Addendum One .pdf
PDF 8 MB Posted
- Solicitation number
- RFB 785 2400000488 5
- Issued by
- Adair County, Kentucky
About this file
This is Addendum One to an Invitation to Bid (RFB-211-24) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Sewage Grinder Pit Relocation project at the Adair Youth Development Center operated by the Department of Juvenile Justice in Adair County, Kentucky. The project involves the relocation and installation of a new duplex submersible grinder pump station to replace an existing pump station, including associated plumbing, electrical, and site work. The scope includes removal of the existing pump station and control panel, installation of new underground gravity sanitary piping routed to a new duplex grinder pump station with traffic-rated split cover, installation of new pump discharge piping approximately 750 linear feet around the building, electrical feeder installation from the existing emergency power panel, and replacement of pavement and concrete slabs as required. The addendum, dated March 6, 2024, directs bidders to refer to specifications and drawings to be distributed by Lynn Imaging for all additions, deletions, and changes to specifications and drawings. The documents include detailed plumbing plans (existing, demolition, and new work), electrical power plans, and comprehensive specifications for the duplex pump package manufactured by Landia.
The project specifications require the duplex pump station to operate at 150 gallons per minute at 11 feet of total dynamic head with two submersible chopper pumps (Model DG-I-65 or approved equal), powered by 17.9 horsepower motors at 208 volts, 60 Hz, three-phase. The contractor must provide a one-year warranty from the date the pump station is tested and placed in service, including all necessary adjustments, repairs, and maintenance to ensure guaranteed capacities and performances. All work must comply with current state and local building codes, with permits and fees secured by the contractor and included in the bid price. The contractor is required to provide temporary restroom facilities throughout construction, maintain the existing pump station operational until the new system is tested and reconnected, and ensure that a manufacturer's accredited representative supervises installation and testing and provides operating and maintenance instruction to owner personnel. The existing pump station equipment to be removed must be returned to the owner in good condition, and the contractor must contact all utility companies prior to demolition and excavation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-211-24
FOR: Sewage Grinder Pit Relocation Adair Youth Development Center Department of Juvenile Justice Adair County, Kentucky
DATE: March 6, 2024
RFB-785-2400000488
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-211-24 For: Sewage Grinder Pit Relocation Adair Youth Development Center Department of Juvenile Justice Adair County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
4"PD
(E )3
/4 "G
(E )1
"C W
(E)3/4"G
(E)3"CW
(E)ELEC
(E)ELEC
(E)ELEC
(E)3"G (E)3"G (E)3"G
(E)3"CW (E)3"CW
(E)ELEC
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-E
LE
C
\2
E1 .0
PA
R
TI
AL
E
LE
C
TR
IC
AL
P
O W
ER
P
LA
N
.d w g
W ed ne sd ay , M ar ch
6, 7:
A
M Th e R ob er ts G ro up
G re g
El am
TRG #23035
E1.0
EXPIRATION: 06/30/2025
RTA 02/16/2024
PARTIAL ELECTRIC POWER PLAN - NEW WORK
1 PARTIAL ELECTRICAL PLAN - NEW WORK
1/8" = 1'-0"
GENERAL NOTES:
A. EXISTING UTILITY LOCATIONS INDICATED ON THESE DRAWINGS ARE
BASED ON AS-BUILT DRAWINGS PROVIDED AFTER COMPLETION OF THE
ORIGINAL PROJECT. IN ADDITION TO CONTACTING ALL SUPPORTING
UTILITY COMPANIES AND SERVICES TO PROVIDE A MORE PRECISE UP TO
DATE LOCATION OF EACH SERVICE. LOCATIONS INDICATED ARE SHOWN
TO THE BEST OUR ABILITY. HOWEVER, THE CONTRACTOR SHALL STILL
CONFIRM EXACT UTILITY LOCATIONS AND TAKE PROPER PRECAUTIONS
DURING EXCAVATION AND CONSTRUCTION.
SHEET KEYED NOTES:
1. EXISTING PANEL EB, 120/208 VOLT, 3-PHASE WITH 3-POLE, 50 AMP BREAKER
FEEDING EXISTING PUMP STATION CONTROL PANEL. BREAKER TO BE RE-LABELED
AS SPARE AFTER NEW PUMP STATION IS ON LINE.
2. EXISTING OVERHEAD CONDUIT AND FEEDER TO EXISTING PUMP STATION
CONTROL PANEL. DISCONNECT AND REMOVE COMPLETE AFTER NEW PUMP
STATION IS ON LINE.
3. EXISTING PUMP STATION AND CONTROL PANEL TO BE REMOVED AFTER NEW
PUMP STATION IS ON LINE. RETURN CONTROL PANEL AND PUMPS TO OWNER IN
GOOD CONDITION.
4. NEW SUBMERSIBLE GRINDER PUMP STATION. PROVIDE POWER AND CONTROLS
FROM CONTROL PANEL TO PUMPS AS REQUIRED.
5. NEW PUMP STATION CONTROL PANEL PROVIDED WITH EQUIPMENT, INSTALLED
BY CONTRACTOR. COORDINATE EXACT LOCATION AND METHOD OF MOUNTING
WITH PUMP STATION SUPPLIER. PROVIDE STATUS AND CONTROL SIGNALS FROM
PANEL TO BUILDING AS REQUIRED BY OWNER.
6. EXISTING 1200 AMP, 120/208 VOLT, 3-PHASE EMERGENCY POWER PANEL EDP.
INSTALL A 175 AMP, 3-POLE CIRCUIT BREAKER IN EXISTING SPACE IN PANEL TO
FEED NEW PUMP STATION CONTROL PANEL.
7. NEW FEEDER FROM PANEL EDP TO NEW PUMP STATION, 3-#1/0, 1-#6 GROUND
IN 2" CONDUIT. INTERIOR CONDUIT TO BE TYPE EMT, EXTERIOR EXPOSED
CONDUIT TO BE SCHEDULE 80 PVC OR RIGID GALVANIZED STEEL AS DIRECTED BY
OWNER. UNDERGROUND CONDUIT TO BE SCHEDULE 40 PVC.
8. ROUTE FEEDER ACROSS ELECTRICAL ROOM NEAR CEILING. COORDINATE EXACT
ROUTING WITH EXISTING SITE CONDITIONS.
9. PENETRATE EXTERIOR WALL WITH CONDUIT AND COMPLETELY SEAL AROUND
CONDUIT PENETRATION. TURN CONDUIT DOWN WALL TO UNDERGROUND.
10. UNDERGROUND FEEDER TO NEW CONTROL PANEL, TURN UP INTO BOTTOM OF
PANEL. CONDUIT TO BE BURIED MINIMUM 24" DEEP TO TOP OF CONDUIT. USE
4" SAND BELOW AND ALL AROUND CONDUIT. BACKFILL REMAINDER OF TRENCH
WITH CLEAN EARTH BACKFILL.
KEY PLAN
4"
PD
6"SAN6"SAN
EXIST
XFRMR
(E )4"
GW
4"PD
DUPLEX
PUMP
STATIONEXIST
GREASE
TRAP
(E)6"SAN
(E)CO
(E)CO
(E)4"SAN
(E)4"SAN
(E )4
"S
AN
(E)4"SAN
(E)3"G (E)3"G (E)3"G
(E)6"SAN
(E )6
"S
AN
(E)ELEC
(E)ELEC
(E)ELEC
(E)ELEC
(E)6"SAN
CO
CO
CO (E)CO
VALVE
VAULT
UG
X
AutoCAD SHX Text
VAUGHN
AutoCAD SHX Text
ROBERTS
AutoCAD SHX Text
HILL
AutoCAD SHX Text 13329
(E)4"PD
MECH
CORRIDOR
DAYROOM
DAYROOM
105F
CELL
105E
CELL
105G
CELL
105H
CELL
106F
CELL
106E
CELL
106G
CELL
106H
CELL
VEST
STORAGE
COMMUNICATIONS
JANITOR
INTERVIEW
OFFICE
R.R.
VEST
OUTDOOR
STORAGE
406A
GYM
STORAGE
FREEZER
COOLER
VOCATIONAL
VOCATIONAL
TIME
OUT
CONFERENCE
PSY.
OFFICE
WORK
ROOM
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
R.R.
R.R.
STAFF
R.R.
STAFF
R.R.
CLASSROOM
CLASSROOM
CLASSROOM
LIBRARY/
COMPUTER
CLASSROOM/
REMEDIAL
JANITOR
406B
OFFICE
OFFICE
OFFICE
OFFICE
M104
STORAGE
BAY
M103
SHOP
BAY
M100A
MAINT.
BAY
M102 R.R.
OFFICE
(E)CO
(E)CO
(E)CO
(E)CO(E)CO
(E)CO
(E)CO
(E)CO(E)6"SAN
(E)4"SAN
(E)4"SAN
WH(E)
(E )6
"S
AN
(E )6
"S
AN
(E)6"SAN
(E )4
"S
AN
(E )3
/4 "G
(E )1
"C W
(E)3/4"G
(E)3"CW
(E)CO
(E)CO
(E )4
"P D
(E)CO
(E)6"SAN
(E)ELEC
(E)ELEC
(E)ELEC
(E)4"SAN
(E)3"G (E)3"G (E)3"G
(E)4"GW
(E )4"
GW
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
6"
ST
M (E
6"
ST
M
(E
(E)3"CW (E)3"CW
(E)ELEC
(E)6"SAN
(E )4"
SAN
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-P
LU
M
\2
P1 .0
PA
R
TI
AL
P
LU
M
BI
N
G P
LA
N
EX
IS
TI
N G
.d w g
W ed ne sd ay , F eb ru ar y
, 2
8:
A M
Th e
R ob er ts
G ro up
G re g El am
TRG #23035
P1.0
EXPIRATION: 06/30/2025
RTA 02/16/2024
PARTIAL PLUMBING PLAN -EXISTING
1 PARTIAL PLUMBING PLAN - EXISTING
1/8" = 1'-0"
GENERAL NOTES:
A. EXISTING UTILITY LOCATIONS INDICATED ON THESE DRAWINGS ARE
BASED ON AS-BUILT DRAWINGS PROVIDED AFTER COMPLETION OF THE
ORIGINAL PROJECT. IN ADDITION TO CONTACTING ALL SUPPORTING
UTILITY COMPANIES AND SERVICES TO PROVIDE A MORE PRECISE UP TO
DATE LOCATION OF EACH SERVICE. LOCATIONS INDICATED ARE SHOWN
TO THE BEST OUR ABILITY. HOWEVER, THE CONTRACTOR SHALL STILL
CONFIRM EXACT UTILITY LOCATIONS AND TAKE PRECAUTIONS DURING
EXCAVATION DURING CONSTRUCTION.
B. CONTRACTOR TO PROVIDE TEMPORARY RESTROOM FACILITIES WITH
REGULARLY SCHEDULED PUMPING AND SERVICE CYCLES FOR THE FULL
DURATION OF CONSTRUCTION.
C. THE EXISTING PUMP STATION IS TO REMAIN INTACT AND OPERATIONAL
UNTIL THE NEW PUMP STATION HAS BEEN STARTED, TESTED, AND
RECONNECTED TO EXISTING BUILDING MAIN SANITARY.
SHEET KEYED NOTES:
1. EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
2. EXISTING GREASE TRAP.
3. EXISTING WATER HEATERS.
4. EXISTING 4" VENT UP TO EXISTING 4" VTR.
5. EXISTING 4" SANITARY DISCHARGE ROUTED IN CEILING SPACE ABOVE.
KEY PLAN
EXISTING LEGEND
CW(EX) EXISTING COLD WATER
G(EX) EXISTING GAS SUPPLY
SAN(EX) EXISTING SANITARY SEWER
SAN-PD(EX) EXISTING SANITARY PUMP DISCHARGE
GW(EX) EXISTING GREASE WASTE
ELEC(EX) EXISTING ELECTRICAL
STM(EX) EXISTING STORM SEWER
CO(EX) EXISTING SEWER CLEANOUT
(E)4"PD
MECH
CORRIDOR
DAYROOM
DAYROOM
105F
CELL
105E
CELL
105G
CELL
105H
CELL
106F
CELL
106E
CELL
106G
CELL
106H
CELL
VEST
STORAGE
COMMUNICATIONS
JANITOR
INTERVIEW
OFFICE
R.R.
VEST
OUTDOOR
STORAGE
406A
GYM
STORAGE
FREEZER
COOLER
VOCATIONAL
VOCATIONAL
TIME
OUT
CONFERENCE
PSY.
OFFICE
WORK
ROOM
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
R.R.
R.R.
STAFF
R.R.
STAFF
R.R.
CLASSROOM
CLASSROOM
CLASSROOM
LIBRARY/
COMPUTER
CLASSROOM/
REMEDIAL
JANITOR
406B
OFFICE
OFFICE
OFFICE
OFFICE
M104
STORAGE
BAY
M103
SHOP
BAY
M100A
MAINT.
BAY
M102 R.R.
OFFICE
(E)CO
(E)CO
(E)CO
(E)CO(E)CO
(E)CO
(E)CO
(E)CO(E)6"SAN
(E)4"SAN
(E)4"SAN
WH(E)
(E )6
"S
AN
(E )6
"S
AN
(E)6"SAN
(E )4
"S
AN
(E )3
/4 "G
(E )1
"C W
(E)3/4"G
(E)3"CW
(E)CO
(E)CO
(E )4
"P D
(E)CO
(E)6"SAN
(E)ELEC
(E)ELEC
(E)ELEC
(E)4"SAN
(E)3"G (E)3"G (E)3"G
(E)4"GW
(E )4"
GW
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
(E )6
"S
AN
6"
ST
M (E
6"
ST
M
(E
(E)3"CW (E)3"CW
(E)ELEC
(E)6"SAN
(E )4"
SAN
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-P
LU
M
\2
P1 .1
PA
R
TI
AL
P
LU
M
BI
N
G P
LA
N
D
EM
O
LI
TI
O N
.d w g
W ed ne sd ay , F eb ru ar y
, 2
8:
A M
Th e
R ob er ts
G ro up
G re g El am
TRG #23035
P1.1
EXPIRATION: 06/30/2025
RTA 02/16/2024
PARTIAL PLUMBING PLAN - DEMOLITION
1 PARTIAL PLUMBING PLAN - DEMOLITION
1/8" = 1'-0"
GENERAL NOTES:
A. EXISTING UTILITY LOCATIONS INDICATED ON THESE DRAWINGS ARE
BASED ON AS-BUILT DRAWINGS PROVIDED AFTER COMPLETION OF THE
ORIGINAL PROJECT. IN ADDITION TO CONTACTING ALL SUPPORTING
UTILITY COMPANIES AND SERVICES TO PROVIDE A MORE PRECISE UP TO
DATE LOCATION OF EACH SERVICE. LOCATIONS INDICATED ARE SHOWN
TO THE BEST OUR ABILITY. HOWEVER, THE CONTRACTOR SHALL STILL
CONFIRM EXACT UTILITY LOCATIONS AND TAKE EVERY PRECAUTION TO
AVOID DAMAGE TO EXISTING UTILITIES DURING CONSTRUCTION.
SHEET KEYED NOTES:
1. EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.
2. EXISTING GREASE TRAP TO REMAIN.
3. EXISTING DUPLEX PUMP STATION. REMOVE COVER, PUMPS, VALVES,
FITTINGS, PIPING, CONTROL PANEL, CONDUIT, WIRING ETC. ASSOCIATED
WITH PUMP STATION. PIT SHALL BE BACKFILLED WITH ROCK TO A POINT
TO ALLOW FOR A MINIMUM 6" OF CONCRETE TO REPAIR SLAB.
COORDINATE REMOVAL OF ALL ITEMS WITH OWNERS REPRESENTATIVE.
TURN OVER ALL ITEMS OWNER ELECTS TO KEEP OR TO BE REUSED.
4. EXISTING 4" VENT UP TO EXISTING 4" VTR.
5. EXISTING 4" SANITARY PUMP DISCHARGE ROUTED ELEVATED THROUGH
SPACE.
6. EXISTING UNDERGROUND PUMP DISCHARGE ROUTED UP EXPOSED ON
WALL TO REMAIN.
7. EXISTING PUMP DISCHARGE DRAIN DOWN VALVE AND TERMINATION AT
EXTERIOR WALL TO REMAIN.
8. EXISTING TRANSFORMER TO REMAIN.
9. EXISTING EMERGENCY GENERATOR TO REMAIN.
10. EXISTING CHILLER TO REMAIN.
11. REMOVE EXISTING SLAB AND PIT AS REQUIRED TO EXPOSE BUILDING
EXISTING MAIN GRAVITY DISCHARGE. EXISTING GRAVITY DISCHARGE WILL
BE REROUTED TO NEW EXTERIOR DUPLEX PUMP STATION, SEE NEW
WORK DRAWINGS FOR MORE INFORMATION.
12. APPROXIMATE OUTLINE OF PAVEMENT REMOVAL AND EXCAVATION TO
ALLOW FOR NEW SANITARY PIPING AND DUPLEX PUMP STATION
INSTALLATION. SEE NEW WORK DRAWINGS FOR MORE INFORMATION.
13. EXISTING DUPLEX PUMP STATION CONTROL PANEL TO BE REMOVED.
14. EXISTING GAS REGULATOR AND SHUTOFF VALVE TO REMAIN.
15. EXISTING GAS MAIN BUILDING ENTRY TO REMAIN.
KEY PLAN
LEGEND
(E)CW EXISTING COLD WATER
(E)G EXISTING GAS SUPPLY
(E)SAN EXISTING SANITARY SEWER
(E)SAN-PD EXISTING SANITARY PUMP DISCHARGE
(E)GW EXISTING GREASE WASTE
(E)ELEC EXISTING ELECTRICAL
(E)STM EXISTING STORM SEWER
(E)CO EXISTING SEWER CLEANOUT
PIPE TURNING UP
PIPE TURNING DOWN
BFF BELOW FINISH FLOOR
AFF ABOVE FINISH FLOOR
VTR VENT THRU ROOF
ABV ABOVE
BLW BELOW
GAS COCK
GAS REGULATOR
CO CLEANOUT
4"PD
(E )3
/4 "G
(E )1
"C W
(E)3/4"G
(E)3"CW
(E)ELEC
(E)ELEC
(E)ELEC
(E)3"G (E)3"G (E)3"G
(E)3"CW (E)3"CW
(E)ELEC
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-P
LU
M
\2
P2 .0
PA
R
TI
AL
P
LU
M
BI
N
G P
LA
N
N
EW
W
O R
K.
dw g
W ed ne sd ay , F eb ru ar y
, 2
8:
A M
Th e
R ob er ts
G ro up
G re g El am
TRG #23035
P2.0
EXPIRATION: 06/30/2025
RTA 02/16/2024
PARTIAL PLUMBING PLAN - NEW WORK
1 PARTIAL PLUMBING PLAN - NEW WORK
1/8" = 1'-0"
GENERAL NOTES:
A. EXISTING UTILITY LOCATIONS INDICATED ON THESE DRAWINGS ARE
BASED ON AS-BUILT DRAWINGS PROVIDED AFTER COMPLETION OF THE
ORIGINAL PROJECT. IN ADDITION TO CONTACTING ALL SUPPORTING
UTILITY COMPANIES AND SERVICES TO PROVIDE A MORE PRECISE UP TO
DATE LOCATION OF EACH SERVICE. LOCATIONS INDICATED ARE SHOWN
TO THE BEST OUR ABILITY. HOWEVER, THE CONTRACTOR SHALL STILL
CONFIRM EXACT UTILITY LOCATIONS AND TAKE PROPER PRECAUTIONS
DURING EXCAVATION AND CONSTRUCTION.
SHEET KEYED NOTES:
1. CONNECT NEW GRAVITY BUILDING MAIN SANITARY TO EXISTING IN THIS
APPROXIMATE LOCATION. CONTRACTOR TO FIELD VERIFY EXACT
LOCATION. NEW PUMP STATION AND PIPING ARE TO BE TESTED AND
OPERATIONAL PRIOR TO THIS MAIN SANITARY LINE BEING SEVERED AND
THE NEW CONNECTION MADE.
2. CONNECT NEW SANITARY TO EXISTING.
3. CONNECT NEW SANITARY TO EXISTING GREASE TRAP.
4. NEW DUPLEX GRINDER PUMP STATION WITH TRAFFIC RATED SPLIT
COVER.
5. NEW PUMP STATION CONTROL PANEL. COORDINATE LOCATION WITH
EXISTING MOTOR OPERATED GATE.
6. NEW UNDERGROUND GRAVITY SANITARY PIPING ROUTED TO NEW DUPLEX
PUMP STATION CONNECTION AS INDICATED.
7. NEW UNDERGROUND PUMP DISCHARGE PIPING ROUTED TO CONNECTION
AS INDICATED.
8. CONNECT NEW PUMP DISCHARGE TO VALVED EXISTING DRAIN DOWN FOR
EXISTING SYSTEM. CAP EXISTING DISCHARGE INSIDE BUILDING AT FLOOR
LEVEL BELOW SHUTOFF VALVE.
9. EXISTING PUMP STATION POWERED FROM PANEL "EB" IN THIS
APPROXIMATE LOCATION.
10. NEW PUMP DISCHARGE TO BE ROUTED UNDERGROUND AROUND
BUILDING AND CONNECTING BACK INTO EXISTING NEAR GAZEBO
APPROXIMATELY 750LF. SEE SHEET P4.0 FOR MORE INFORMATION.
11. CONTRACTOR SHALL FIELD VERIFY EXACT MAIN BUILDING POWER
LOCATION. EVERY PRECAUTION SHALL BE TAKEN NOT LIMITED TO HAND
EXCAVATION TO AVOID DISRUPTION TO POWER.
12. APPROXIMATE LIMITS OF PAVEMENT AND SLAB REPLACEMENT.
CONTRACTOR TO REPLACE ANY PAVEMENT AND/OR SLAB REQUIRED TO
BE REMOVED FOR THIS PROJECT. ADDITIONAL PAVEMENT REMOVAL AND
REPLACEMENT WILL BE REQUIRED IF OWNER ELECTS TO PROCEED WITH
THE ALTERNATE ROUTING AROUND BUILDING. SEE SHEET P4.0 FOR
PROPOSED ROUTING.
13. SEE DETAIL #2 THIS SHEET FOR MORE INFORMATION.
KEY PLAN
4"
PD
6"SAN6"SAN
4"SAN
EXIST
XFRMR
(E )4"
GW
4"PD
DUPLEX
PUMP
STATION NEW PD ROUTING
EXIST
GREASE
TRAP
(E)6"SAN
(E)CO
(E)CO
(E)4"SAN
(E)4"SAN
(E )4
"S
AN
(E)4"SAN
(E)3"G (E)3"G (E)3"G
(E)6"SAN
(E )6
"S
AN
(E)ELEC
(E)ELEC
(E)ELEC
(E)ELEC
(E)6"SAN
CO
CO
CO (E)CO
VALVE
VAULT
2 ENLARGEMENT
1/4" = 1'-0"
6"SAN(E)6"SAN
ABANDON EXISTING PUMP
STATION CONNECTION.
CONNECT EXISTING MAIN
TO NEW ROUTED TO NEW
PUMP STATION.
CONNECT EXISTING SANITARY
MAIN TO NEW SANITARY MAIN
ROUTED TO NEW PUMP STATION.
EXISTING
PUMP
STATION TO
BE GRAVEL
FILLED
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-P
LU
M
\2
P3 .0
PL
U M
BI
N
G G
EN
ER
AL
N
O
TE
S
AN
D D
ET
AI
LS
.D
W G
W ed ne sd ay
, F eb ru ar y
, 2
8:
A
M Th e R ob er ts G ro up
G re g
El am
TRG #23035
P3.0
EXPIRATION: 06/30/2025
RTA 02/16/2024
PLUMBING - GENERAL NOTES AND SPECS FOR
DUPLEX GRINDER PUMP
1. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLANS FOR BUILDING DIMENSIONS.
2. THE SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED
HIMSELF WITH THE PLANS AND BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED, IF THEY COULD HAVE BEEN FORESEEN
HAD PROPER EXAMINATION BEEN MADE.
3. VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECT WITH LOCAL UTILITIES (DOMESTIC WATER, SANITARY SEWER, GAS, ETC.)
4. THE CONTRACTOR SHALL COOPERATE FULLY AMONG THE TRADES.
5. WASTE AND VENT PIPING SHALL BE SCHEDULE 40 OR 80, TYPE 1, GRADE 1, POLYVINYL CHLORIDE COMPOUNDS AS
DEFINED AND DESCRIBED IN TENTATIVE SPECIFICATIONS FOR RIGID PVC (ASTM DESIGNATION: D 2665, D 2949, F891 OR SCHEDULE 40 OR 30 ACRYLONITRILE-BUTADIENE-STYRENE COMPOUND AS DEFINED AND DESCRIBED IN STANDARD SPECIFICATIONS FOR ABS (ASTM DESIGNATION: D2661 OR F 628) IN LIEU OF CAST IRON WASTE AND VENT PIPING IF PERMITTED BY CODE. INSTALL PVC OR ABS PIPING PER CODE. PLUMBING CONTRACTOR SHALL INSTALL 4" SOIL, WASTE AND GREASE WASTE PIPING WITH A MINIMUM SLOPE OF 1/8" PER FOOT OR AS REQUIRED BY CODE.
6. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE PER LOCAL CODE REQUIREMENTS. REPLACE ANY AND ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT
CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF PROJECT.
7. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF THE WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION OF THE OWNER.
8. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED, AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS (U.O.N.). THEY MUST COMPLY WITH ALL FEDERAL A.D.A. REGULATIONS.
9. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED AND ALL WORK IN CONNECTION WITH THE INSTALLATION OF MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO ALL DEFECTS IN MATERIALS AND/OR WORKMANSHIP
OF ANY KIND.
10. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND AND STATE LAWS.
11. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR AND
INCLUDED IN THE BID PRICE.
12. ALL PIPING SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF STATE AND/OR LOCAL
CODES. COOPERATE AS REQUIRED WITH ALL AUTHORITIES HAVING JURISDICTION TO INSURE THAT PROPER MATERIALS AND WORKMANSHIP ARE USED. REQUIREMENTS OF STATE AND LOCAL CODES AND AUTHORITIES TAKE
PRECEDENCE OVER ANY INFORMATION WHICH IS INDICATED OR IMPLIED ON THESE DRAWINGS.
13. THE CONTRACTOR SHALL PERFORM AN ONSITE REVIEW OF DEMOLITION AREAS TO ACKNOWLEDGE ANY POSSIBLE
DIFFICULTIES OR CONCERNS.
14. ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED VERSION OF THE BUILDING CODE INCLUDING ALL THE SUPPLEMENTAL SECTIONS, AS WELL AS ANY APPLICABLE STATE, COUNTY OR LOCAL REGULATIONS.
15. VERIFY EXISTING CONDITIONS PRIOR TO START OF DEMOLITION AND CONSTRUCTION AND NOTIFY OWNER CONSTRUCTION MANAGER OF ANY DISCREPANCIES. PERFORM DEMOLITION AS REQUIRED FOR TIE-IN OF NEW WORK.
16. CONTRACTOR RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES PRIOR TO DEMOLITION AND EXCAVATION TO
BE PERFORMED OUTSIDE.
17. LOCATIONS OF UTILITIES SHOWN ON PLANS ARE APPROXIMATE, VERIFY WITH LOCAL UTILITY PRIOR TO BIDDING
18. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND ELEVATION OF ALL EXISTING SERVICES PRIOR TO
INSTALLING ANY NEW PIPE.
19. ALL HORIZONTAL SANITARY PIPING IS RUN BELOW GROUND UNLESS OTHERWISE NOTED.
1 GENERAL NOTES
NO SCALE
2 DUPLEX PUMP PACKAGE SPECIFICATIONS
NO SCALE
DEPARTMENT OF JUVENILE JUSTICE YOUTH DEVELOPMENT CENTER ADAIR COUNTY - COLUMBIA, KENTUCKY
3 DUPLEX PUMP DETAIL
NO SCALE
TOP RAIL SUPPORT
(BOLTS TO COVER FRAME)
GATE
VALVE
FLASHING ALARM LIGHT
FLOAT MTG.
BRACKET
PIPE
ELBOW
WEATHERPROOF CONTROL BOX
CHECK
VALVE
GATE
VALVE
POWER SUPPLY CONDUIT
L
CORD SEAL CONNECTORS FOR
POWER AND CONTROL CORDS
(NOT SHOWN)
" INLET
PIPE
PUMP #2 ON
BOTTOM OF BASIN MUST HAVE SMOOTH
TROWELED SURFACE FOR MTG. SUPPORT CASTING
PIPE
TEE
HIGH WATER ALARM
BELOW
FROST
LEVEL
CL
CL
C PIPE
X
HATCH OPNG.
" DISCH. PIPING - CAN BE
GALV. STEEL OR DUCTILE IRON
2" SS PIPE GUIDE RAILS
MUST BE PLUMB
LIFT OUT ASSEMBLY - NON-SPARKING - UL LISTED
LC PIPE
PUMP #1 ON
PUMPS OFF
LIFTING CHAIN
CHECK
VALVE
6' DIA.
30" OPNG.
PUMP SERIES:
DUPLEX 4" SUBMERSIBLE CHOPPER
INTERMEDIATE RAIL SUPPORT
TYPICAL INSTALLATION
ES-2229B Landia
MODEL
SUBMERSIBLE CHOPPER PUMP
(ONE REQUIRED FOR EACH 20 FEET OF
BASIN DEPTH IN EXCESS OF 20 FEET.)
4" EMERGENCY PUMP CONNECTIONS
4" GATE VALVE & MALE ALUMINUM CAM LOCK
4 WAY CROSS
90 DEG.
REDUCING
ELBOW
LANDIA DG-I-65
4"EMERGENCY
PUMP CONNECTION
48" OPNG.
24"
13 13
15'
11'
X
DG-I-65
1/4" S.S.
HINGED ACCESS DOOR
ALUM. 300 PSF Rating Angle Frame
HINGED ACCESS DOOR
ALUM. 300 PSF Rating Angle Frame
3 Gauge taps for Pressure Gauge
NEMA 4X - Alum.
Alarm Horn
DUAL PEDESTAL SYSTEM
6' DIA.
PART 1 GENERAL
1.01 SCOPE
THE WORK COVERED BY THE SECTION CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT AND MATERIALS REQUIRED TO INSTALL, TEST AND PLACE INTO SATISFACTORY OPERATION THE SEWAGE PUMPING STATION INCLUDING PUMPS, MOTORS, CONTROLS AND APPURTENANCES AS SHOWN ON THE DRAWINGS AND DETAILED HEREIN.
1.02 DEFINITIONS
WHEN THE TERM "PUMPING UNIT" IS USED, IT SHALL BE DEEMED TO MEAN A PUMP OR PUMPS, COMPLETE WITH, BUT NOT LIMITED TO, DRIVE MOTOR, ACCESSORIES, APPURTENANCES AND ALL ASSOCIATED EQUIPMENT.
1.03 DESIGN REQUIREMENTS
PUMPS AND ACCESSORIES SHALL BE AS OUTLINED IN THESE SPECIFICATIONS.
1.04 SUBMITTALS
A. SUBMIT SHOP DRAWINGS AND ENGINEERING DATA IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 01340 OF
THESE SPECIFICATIONS.
B. OPERATION AND MAINTENANCE MANUALS SHALL BE FURNISHED IN ACCORDANCE WITH THE REQUIREMENTS OF
SECTION 01730 OF THESE SPECIFICATIONS.
1.05 STORAGE AND PROTECTION
A. PUMP ACCESSORIES SHALL BE STORED AND PROTECTED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. PUMP SHALL NOT BE STORED OUTSIDE OR EXPOSED TO THE WEATHER.
B. PUMP SHALL BE COMPLETELY DRAINED PRIOR TO SHIPMENT. SUCTION AND DISCHARGE PORTS SHALL BE PROVIDED WITH PLASTIC PLUGS. THE PUMP SHALL BE SECURED TO A WOODEN SKID AND CRATED TO FACILITATE HANDLING AND
STORAGE.
1.06 QUALITY ASSURANCE
A. THE MANUFACTURER SHALL PROVIDE A WRITTEN CERTIFICATION TO THE ENGINEER, WITH THE SHOP DRAWINGS, THAT ALL EQUIPMENT FURNISHED COMPLIES WITH ALL APPLICABLE REQUIREMENTS OF THESE SPECIFICATIONS.
B. ALL PUMPING UNITS SHALL BE AN APPROVED DESIGN, MAKE AND PRODUCTS OF MANUFACTURERS
WHO HAVE BUILT EQUIPMENT OF SIMILAR TYPE, SIZE, AND CAPACITY.
C. THE CONTRACTOR SHALL SUBMIT, UPON REQUEST, ANY ADDITIONAL INFORMATION THAT THE ENGINEER AND/OR OWNER MAY DEEM NECESSARY TO DETERMINE THE ABILITY OF THE PROPOSED MANUFACTURER TO PRODUCE THE
SPECIFIED EQUIPMENT.
D. PUMPING UNITS SHALL BE PRODUCTS OF MANUFACTURERS WHO CAN PRODUCE EVIDENCE OF THEIR ABILITY TO PROMPTLY FURNISH ANY AND ALL INTERCHANGEABLE REPLACEMENT PARTS AS MAY BE NEEDED AT ANY TIME WITHIN
THE EXPECTED LIFE OF THE PUMPS.
E. APPROVAL OF MANUFACTURERS OR SUPPLIERS WILL NOT BE GIVEN UNTIL ALL INFORMATION REQUIRED BY THE SPECIFICATIONS OR REQUESTED BY THE ENGINEER HAS BEEN SUBMITTED AND FOUND ACCEPTABLE.
F. THE CONTRACTOR SHALL PROVIDE AT NO COST TO THE OWNER, THE SERVICES OF AN ACCREDITED REPRESENTATIVE OF THE PUMP MANUFACTURER WHO SHALL SUPERVISE THE INSTALLATION AND TESTING OF EACH PUMPING UNIT AND ALSO GIVE OPERATING AND MAINTENANCE INSTRUCTION TO THE OWNER'S PERSONNEL. PUMPING EQUIPMENT SHALL BE TESTED FOR PERFORMANCE ACCORDING TO CURVES AND OTHER APPROVED DATA. FAILURE OF THE EQUIPMENT TO PERFORM AS CURVES INDICATE AND WITH OTHER APPROVED DATA SHALL BE SUFFICIENT CAUSE FOR REJECTION.
AS ONE CONDITION NECESSARY TO ACCEPTANCE OF ANY PUMPING UNIT, THE CONTRACTOR SHALL SUBMIT A CERTIFICATE FROM THE MANUFACTURER, STATING THAT THE INSTALLATION OF THE PUMPING UNIT IS SATISFACTORY, THAT THE UNIT IS READY FOR OPERATION, AND THAT THE OWNER'S OPERATING PERSONNEL HAVE BEEN SUITABLY
INSTRUCTED IN THE OPERATION AND MAINTENANCE OF THE UNIT.
1.07 PUMP STATION WARRANTY
THE CONTRACTOR GUARANTEES AND WARRANTS THAT DURING THE FIRST YEAR OF OPERATION, (DATE THE PUMP STATION IS TESTED, PLACED IN SERVICE AND A WRITTEN ACCEPTANCE LETTER ISSUED BY THE OWNER) THE PUMP STATIONS WILL OPERATE SATISFACTORILY AND CONTINUOUSLY ACCORDING TO THE PUMP REQUIREMENTS SPECIFIED HEREIN, AND THAT AFTER DUE NOTICE HAS BEEN GIVEN BY THE OWNER, HE OR THE PUMP MANUFACTURER WILL PROCEED, WITHIN A REASONABLE TIME TO ADJUST, REGULATE, REPAIR AND RENEW AT HIS EXPENSE SUCH PART OR PARTS, EQUIPMENT, AUXILIARIES APPURTENANCES OR PERFORM SUCH WORK AS IS
NECESSARY TO MAINTAIN THE GUARANTEED CAPACITIES, EFFICIENCIES AND PERFORMANCES.
PART 2 PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
ALL PUMPS SHALL BE MODEL DG-I 65 AS MANUFACTURED BY LANDIA OR APPROVED EQUAL.
2.02 GENERAL
A. FURNISH LANDIA DG SERIES SUBMERSIBLE CHOPPER PUMPS AS SPECIFIED HEREIN.
THE PUMP SHALL BE NON-OVERLOADING THROUGHOUT THE ENTIRE RANGE OF OPERATION WITHOUT EMPLOYING SERVICE FACTOR. THE PUMP SHALL RESERVE A MINIMUM SERVICE FACTOR OF 1.15. THE PERFORMANCE CURVE SUBMITTED FOR APPROVAL SHALL STATE IN ADDITION TO HEAD AND CAPACITY PERFORMANCE, THE PUMP
EFFICIENCY, SOLID HANDLING CAPACITY, AND REFLECT MOTOR SERVICE FACTOR.
DJJ ADAIR CO LIFT STATION DETAILS:
§NUMBER OF PUMPS: 2
§OPERATING CONDITION: 150 GPM @ 11' TDH
§ IMPELLER: 150MM TRIM
§DISCHARGE: SHALL BE 2.5" ANSI FLANGE.
§MOTOR: SHALL BE 17.9 HP 208V 60 HZ 3-PHASE, AIR FILLED DESIGN.
§POWER CORD: SHALL BE EPOXY POTTED AND EQUIPPED WITH A MINIMUM OF 35' OF POWER CORD.
CONSTRUCTION
CASTINGS - CORD CAP / MOTOR HOUSING / BEARING HOUSING / SEAL PLATE SHALL BE ASTM A48 CLASS 30 CAST IRON
SHAFT SHALL BE 416 STAINLESS STEEL
IMPELLER- ASTM A48 CAST IRON CLASS 30 OR ASTM A536 DUCTILE IRON CLASS 65
FASTENERS / HARDWARE SHALL BE 300 SERIES STAINLESS STEEL
ELASTOMERS - O-RINGS / MECHANICAL SEALS / CORD GRIP GROMMETS SHALL BE NITRILE
MECHANICAL SEALS SHALL BE CARBON / SILICON CARBIDE
POWER CABLE SHALL BE TYPE SOOW OR W WHILE CONTROL CABLE SHALL BE SOOW
LIFTING BAIL SHALL BE WELDED OR FORGED 300 SERIES STAINLESS
ELECTRICAL POWER CORD
THE POWER CORD WILL BE SOOW OR W, OIL AND WATER RESISTANT 600V, 90C, UL AND CSA APPROVED AND APPLIED PER NEC AMPACITIES RATINGS AT THE CABLES RATED TEMPERATURE FOR INTERMITTENT / CONTINUOUS DUTY. THE PUMP SHALL BE DOUBLE PROTECTED WITH A COMPRESSION FITTING AND AN EPOXY POTTED AREA THAT SEALS EACH CONDUCTOR AT THE POWER CORD ENTRY TO THE PUMP. THE POWER CABLE ENTRY INTO THE CORD CAP ASSEMBLY SHALL FIRST BE MADE WITH A COMPRESSION FITTING. EACH INDIVIDUAL LEAD SHALL BE STRIPPED DOWN TO BARE WIRE AT STAGGERED INTERVALS AND EACH STRAND INDIVIDUALLY SEPARATED. THIS AREA OF THE CORD CAP SHALL THEN BE FILLED WITH AN EPOXY COMPOUND POTTING. THIS ASSEMBLY WILL PREVENT WATER CONTAMINATION FROM GAINING ENTRY EVEN IN THE EVENT OF WICKING OR CAPILLARY ACTION. THE POWER CORD LEADS SHALL BE CONNECTED TO THE MOTOR LEADS WITH A TERMINAL BLOCK OR EXTRA HEAVY CONNECTORS. THE CORD CAP ASSEMBLY WHERE BOLTED TO THE MOTOR HOUSING SHALL BE SEALED WITH A NITRILE O-RING ON A BEVELED EDGE TO ASSURE PROPER SEALING. WIRING CONNECTION SHALL BE DONE THROUGH A TERMINAL BLOCK ELIMINATING WIRE
NUTS OR USE OF HEAVY-DUTY CRIMP CONNECTORS.
MOTOR
THE MOTORS SHALL MEET PREMIUM EFFICIENCY IN ACCORDANCE WITH IEC 60034-30, LEVEL IE3 AND NEMA MG1 [NEMA
12.60 ENCLOSED MOTOR]. MOTOR RATING TESTS SHALL BE CONDUCTED IN ACCORDANCE WITH CSA C390-10 REQUIREMENTS. A CERTIFICATE SHALL BE AVAILABLE UPON REQUEST. THE MOTORS ARE SUBMERGED IN NON-TOXIC, OIL FILLED, COOL RUNNING DESIGN PROVIDING SIGNIFICANTLY REDUCED OPERATING TEMPERATURES. PUMP DESIGNS REQUIRING A SECONDARY COOLING APPARATUS SHALL BE DEEMED UNAPPROVED AND NOT EQUAL. AIR
FILLED PUMP DESIGNS SHALL NOT BE CONSIDERED EQUAL OR APPROVED.
THE COPPER STATOR WINDINGS SHALL BE INSULATED WITH MOISTURE RESISTANT CLASS H INSULATION MATERIALS, RATED FOR 180° C (356° F). [PER NEMA MG1 1.66]
THE SERVICE FACTOR SHALL BE 1.3 IN WET PIT SERVICE AND 1.0 FOR VFD OPERATION (AS DEFINED BY MG1 STANDARD). THE MOTOR SHALL HAVE A VOLTAGE TOLERANCE OF +/- 10% FROM NOMINAL, AND A PHASE-TO-PHASE
VOLTAGE IMBALANCE TOLERANCE OF 1%.
THE ROTOR BARS AND SHORT CIRCUIT RINGS SHALL BE MADE OF CAST ALUMINUM.
THE MOTOR SHALL BE DESIGNED FOR CONTINUOUS DUTY. THE MAXIMUM CONTINUOUS TEMPERATURE OF THE PUMPED LIQUID SHALL BE 40 C (104 F), AND INTERMITTENTLY UP TO 50 C (122 F). EACH OF THE THREE PHASES WILL HAVE A UL/FM APPROVED THERMOSTAT OR THERMISTOR. THE WINDING OPERATING TEMPERATURE AT RATED
HORSEPOWER AND SERVICE FACTOR WILL BE A MAXIMUM OF 130 C @ 40 C AMBIENT.
THE MOTOR SHALL BE CAPABLE OF HANDLING UP TO 15 (>=20KW) AND 20 (<20KW) EVENLY SPACED STARTS PER HOUR
WITHOUT OVERHEATING. [PER NEMA MG1 12.54]
THE MOTOR SHALL MEET THE REQUIREMENTS OF NEMA MG1 PART 30 AND 31 FOR OPERATION ON PWM TYPE VARIABLE FREQUENCY DRIVES. THE ROTORS WILL HAVE HIGH EFFICIENCY LAMINATED STEEL WITH DIE CAST BARS AND SHORTING RINGS. THE STATORS WILL HAVE HIGH EFFICIENCY LAMINATED STEEL (IF REQUIRED TO MEET PREMIUM EFFICIENCY), WITH INVERTER DUTY RATED, CLASS H MAGNET WIRE & INSULATION MATERIALS. EACH OF THE THREE PHASES WILL HAVE A UL/FM APPROVED THERMOSTAT OR THERMISTOR SET FOR 130C +/-5. (150C +/-5 FOR
320/360 FRAME HPE PRODUCT)
BEARINGS
THE UPPER BEARING SHALL BE A HEAVY-DUTY RADIAL SINGLE ROW BALL BEARING WHILE THE LOWER BEARING SHALL BE A DOUBLE ROW HEAVY-DUTY ANGULAR CONTACT BALL BEARING OF THE THRUST LIMITING DESIGN. MINIMUM OF 50,000 HOURS OF B10 BEARING LIFE FOR RADIAL & THRUST BEARINGS WHILE OPERATING ACROSS ENTIRE HYDRAULIC OPERATING RANGE OF THE PUMP. ANY PUMPS HAVING RATED B10 LIFE ONLY AT THE BEP SHALL NOT BE CONSIDERED EQUAL OR APPROVED. BEARING SHALL BE LUBRICATED FOR LIFE FROM THE FACTORY AND WILL BE ACCOMPLISHED THROUGH THE NON-TOXIC, LOW VISCOUS, DIELECTRIC OIL IN THE FRAME. PUMP DESIGNS REQUIRING PERIODIC SCHEDULED BEARING SERVICE SHALL NOT BE CONSIDERED EQUAL OR APPROVED. SINGLE ROW OR SLEEVE LOWER
BEARINGS SHALL NOT BE ACCEPTABLE.
SHAFT
THE PUMP SHAFT SHALL BE AN INTEGRAL, ONE-PIECE UNIT ADEQUATELY DESIGNED TO MEET THE MAXIMUM TORQUE REQUIRED AT ANY NORMAL START UP CONDITION OR OPERATING POINT IN THE SYSTEM. SHAFTS OF CARBON STEEL, CHROME PLATED, OR SPIN WELDED SHAFTS SHALL NOT BE CONSIDERED ADEQUATE OR EQUAL. MATERIAL OF SHAFT
SHALL BE 416 STAINLESS STEEL CONFORMING TO ASTM 8582.
FLUID END
THE IMPELLER SHALL BE ASTM CLASS 30 CAST IRON OR ASTM CLASS 65 DUCTILE IRON WITH OPTIONAL SST AVAILABLE. THE IMPELLER MOUNTING IS TO BE A SLIP FIT ONTO A TAPERED SHAFT AND A DRIVE KEY. THE IMPELLER SHALL BE ATTACHED TO THE SHAFT BY A SST FASTENER AND IMPELLER WASHER. THE IMPELLER IS TO BE BALANCED TO ISO1940-1 GRADE G6.3 STANDARD. IMPELLER DESIGNS THAT RELY ON FINS OR PINS PROTRUDING INTO THE SUCTION PATH TO ASSIST IN THE HANDLING OF FIBROUS MATERIAL SHALL NOT BE CONSIDERED EQUAL. IMPELLERS SHALL BE OF THE RADIAL SINGLE OR TWO VANE TYPE OR A VORTEX IMPELLER HAVING THE ABILITY TO PASS A WIDE RANGE OF SOLIDS. ANY IMPELLER DESIGN REQUIRING MECHANICAL BYPASS MECHANISM LOCATED IN THE VOLUTE IN
ORDER TO HANDLE SOLIDS SHALL NOT BE CONSIDERED EQUAL OR ACCEPTABLE.
THE VOLUTE SHALL BE ASTM CLASS 30 ALSO WITH OPTIONAL SST. IT WILL CONSIST OF A CENTERLINE DISCHARGE ONE PIECE DESIGN. THE PASSAGES ARE TO BE LARGE ENOUGH TO PASS THE SAME SOLID SIZE AS THE IMPELLER. THE DISCHARGE AND INLET FLANGES SHALL BE ANSI CLASS 125 AND BE INTEGRATED INTO THE VOLUTE CASE. THE WEAR RINGS SHALL BE REPLACEABLE RADIAL WEAR RINGS CONSTRUCTED OF 85-5-5-5 BRONZE THAT COME STANDARD IN
THE VOLUTE CASE WITH OPTIONAL SST AVAILABLE IN 304, 316 OR 410.
CHOPPER FLUID END
CHOPPING/MACERATION OF SOLIDS SHALL BE ACCOMPLISHED BY THE ACTION OF TWO ROTATING BLADES MOVING ACROSS ONE FIXED BLADE ALTERNATIVELY THREE FIXED BLADES MOUNTED BY THE PUMP INLET EXTERNAL OF THE PUMP CASING. THE CHOPPING SYSTEM SHALL BE DESIGNED TO PREVENT THE PUMP INLET FROM CLOGGING.
ROTATING AND FIXED BLADES SHALL BE EASILY REPLACEABLE WITHOUT THE USE OF SPECIAL TOOLS OR
REQUIREMENT OF PUMP DISASSEMBLY. FIXED AND ROTATING BLADES SHALL BE OF STEEL AISI A570 GR.36 AND HEAT
TREATED TO 60 ROCKWELL C HARDNESS.
IMPELLER SHALL BE OPEN TYPE CAST IRON AISI A48-40B AND DYNAMICALLY BALANCED. THE IMPELLER SHALL BE RIGIDLY HELD IN PLACE WITH AN IMPELLER BOLT AND HAVE NO AXIAL ADJUSTMENTS AND NO SET SCREWS. PUMP DESIGNS THAT REQUIRE AXIAL ADJUSTMENT OF THE IMPELLER WILL NOT BE ACCEPTED. THE IMPELLER SHALL NOT BE REQUIRED TO ASSIST IN ANY CHOPPING/MACERATING FUNCTION. PUMP DESIGNS THAT REQUIRE THE IMPELLER TO
CHOP SOLIDS WILL NOT BE ACCEPTED.
SEALS
EACH PUMP MUST BE EQUIPPED WITH A SWITCHABLE SEAL DESIGN ALLOWING FOR THE USE OF EITHER TANDEM MECHANICAL SEALS OR A CARTRIDGE DUAL SEAL DESIGN (ON 210 FRAME HPE PRODUCT) WITHOUT VOIDING THE AGENCY RATING OF THE PUMP. PUMPS UTILIZING ONE SEAL TECHNOLOGY SHALL NOT BE CONSIDERED EQUAL OR APPROVED. IN THE STANDARD TANDEM MECHANICAL SEAL CONFIGURATION THE LOWER SEAL SHALL BE OF THE TYPE 2 DESIGN AND CONSTRUCTED OF CARBON/ SILICON CARBIDE AND BE REPLACEABLE WITHOUT DISASSEMBLY OF THE SEAL CHAMBER AND WITHOUT THE USE OF SPECIAL TOOLS. THE UPPER SEAL SHALL OF THE TYPE 2100 DESIGN AND CONSTRUCTED OF CARBON/SILICON CARBIDE. EACH SEAL WILL NOT REQUIRE ROUTINE MAINTENANCE OR ADJUSTMENT. FOR EASE OF MAINTENANCE BOTH THE LOWER AND UPPER SEALS SHALL BE LOCALLY AVAILABLE AND OF A STANDARD DESIGN. FOR EASE OF SERVICE THE PUMPS SHALL BE AVAILABLE WITH A DROP IN CARTRIDGE SEAL CONSTRUCTED OF SILICON CARBIDE/CARBON. THE CARTRIDGE SEAL DESIGN SHALL FIT INTO THE SEAL CHAMBER WITH A SWITCHABLE SEAL PLATE ALLOWING FOR RETROFIT IN THE FIELD. UNITS EQUIPPED WITH OPPOSING MECHANICAL SEALS SHALL NOT BE ACCEPTABLE. ALL LOWER SEALS SHALL BE OPTIONALLY AVAILABLE IN TUNGSTEN
CARBIDE CONSTRUCTION.
EQUIPMENT MONITORING
THE INTEGRITY OF THE MECHANICAL SEAL SYSTEM SHALL BE CONTINUOUSLY MONITORED DURING PUMP OPERATION AND STAND BY TIME. TWO ELECTRICAL PROBES SHALL BE PROVIDED IN A SENSING CHAMBER POSITIONED BETWEEN THE PRIMARY AND SECONDARY MECHANICAL SEAL FOR DETECTING THE PRESENCE OF WATER CONTAMINATION WITHIN THE CHAMBER. THE SENSING CHAMBER SHALL BE FITTED WITH ENVIRONMENTALLY SAFE NONTOXIC OIL. A SOLID STATE RELAY MOUNTED IN THE PUMP CONTROL PANEL OR IN A SEPARATE ENCLOSURE SHALL SEND A LOW VOLTAGE, LOW AMPERAGE SIGNAL TO THE PROBE, CONTINUOUSLY MONITORING THE CONDUCTIVITY OF THE LIQUID IN THE SENSING CHAMBER. IF SUFFICIENT WATER ENTERS THE SENSING CHAMBER THROUGH THE PRIMARY MECHANICAL SEAL, THE PROBE SHALL SENSE THE INCREASE IN CONDUCTIVITY AND SIGNAL THE SOLID STATE RELAY IN THE CONTROL PANEL. THE RELAY SHALL THEN ENERGIZE A WARNING LIGHT ON THE CONTROL PANEL, OR OPTIONALLY, CAUSE THE PUMP TO SHUT DOWN. THIS SYSTEM SHALL PROVIDE AN EARLY WARNING OF MECHANICAL SEAL LEAKAGE, THEREBY PREVENTING DAMAGE TO THE SUBMERSIBLE PUMP AND ALLOWING SCHEDULED RATHER THAN EMERGENCY MAINTENANCE. SYSTEMS UTILIZING FLOAT SWITCHES OR ANY OTHER MONITORING DEVICES LOCATED IN THE STATOR HOUSING RATHER THAN IN A SENSING CHAMBER BETWEEN THE MECHANICAL SEALS ARE
NOT CONSIDERED TO BE EARLY WARNING SYSTEM, AND SHALL NOT BE CONSIDERED EQUAL.
SERVICEABILITY
THE COMPLETE ROTATING ASSEMBLY SHALL BE CAPABLE OF BEING REMOVED FROM THE VOLUTE WITHOUT DISTURBING THE SUCTION PIPING, DISCHARGE PIPING, AND VOLUTE. THE MOTOR HOUSING, SEAL HOUSING WITH SEAL PLATE AND IMPELLER STILL ATTACHED TO THE SHAFT SHALL BE CAPABLE OF BEING LIFTED OUT OF THE VOLUTE CASE FROM THE TOP AS ONE ASSEMBLY. FOR EASE OF REPAIR, THE MOTOR STATOR SHALL BE SECURELY HELD IN PLACE BY AN END RING SO IT CAN BE EASILY REMOVED WITHOUT THE USE OF HEAT OR A PRESS. NO SPECIAL TOOLS SHALL BE REQUIRED FOR PUMP AND MOTOR DISASSEMBLY. STATORS HELD IN PLACE BY HEAT SHRINK FIT SHALL NOT BE
ACCEPTABLE.
TESTING
ALL PUMPS SHALL BE BUILT IN A DEDICATED DOMESTIC FACTORY WITH FIFTY YEARS OF CONTINUOUS OPERATION.
ALL PUMPS SHALL BE VISUALLY INSPECTED TO CONFIRM THAT IT IS BUILT IN ACCORDANCE WITH THE SPECIFICATION AS TO HP, VOLTAGE, PHASE AND HERTZ. THE MOTOR SEAL AND HOUSING CHAMBERS SHALL BE MEGGERED FOR INFINITY TO TEST FOR MOISTURE CONTENT OR INSULATION DEFECTS. THE MOTOR HOUSING WILL BE FILLED WITH DIELECTRIC OIL AND SHALL BE ALLOWED TO RUN DRY TO CHECK FOR PROPER ROTATION. DISCHARGE PIPING SHALL BE ATTACHED, THE PUMP SUBMERGED IN WATER, AND AMP READINGS SHALL BE TAKEN ON EACH PHASE TO VERIFY BALANCED STATOR WINDINGS. THE PUMP SHALL BE REMOVED FROM THE WATER, MEGGERED AGAIN, AND DRIED.
VOLUTES CAN RECEIVE HYDROSTATIC TESTING TO ENSURE HIGH QUALITY CASTINGS ARE BEING PROVIDED. ALL PUMPS SHALL RECEIVE STANDARD HYDRAULIC INSTITUTE (HI) NON-WITNESSED TESTING AT A THIRD-PARTY AGENCY-CERTIFIED TEST LAB. PUMP MOTORS CAN BE TESTED ON A FACTORY DYNAMOMETER CAPABLE OF SIMULTANEOUSLY MEASURING TORQUE AND ROTATIONAL SPEED. TESTING CONDUCTED OFF SITE SHALL NOT BE
CONSIDERED EQUAL OR APPROVED.
PAINT
THE PUMP SHALL BE PAINTED WITH WATERBORNE HYBRID ACRYLIC/ALKYD PAINT. THIS CUSTOM ENGINEERED, QUICK DRY, LOW VOC PAINT SHALL PROVIDE SUPERIOR LEVELS OF CORROSION AND CHEMICAL PROTECTION. OPTIONAL COATINGS ARE AVAILABLE THROUGH THE FACTORY OF CHLORINATED RUBBER, COAL TAR EPOXY AND POLYAMIDE
EPOXY.
2.03 CONTROL PANEL
THE INCOMING POWER SHALL BE 208-VOLT, THREE-PHASE.
A NEMA 4X STAINLESS STEEL CONTROL PANEL SHALL BE FURNISHED AND INSTALLED APPROPRIATE FOR THE ELECTRICAL CHARACTERISTICS OF THE PUMP STATION. ENCLOSURE SHALL BE PROVIDED WITH A THREE-POINT LATCH. ENCLOSURE SHALL BE OF A STRONG AND RIGID CONSTRUCTION. CONTROL PANEL SHALL HAVE A FULL INNER DOOR FOR MOUNTING LIGHTS AND SWITCHES, AND TO PROTECT PERSONNEL FROM LIVE ELECTRICAL CIRCUITS. THE ENCLOSURE SHALL BE SIZED TO INCLUDE THE REQUIRED VARIABLE FREQUENCY DRIVES WHICH ARE BEING USED FOR PHASE CONVERSION. IN ADDITION, A PROPERLY SIZED AIR CONDITIONER SHALL BE PROVIDED TO MAINTAIN AN
ACCEPTABLE TEMPERATURE WITHIN THE ENCLOSURE.
THE CONTROL CIRCUIT SHALL BE 120 VOLT WITH DISCONNECT CIRCUIT BREAKER AND OVERLOAD PROTECTION. THE CONTROL SYSTEMS SHALL ALSO HAVE NECESSARY LOGIC TO PREVENT THE START OF MORE THAN ONE (1) PUMP AT THE SAME TIME. THE CONTROL SYSTEM SHALL HAVE NECESSARY LOGIC SUCH THAT THE PUMP STATION PERFORMS IN THE FOLLOWING MANNER. PUMP #1 AND PUMP #2 WILL ACT AS THE LEAD AND LAG PUMPS AND ALTERNATE UNDER
NORMAL CONDITIONS.
IN ADDITION, THE PANEL SHALL INCLUDE THE FOLLOWING FEATURES:
1. MAIN POWER CIRCUIT BREAKER
2. CIRCUIT BREAKER FOR EACH PUMP
3. DANFOSS FC-202 CONSTANT TORQUE VARIABLE FREQUENCY DRIVES SIZED FOR THE SPECIFIED PUMPS AT 208V, 3-PHASE.
4. ALTERNATING RELAY WITH LEAD PUMP SELECTOR SWITCH
5. HIGH WET WELL LEVEL OVERRIDE RELAY TO ACTIVE BOTH PUMPS SHOULD THE LIQUID LEVEL CONTINUE TO RISE
WHILE ONE PUMP IS IN OPERATION.
6. EACH PUMP SHALL INCLUDE AN HOA SWITCH, RED SEAL FAIL PILOT LIGHT, GREEN RUN PILOT LIGHT AND AN
ELAPSED TIME METER. THESE COMPONENTS SHALL BE INNER DOOR MOUNTED.
7. TO REDUCE CONDENSATION BUILD UP, THE PANEL SHALL INCLUDE A THERMOSTATICALLY CONTROLLED STRIP
HEATER.
8. INNER DOOR MOUNTED GFI RECEPTACLE WITH CIRCUIT BREAKER.
9. GENERAL ALARM LIGHT MOUNTED ON TOP OF THE ENCLOSURE WITH AN AUDIBLE ALARM (WITH SILENCE SWITCH)
TO INDICATE HIGH LEVEL ALARM OR SEAL FAIL.
THE PANEL SHALL BE MOUNTED WITH AN 18” LEG KIT AND INCLUDE APPROPRIATELY SIZED CORD GRIPS FOR SEALING
GASES OUT OF THE PANEL ENCLOSURE.
OPERATION SEQUENCE:
ON SUMP LEVEL RISE LOWER FLOAT SWITCH SHALL BE ENERGIZED. WHEN LEVEL RISES TO NEXT FLOAT, FLOAT SHALL BE ENERGIZED, AND LEAD PUMP SHALL START. WITH LEAD PUMP OPERATING, SUMP LEVEL SHALL LOWER TO LOW LEVEL FLOAT TURN-OFF SETTING AND PUMP WILL STOP. ALTERNATING RELAY WILL INDEX IN STOPPING OF PUMP SO THAT LAG PUMP WILL BECOME LEAD PUMP ON NEXT OPERATION. IF SUMP LEVEL CONTINUES TO RISE WHEN LEAD PUMP IS OPERATING, OVERRIDE FLOAT SWITCH SHALL OPERATE TOGETHER UNTIL LOW-LEVEL FLOAT SWITCH TURNS OFF BOTH PUMPS. IF LEVEL CONTINUES TO RISE WHEN BOTH PUMPS ARE OPERATING, ALARM FLOATS SWITCH WILL
ENERGIZE AND SIGNAL ALARM.
LEVEL CONTROLS:
SEALED MERCURY FLOAT SWITCHES SHALL BE PROVIDED AND INSTALLED. FOUR FLOATS SHALL BE REQUIRED FOR DUPLEX STATIONS. FLOATS SHALL BE ATTACHED TO SPECIAL MOUNTING BRACKET NEAR THE TOP OF THE BASIN SO
THAT LEVELS CAN BE CHANGED WITHOUT ENTERING THE SUMP BASINS.
2.17 ACCESS HATCHES WITH SAFETY GRATE
THERE SHALL BE FURNISHED AND INSTALLED AT EACH PUMP STATION, ONE (1) ALUMINUM ACCESS HATCHES AT THE PUMP STATION, AND ONE (1) FOR THE VALVE VAULT. HATCH SHALL BE SIZED TO ALLOW REMOVAL OF ALL PUMPING EQUIPMENT. HATCH SIZE SHALL BE DETERMINED BY THE PUMP SUPPLIER TO ALLOW FOR PROPER PUMP REMOVAL CLEARANCES. THE HATCH SHALL BE OF NON_SKID DESIGN AND DESIGNED TO HANDLE H-20 LOADING (OCCASIONAL
TRAFFIC LOAD).
A POSITIVE HOLD OPEN BAR SHALL BE PROVIDED TO SECURE THE HATCH IN THE OPEN POSITION. STAINLESS STEEL BOLTS FOR MOUNTING EACH RAIL SUPPORT PLATE SHALL BE FURNISHED SO THAT EACH SET OF GUIDE RAILS CAN
MOUNT DIRECTLY TO THE ACCESS HATCH.
ALL HINGES AND HINGE BOLTS SHALL BE STAINLESS STEEL. ALL HINGE BOLT NUTS SHALL BE TACK WELDED TO PREVENT REMOVAL OF BOLTS. ALL FASTENERS USED ON THE HATCHES SHALL BE NON-CORROSIVE. ALL AREAS OF HATCH FRAME THAT WILL BE IN CONTACT WITH CONCRETE SHALL BE COATED WITH BITUMASTIC PAINT.
EACH WET WELL HATCH SHALL BE PROVIDED WITH A FALL THROUGH PROTECTION SAFETY GRATE. GRATES SHALL BE ADEQUATELY SIZED TO ALLOW A CLEAR OPENING LARGE ENOUGH FOR PUMP TO CLEANLY PASS THROUGH.
PART 3 EXECUTION
BOOSTER PUMP 3.01 INSTALLATION
INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS IN THE LOCATIONS SHOWN ON THE DRAWINGS. INSTALLATION SHALL INCLUDE FURNISHING ANY REQUIRED OIL AND GREASE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. ANCHOR BOLTS SHALL BE STAINLESS STEEL AND SHALL BE SET BY THE CONTRACTOR, IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AND APPROVED SHOP DRAWINGS.
3.02 TESTING
EACH PUMP AND MOTOR SHALL BE TESTED (WIRE TO WATER) AT THE FACTORY TO INSURE CONFORMANCE WITH APPROVED CHARACTERISTIC CURVE AND EFFICIENCIES. A CERTIFIED TEST CURVE FOR EACH PUMP SHALL BE SUBMITTED TO THE ENGINEER SHOWING AT LEAST FIVE (5) TEST POINTS. ONE OF THESE POINTS SHALL BE AT SHUT-OFF AND ANOTHER AT THE SPECIFIED OPERATING CONDITION. AT LEAST ONE OF THE POINTS SHALL BE TO THE RIGHT OF THE OPERATING CONDITION. ACCEPTANCE OF THESE CURVES SHALL BE MADE BY THE ENGINEER BEFORE
SHIPMENT.
3.03 MANUFACTURER SERVICE
A. FURNISH THE SERVICES OF A FACTORY REPRESENTATIVE FOR ONE, EIGHT-HOUR DAY DURING THE INSTALLATION
PHASE OF THE EQUIPMENT. THE FACTORY REPRESENTATIVE SHALL HAVE FULL
KNOWLEDGE AND EXPERIENCE IN THE INSTALLATION OF THE TYPE OF EQUIPMENT BEING INSTALLED.
B. THE DISTRIBUTOR FOR THE PUMP AND CONTROL PANEL MUST SHOW EVIDENCE OF A SERVICE DEPARTMENT. THE SERVICE DEPARTMENT MUST BE REGULARLY ENGAGED IN SERVICE WORK FOR AT LEAST ONE FULL YEAR PRIOR TO
THE BID DATE.
C. AFTER THE STATION IS INSTALLED, BUT PRIOR TO PUTTING IT INTO SERVICE, THE MANUFACTURER OR THE MANUFACTURER'S AUTHORIZED DISTRIBUTOR MUST PROVIDE START-UP SERVICES TO INCLUDE: VOLTAGE CHECK;
AMP CHECK; INSTALLATION CHECK; ROTATION CHECK; AND DRAW DOWN TEST TO ESTABLISH PUMP CAPACITY. A
WRITTEN REPORT TO THE ENGINEER MUST BE SUBMITTED AFTER START-UP.
END OF SECTION
30' 60' 90' 120'0'
NEW DUPLEX
VALVE PIT
NEW 3" PUMP
DISCHARGE
CONNECT NEW 3"
PUMP DISCHARGE
TO EXISTING
NEW 3" PUMP
DISCHARGE
VRH
TRG
ACCOUNT NO.
523-CAWT-AC12-00
TRG PSCArchitects - Engineers - Landscape Architects The Roberts Group
239 Southland Drive - Lexington, KY 40503 859-276-2006 - 859-276-2901 Facsimile
DJJ - ADAIR YDC SEWAGE GRINDER PIT RELOCATION
DEPARTMENT FOR JUVENILE JUSTICE
COLUMBIA, KY
DRAWING NO.
DECA REVIEWED
PHASE
FOR INTENT ONLY
DRAWING INFORMATION
DRAWING DATE
DRAWN BY
CHECKED BY
A&E FILE NO.
DECA LOG #
"D"
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
02/16/2024
ST
ATE OF KENTUCKY
P R
O
FESS I ONA L ENG
I N E
E R
L
I C E N S E
D
DATEDESCRIPTION OF REVISIONS
REVISION HISTORY OF THIS DRAWING
DATEDESCRIPTION OF REVISIONS
XXX
P:
\K
YS
ta te \2
-C O
LU
M
BI
A-
KY
-D
JJ
P
LB
G
P R
O
JE
C T\
-P
LU
M
\2
P4 .0
PA
R
TI
AL
S
IT
E
U
TI
LI
TY
P
LA
N
AL
TE
R N
AT
E.
dw g
W ed ne sd ay
, F eb ru ar y
, 2
8:
A
M Th e R ob er ts G ro up
G re g
El am
TRG #23035
P4.0
EXPIRATION: 06/30/2025
RTA 02/16/2024
PARTIAL SITE UTILITY PLAN - PUMP DISCHARGE ROUTING
GENERAL NOTES:
A. EXISTING UTILITY LOCATIONS INDICATED ON THESE DRAWINGS ARE
BASED ON AS-BUILT DRAWINGS PROVIDED AFTER COMPLETION OF THE
ORIGINAL PROJECT. IN ADDITION TO CONTACTING ALL SUPPORTING
UTILITY COMPANIES AND SERVICES TO PROVIDE A MORE PRECISE UP TO
DATE LOCATION OF EACH SERVICE. LOCATIONS INDICATED ARE SHOWN
TO THE BEST OUR ABILITY. HOWEVER, THE CONTRACTOR SHALL STILL
CONFIRM EXACT UTILITY LOCATIONS AND TAKE EVERY PRECAUTION TO
AVOID DAMAGE TO EXISTING UTILITIES DURING CONSTRUCTION.
SHEET KEYED NOTES:
1. PROVIDE THRUST BLOCKS AT EVERY ELBOW AND TEE. SEE THRUST BLOCK DETAIL THIS
SHEET. TYPICAL.
2. NEW DUPLEX GRINDER PUMP STATION. SEE SHEET P3.0 FOR ADDITIONAL INFORMATION.
3. NEW PIPING TO BE INSTALLED UNDER EXISTING PAVEMENT. NEW PAVEMENT REPAIR
SHALL MATCH EXISTING PAVEMENT CONSTRUCTION. CONTRACTOR TO FIELD VERIFY
EXACT SQUARE FOOTAGE OF PAVEMENT REPLACEMENT.
1 PARTIAL SITE UTILITY PLAN - PUMP DISCHARGE ROUTING
5 FORCE MAIN BEDDING & BACKFILL
NO SCALE
2 HORIZONTAL THRUST BLOCKS
NO SCALE
3 FORCE MAIN BEDDING & BACKFILL
UNDER PAVEMENT CUT
SCALE
4 SANITARY SEWER AIR RELEASE
VALVE
SCALE
| Addendum One |
| 23035 - DJJ COLUMBIA COMBINED DWGS (1) |
| 23035 - P1.0 - PARTIAL PLUMBING PLAN - EXISTING-P1.0 |
| 23035 - P1.1 - PARTIAL PLUMBING PLAN - DEMOLITION-P1.1 |
| 23035 - P2.0 - PARTIAL PLUMBING PLAN - NEW WORK-P2.0 |
| 23035 - P3.0 - PLUMBING GENERAL NOTES AND DETAILS-P3.0 |
| 23035 - P4.0 - PARTIAL SITE UTILITY PLAN - ALTERNATE-P4.0 |
File details come from the government source that posted it. Updated .