This is an addendum to an Invitation to Bid (RFB-203-23) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for HVAC removal and installation at Western State Hospital Building 15 in Hopkinsville, Kentucky, under the Cabinet for Health and Family Services. The addendum clarifies specifications and contractor responsibilities for the project. Key clarifications include that the contractor is responsible for bush removal at the AHU-2 location, provision of stand-alone controls with BACnet cards for future integration, ceiling patching using sheet metal and paint to match existing conditions, and material storage and staging coordination with the owner. The contractor may work four 10-hour shifts with owner coordination. Typical construction hours are 7:00 AM to 4:00 PM, Monday through Friday, with work outside these hours requiring owner approval.
The contractor is not responsible for testing, adjusting, and balancing (TAB) but must schedule TAB services and correct any resulting deficiencies. Wage rates do not apply to this contract. The HVAC units will operate as stand-alone controls and will not be integrated into a building management system at this time, though BACnet interface capability is required for potential future integration. All materials must be stored outside the building, with the contractor responsible for equipment storage prior to work commencement. Additional specifications and changes to drawings are referenced in an addendum to be distributed by Lynn Imaging.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2300000506_2_SO_FORM.PDF | ||
| Final_RFB_785_2300000506_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-203-23
FOR: HVAC Removal & Install Western State Hospital-Building 15 Cabinet for Health and Family Services Hopkinsville, Kentucky
DATE: February 23, 2023
RFB-785-2300000506
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-203-23 For: HVAC Removal & Install Western State Hospital-Building 15 Cabinet for Health and Family Services Hopkinsville, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Addendum One Project: Western State Hospital Building 15 HVAC Upgrades
1. Contractor questions:
•QUESTION: Who is responsible for removing the bush where AHU-2 is going?
ANSWER: The contractor is responsible for removal an disposal of the bush.
• QUESTION: Who is providing controls? ANSWER: The controls will be stand alone controls and shall be provided by the contractor. The AHUs shall be provided with BACnet card for integration into a future controls project. Comfort Systems USA provides current controls in hospital.
• QUESTION: How are we to patch the ceiling in the north room? ANSWER: Patching with sheet metal and painting to match existing is acceptable.
• QUESTION: Are four 10 hour shifts acceptable? ANSWER: Yes. Coordinate hours of work with owner.
2. Clarification: Wage rates do not apply
3. Material storage and staging to be coordinated with the owner. No materials will be stored inside the building. Contractor is responsible for storing equipment prior to this.
4. Typical construction hours, 7:00 AM – 4:00 PM, Monday through Friday. Work to be completed outside of these hours shall be scheduled with the Owner.
5. The contractor is not responsible for TAB but shall be responsible for scheduling TAB and correcting any deficiencies.
6. Units will be stand-alone controls and won’t be integrated into a BMS at this time. They shall be provided with BACnet interface for integration for a future project.