Addendum Four.pdf

PDF 228 KB Posted

Attached to
RFB-71-27 KHP Stalls & Mats New Comp Barn BP-2
Solicitation number
RFB 785 2700000110 6
Issued by
Kentucky

About this file

This is Addendum Four to Invitation to Bid No. RFB-71-27, issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the re-advertisement of stalls and mats for the New Competition Barns BP-2 at Kentucky Horse Park in Lexington, Kentucky. The project, identified as account number 665-CBTF-HP97-01, involves the construction and installation of stalls and mats within the specified barn facility. The addendum was issued on September 16, 2026, and addresses clarifications to specifications and drawings necessary for bidders to prepare accurate proposals.

The addendum clarifies several technical specifications in response to contractor questions and adds approved manufacturers to the specifications. Key clarifications include: powder-coated finish (not hot-dip galvanized) is required over 14-gauge 2-inch square galvanized tube frames; powder-coat color will be light gray selected by the architect and owner post-award to match recently constructed barns C and D; grillwork must use 1-inch-diameter tubes spaced 3 inches on center; all square tubing must be 2 inches per specifications; and HDPE panel color must be light gray to match adjacent structures. The architectural addenda add three approved manufacturers to Section 2.1 Manufacturers: Triton Barn Systems (Section 110001), Barnwalkers (Section 110001), and Grytfit/Humane Manufacturing LLC (Section 096540). These modifications become binding upon the contract issued in response to this invitation to bid.

View the file

Other files

File Type Posted
Addendum Two.pdf PDF
Final_RFB_785_2700000110_6_SO_FORM.PDF PDF
Final_RFB_785_2700000110_5_SO_FORM.PDF PDF
Final_RFB_785_2700000110_1_SO_FORM.PDF PDF
Addendum One.pdf PDF
Final_RFB_785_2700000110_4_SO_FORM.PDF PDF
Final_RFB_785_2700000110_3_SO_FORM.PDF PDF
Addendum Three.pdf PDF
Final_RFB_785_2700000110_2_SO_FORM.PDF PDF
Addendum Five.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-71-27

FOR: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky

DATE: September 16, 2026

RFB-785-2700000110

ADDENDUM NO. Four (4)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-71-27 For: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

KHP - Stalls and Mats for New Competition Barns BP-2 – Re Bid

665-CBTF-HP97-01

Kentucky Horse Park Lexington, KY

EOP Architects • 201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538 • fax 859.255.4380 • www.eopa.com

Addendum 4

Date: 09-15-2026

Addendum 4 Items:

Contractor Questions:

1. Finish: Is a powder-coated finish required, or would hot-dip galvanized steel be acceptable?

Answer: A powder-coated finish is required over 14-gauge 2” square galvanized tube frame per the specifications.

2. Powder-Coat Color: If powder coating is required, please provide the specified RAL color number.

Answer: Color to be selected by Architect and owner after award of bid, but will be a light gray to match the recently constructed barns C and D.

3. Grill Tubing: May the grillwork use 7/8-inch-diameter tubes spaced 3-1/4 inches on center, or are 1-inch-diameter tubes spaced 3 inches on center required?

Answer: Per the specifications, 1-inch-diameter tubes spaced 3 inches on center are required.

4. Door Frame: The stall frame will be constructed from 2-inch square tubing. May the door frame be constructed from 1-3/4-inch square tubing?

Answer: No, all square tubing to be 2” square per the specifications and drawings.

5. Puckboard Color: Please confirm whether the puckboard should be white.

Answer: If you are referring to the HDPE panels, per the specifications, the color is to be light gray to match the recently constructed barns C and D, and to be selected by Architect and owner after award of bid.

Architectural Addenda Items (A):

Specifications:

Item A1: See specification Section 110001: Refer to Section 2.1 MANUFACTURERS. Add f. Triton Barn Systems

Item A2: See specification Section 110001: Refer to Section 2.1 MANUFACTURERS. Add g.

Barnwalkers

KHP – Stalls and Mats for New Competition Barns BP-2 – Rebid Kentucky Horse Park

Addendum-4 BP-2 Account # 665-CBTF-HP97-01

EOP Architects • 201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538 • fax 859.255.4380 • www.eopa.com

Item A3: See specification Section 096540: Refer to Section 2.1 MANUFACTURERS. Add e.

Grytfit / Humane Manufacturing LLC.

End of Addendum

Addendum Four
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM

CBTF_BP-2_Re Bid_Addendum 4

File details come from the government source that posted it. Updated .