(Mount on TSS)

(Mount on Single Post TSS)

24x24

R3-2

24x24

R3-2

CLOSED

TURN LANE

LEFT

AHEAD

CLOSED

TURN LANE

LEFT

AHEAD

WORK

ROAD

Signal

TM800 for max. spacing

See TCD Spacing Table on

28" Tubular Markers

TM800 for max. spacing

See TCD Spacing Table on

Temp. Plastic Drums

UNDER TRAFFIC

UNDER CONSTRUCTION

To be accompanied by Dwg. Nos. TM820 & TM821.

Signal timing adjustments determined by Engineer.

Install a "BICYCLES ON ROADWAY" (CW11-1) sign in advance of the closure when a bike lane is closed, or when the shoulder is closed and bikes are expected.

Tubular markers may be used in lane closure tapers where the posted speed is 40 mph or less.

Place channelizing devices around intersection radii, business accesses, and driveways at 10' spacing.

To determine sign spacing A, B, and C, use "TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. TM800.

When a through road intersects within the work zone, place a "ROAD WORK AHEAD" (W20-1) sign in advance of the intersection at sign spacing A.

Taper length of "L"/2 for center turn lane closure may be used in areas with a high number of accesses within the work zone.

Taper length of "L" for through lane shifting tapers may be used for higher speed roads.

To determine Taper Length ("L") and Buffer Length ("B") shown on this sheet, use the "MINIMUM LENGTHS TABLE" on Dwg. TM800.

Additional Traffic Control Measures (TCM) may be required for all legs of the intersection.

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

LEFT TURN MEDIAN CLOSURE

2-Lane, 2-Way Roadway With Left Turn Median

RIGHT LANE CLOSURE, NEAR SIDE

2-Lane, 2-Way Roadway With Left Turn Median

RIGHT LANE CLOSURE, FAR SIDE

2-Lane, 2-Way Roadway With Left Turn Median the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: June 1, 2026 - November 30, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM844

ACCESSIBLE ROUTES

TEMPORARY PEDESTRIAN

T M

.d g n

14-JUL-2023N/A

J U

L

GENERAL NOTES FOR ALL DETAILS:

DETOUR

(Mount on PCD)

30x24

M4-9b

INSET "A"

sidewalk

Existing

(Mount on PCD)

30x24

M4-9b

DETOUR

"W" sidewalk.

side of existing

PCD along each

Place 4' (min.) of non-traversable surfaces.

to cross planter strips or other

Use temporary ADA compliant surfaces passing spaces every 200 ft.

provide 48" min. width with 60" x 60" maintained through the entire route, "W" = 60", or, where 60" width cannot be details.

See inset "A" for Temp. Sidewalk Ramp posted speed of 40 mph or less.

For roadways with a pre-construction ramp, as needed.

Place or construct temp. sidewalk

NOTES:

NOTES:

pipe

Drain

Ramp sidewalk.

side of existing

PCD along each

Place 4' (min.) of

"W"

T e m p

S id e w a lk

(Mount on PCD)

30x24

M4-9b

(Mount on PCD)

30x24

M4-9b

DETOUR

DETOUR

DETOUR DETOUR

DETOUR

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

24x18

R9-11

SIDEWALK CLOSED

AHEAD

CROSS HERE

See INSET "B"

PCD 48", min.

48", min.

PCD

CLOSED

SIDEWALK

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

DETOUR

(Mount on B(II)R)

24x18

R9-11

CROSS HERE

SIDEWALK CLOSED

SIDEWALK CLOSURE, MIDBLOCK

To be accompanied by Dwg. Nos. TM820 & TM821.

Minimize pedestrian out-of-direction travel.

maintain one open sidewalk at all times.

access route at all times. For roadways with no available detours, Stage work, as necessary, to provide a temporary pedestrian necessary to control vehicular traffic.

Only TCD for pedestrians are shown. Other devices may be

60" x 60" passing spaces every 200 feet along the route.

pedestrian route. If not possible, provide 48" min. width with

Provide non-slip, 60 inch minimum wide surface through entire adequate slope transitions and surfacing.

features consistent with existing pedestrian facilities by providing facilities provide ADA compliant facilities. Include accessibility

When closing or relocating crosswalks or other pedestrian

UNDER CONSTRUCTION

UNDER PEDESTRIAN TRAFFIC

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)L)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

(Mount on B(II)R)

30x24

M4-9b

See INSET "C" and detour length.

to minimize pedestrian distruption

Limit work to one corner at a time

NOTE:

PCD

48", min.

, m in

P C

D

SIDEWALK CLOSURE, CORNER

(Mount on B(II)R)

24x18

R9-11

(Mount on B(II)R)

24x18

R9-11

DETOUR DETOUR

DETOUR

DETOUR

SIDEWALK CLOSED

AHEAD

CROSS HERE

CLOSED

SIDEWALK

DETOUR

DETOUR

SIDEWALK CLOSED

AHEAD

CROSS HERE

DETOUR

DETOUR

(Mount on PCD)

24x24

OR22-7

DEVICE (PCD)

PEDESTRIAN CHANNELIZING

SIDEWALK DIVERSION

Within Roadway

SIDEWALK DIVERSION

Additional Right of Way

(Closure Detail)

INSET "B"

(Closure Detail)

INSET "C"

(Temp. Sidewalk Ramp)

INSET "A"

(2 Reqd.)

(Mount on PCD)

24x12

R9-9

(2 Reqd.)

(Mount on PCD)

24x12

R9-9 cross slope of 2.0%.

8.3% and max. finished finished surf. slope of requirements incl. max.

Ramp must meet ADA

Ramp size will vary.

REVISION DESCRIPTIONDATE

CROSSWALK

CLOSED

(Mount on PCD)

24x24

OR22-7

CROSSWALK

CLOSED

01-2022 Revised notes for temporary sidewalk ramp.

07-2023 OR22-8 signs were replaced with OR22-7 signs.

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: June 1, 2026 - November 30, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

File details come from the government source that posted it. Updated .