This is an Addendum One to Invitation to Bid No. RFB-71-27, issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the re-advertisement of stalls and mats for new competition barns BP-2 at the Kentucky Horse Park in Lexington, Kentucky. The project involves the procurement and installation of rubber stall mats and equine equipment for new barn construction. The addendum dated September 10, 2026, clarifies specifications regarding attic stock materials and provides responses to contractor questions regarding the scope of work. Key clarifications include: 15 additional 12' x 10' stall mat kits for Alternate #1 only; attic stock materials required in total for the overall project, not per individual barn; authorization for the stall mockup to be constructed as one of the permanent stalls and remain in place upon approval; and confirmation that the Kentucky Horse Park owner will be responsible for cleaning and preparing existing barn areas prior to rubber mat installation.
The addendum addresses specification requirements for stall manufacturers by clarifying that only four manufacturers listed in the specifications are approved for bidding without further review. Bidders wishing to propose alternative manufacturers must submit the manufacturer's resume and portfolio for review by the architect and owner during the bidding period, with approval required before authorization to bid. The document references specification section 096540 for rubber stall mats and section 110001 for equine equipment, indicating these are the primary technical specifications governing the procurement. No pricing information, set-asides, funding sources, or contract term details are provided in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-71-27
FOR: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky
DATE: September 10, 2026
RFB-785-2700000110
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-71-27 For: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
KHP - Stalls and Mats for New Competition Barns BP-2 – Re Bid
665-CBTF-HP97-01
Kentucky Horse Park Lexington, KY
EOP Architects • 201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538 • fax 859.255.4380 • www.eopa.com
Addendum 1
Date: 9-10-26
Addendum 1 Items:
Contractor Questions:
Question 1: I’m submitting a question related to the stall and stall mat project at the Kentucky
Horse Park. The rubber stall mat specification (096540) includes a provision for some attic stock material. I’ve provided a snapshot of the added stock below for reference.
Since all of the rubber stall mats are alternates, should we include this attic stock separately with each of the first four alternates, which are the 12' x 10' barns (i.e. 15 additional stall kits per alternate)? Or should we include the added stock in the base bid, or with only one of the alternates?
I’m just trying to get some clarity on how many times this attic stock provision is applicable and where we should carry it within our estimate.
Response: PROVIDE 15 (12’X10’) ADDITIONAL STALL MAT KITS FOR ALTERNATE #1 ONLY.
Question 2: I wanted to follow up with a few additional project questions regarding Specification
110001 – Equine Equipment:
1. Attic Stock: Please confirm that the attic stock material identified in Section 1.4 is required in total and is not required per barn under Section 1.7.
2. Stall Mockup: Please verify that the stall mock up can be constructed as one of the new permanent stalls and can remain in place as part of the completed work.
3. A separate question related to the Interlocking Rubber Stall Mats alternates: For the stall mats being installed in the existing barns that are not part of the current barn
KHP – Stalls and Mats for New Competition Barns BP-2 – Rebid Kentucky Horse Park
Addendum-1 BP-2 Account # 665-CBTF-HP97-01
EOP Architects • 201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538 • fax 859.255.4380 • www.eopa.com construction project, who is responsible for cleaning and mucking those areas prior to installation of the interlocking rubber mat kits?
Response: 1. THE ATTIC STOCK PER SECTION 1.4 IS REQUIRED IN TOTAL, AND IS NOT
REQUIRED PER BARN.
2. THE STALL MOCKUP CAN BE CONSTRUCTED AS ONE OF THE NEW
PERMANENT STALLS AND CAN REMAIN IN-PLACE AS PART OF THE
COMPLETED WORK ONCE FULLY APPROVED. ONLY 1 MOCKUP WILL BE
REQUIRED FOR THE OVERALL PROJECT.
3. THE OWNER (KHP) WILL MUCK AND CLEAN THE EXISTING AREAS PRIOR TO
INSTALLATION OF THE INTERLOCKING RUBBER MATS.
Question 3: Is the stall manufacturer a locked spec or can I bring another unlisted manufacturer to the table?
Response: ONLY THE FOUR MANUFACTURERS LISTED IN THE SPECIFICATIONS ARE
ALLOWED TO BID WITHOUT FUTHER REVIEW. IF AN ALTERNATE
MANUFACTURER WOULD LIKE TO SUBMIT FOR BID, THEY WOULD NEED TO
PROVIDE A RESUME AND PORTFOLIO TO BE REVIEWED DURING THE BIDDING
PERIOD BY THE ARCHITECT AND OWNER, AND IF APPROVED, WOULD ONLY
THEN BE ALLOWED TO BID ON THE PROJECT.
End of Addendum
| Addendum One |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |