Addendum No. 3 ITB 26-13-214320 Seward Freight Dock Expansion Fender System.pdf.crdownload
CRDOWNLOAD file 824 KB Posted
- Solicitation number
- ITB 26-13-214320 Seward Freight Dock Expansion Fender System
- Issued by
- Kenai Peninsula Borough, Alaska
About this file
This Addendum No. 3 document, issued by the Alaska Railroad Corporation (ARRC) on April 3, 2026, provides clarification regarding federal procurement requirements for ITB 26-13-214320, the Seward Freight Dock Expansion Fender System project. The addendum addresses bidder questions concerning Buy America and Buy American compliance requirements applicable to the fabrication and delivery of marine fender systems for the Port of Seward. The document specifies that sealed bids remain due by 3:00 p.m. local time on April 21, 2026 (as extended by Addendum 2), with public bid opening occurring at that time at ARRC's Anchorage office. The contract term extends from ten calendar days after award through project completion, with performance expected to commence within ten days of the Notice to Proceed and fender system delivery required before October 15, 2026. Bidders must acknowledge receipt of this and all addenda in their Supply Bid Form (Form 395-0129).
Addendum No. 3 establishes that the project is subject to Build America, Buy America Act (BABA) requirements under 2 CFR 200.322 and related federal regulations, applicable to all federal-aid infrastructure contracts exceeding $250,000. Contractors and subcontractors must certify that all iron, steel, manufactured products, and construction materials used in the project are produced in the United States, with manufactured products containing greater than 55% domestic content of component costs unless another standard applies. The addendum introduces a four-page Buy America Certification Form (ARRC-BABA-001, dated 04/2026) as a required bid document, with incomplete or unsubmitted forms resulting in bid rejection. Additional required federal certifications include FTA Buy America Certificate, FRA Buy America Certificate, and Certification Regarding Use of Contract Funds for Lobbying. The project is funded in part by MARAD Grant funding, making compliance with these domestic preference requirements mandatory for bid consideration. Prime contractors are responsible for ensuring all subcontractors, manufacturers, and suppliers comply with BABA requirements and maintain documentation verifying compliance available upon demand.
Text of this file
ALASKA RAILROAD CORPORATION
327 W. Ship Creek Ave.
Anchorage, AK 99501 wallaces@akrr.com
Phone (907)265-2425 Cell (907)744-0031
ADDENDUM NO. 3
Invitation to Bid (ITB) 26-13-214320 Seward Freight Dock Expansion – Fender System Alaska Railroad Corporation Date: April 3, 2026
This Addendum is issued to provide clarification and additional information in response to bidder questions. All other terms and conditions of the referenced solicitation remain unchanged.
QUESTION AND ANSWERS:
1. Which Buy America / Buy American requirements apply to this project?
Based on MARAD Grant funding it has been determined the applicable Buy America/Buy
American requirements for this project are as follows:
Required for Bid
4. Federal Certifications: Section G (Revised):
• # 22. FTA Buy America Certificate
• # 23. FRA Buy America Certificate
• # 25. Certification Regarding Use of Contract Funds for Lobbying
• # 34. Build America, Buy America Act –2 CFR 200.322; Section 70914 of Pub. L. No.
117‑58, Div. G, Title IX, Subtitle A, 135 Stat. 429, 1298 (2021); 2 CFR Part 184 (Applies to all Federal‑aid infrastructure contracts in excess of $250,000.)
The four page Build America, Buy America Act #34 forms have been added to the list of required bid documents and are attached to this Addendum. Bids will not be considered if the required documents are not fully completed and submitted at the time of bid.
Please acknowledge receipt of this and all addenda in your firms Supply Bid Form (Form 395-0129).
Sincerely, Contract Administration Specialist Alaska Railroad Corporation mailto:wallaces@akrr.com
Required Contract Provisions for Federal-Aid Contracts [Revised April 2, 2026]
34. BUIILD AMERICA, BUY AMERICA ACT – 2 CFR 200.322; Section 70914 of Pub. L. No. 117- 58, div. G, tit. IX, subtit. A, 135 Stat. 429, 1298 (2021); 2 CFR Part 184 [Applies to all Federal-aid infrastructure contracts in excess of $250,000]
Contractors and their subcontractors who apply or bid for an award for an infrastructure project subject to the domestic preference requirement in the Build America, Buy America Act (BABA) shall file the required certification to ARRC with each bid or offer for an infrastructure project, unless a domestic preference requirement is waived by U.S. DOT. Contractors and subcontractors certify that no federal financial assistance funding for infrastructure projects will be provided unless all the iron, steel, manufactured projects, and construction materials used in the project are produced in the United States. BABA, Pub. L. No. 117-58, §§ 70901-52. Contractors and subcontractors shall also disclose any use of federal financial assistance for infrastructure projects that do not ensure compliance with BABA domestic preference requirements. Such disclosures shall be forwarded to ARRC which in turn will forward the disclosures to the federal awarding agency.
For contracts subject to BABA, contractors and subcontractors must sign and submit the following certification to the next tier (e.g., subcontractors submit to the contractor; contractors submit to the non-federal entity):
The undersigned certifies, to the best of its knowledge and belief, that:
The Build America, Buy America Act (BABA) requires that no federal financial assistance for “infrastructure” projects is provided “unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.” Section 70914 of Public Law No. 117-58, §§ 70901-52.
The undersigned certifies that the iron, steel, manufactured products, and construction materials used in this contract are in full compliance with the BABA requirements including:
1. All iron and steel used in the project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
2. All manufactured products purchased with federal financial assistance must be produced in the United States. For a manufactured product to be considered produced in the United States, the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55% of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation.
3. All construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States.
The undersigned certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the undersigned understands and agrees that the provisions of 31 U.S.C.
Chap. 38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.
BUY AMERICA CERTIFICATION FORM
Build America, Buy America Act (BABA)
ARRC-BABA-001 (04/2026)
GENERAL INFORMATION
1. GRANTEE: 2. SOLICITATION NUMBER:
3. CONTRACTOR: 4. PROJECT NAME:
MATERIALS
1A. MATERIAL TYPE: 1C. LOCATION OF PRODUCT: 1D. DESCRIPTION:
1B. NAME OF MANUFACTURER:
2A. MATERIAL TYPE: 2C. LOCATION OF PRODUCT: 2D. DESCRIPTION:
2B. NAME OF MANUFACTURER:
3A. MATERIAL TYPE: 3C. LOCATION OF PRODUCT: 3D. DESCRIPTION:
3B. NAME OF MANUFACTURER:
4A. MATERIAL TYPE: 4C. LOCATION OF PRODUCT: 4D. DESCRIPTION:
4B. NAME OF MANUFACTURER:
5A. MATERIAL TYPE: 5C. LOCATION OF PRODUCT: 5D. DESCRIPTION:
5B. NAME OF MANUFACTURER:
6A. MATERIAL TYPE: 6C. LOCATION OF PRODUCT: 6D. DESCRIPTION:
6B. NAME OF MANUFACTURER:
7A. MATERIAL TYPE: 7C. LOCATION OF PRODUCT: 7D. DESCRIPTION:
7B. NAME OF MANUFACTURER:
8A. MATERIAL TYPE: 8C. LOCATION OF PRODUCT: 8D. DESCRIPTION:
8B. NAME OF MANUFACTURER:
9A. MATERIAL TYPE: 9C. LOCATION OF PRODUCT: 9D. DESCRIPTION:
9B. NAME OF MANUFACTURER:
10A. MATERIAL TYPE: 10C. LOCATION OF PRODUCT: 10D. DESCRIPTION:
10B. NAME OF MANUFACTURER:
11A. MATERIAL TYPE: 11C. LOCATION OF PRODUCT: 11D. DESCRIPTION:
11B. NAME OF MANUFACTURER:
ITB 26-13-214320Alaska Railroad Corporation
Seward Freight Dock Expansion Fender System
US DOT Grant Agreement Number: 693JF72140001
ARRC-BABA-001 (04/2026)
BUY AMERICA CERTIFICATION FORM PAGE 2
CERTIFICATION
I hereby certify the materials to be installed pursuant to the attached Bid Submittal conform to the Build America, Buy America Act (BABA) requirements under – 2 CFR 200.322; Section 70914 of Pub. L. No. 117-58, div. G, tit. IX, subtit. A, 135 Stat. 429, 1298 (2021); 2 CFR Part 184 [Applies to all Federal-aid infrastructure contracts in excess of $250,000]
By signing, I certify the statements above are true to the best of my ability and knowledge and that the listed materials for use in this project funded by federal dollars were produced in the United States of America.
CONTRACTOR NAME: CONTRACTOR SIGNATURE: DATE:
COMPANY NAME:
MATERIALS
12A. MATERIAL TYPE: 12C. LOCATION OF PRODUCT: 12D. DESCRIPTION:
12B. NAME OF MANUFACTURER:
13A. MATERIAL TYPE: 13C. LOCATION OF PRODUCT: 13D. DESCRIPTION:
13B. NAME OF MANUFACTURER:
14A. MATERIAL TYPE: 14C. LOCATION OF PRODUCT: 14D. DESCRIPTION:
14B. NAME OF MANUFACTURER:
15A. MATERIAL TYPE: 15C. LOCATION OF PRODUCT: 15D. DESCRIPTION:
15B. NAME OF MANUFACTURER:
16A. MATERIAL TYPE: 16C. LOCATION OF PRODUCT: 16D. DESCRIPTION:
16B. NAME OF MANUFACTURER:
17A. MATERIAL TYPE: 17C. LOCATION OF PRODUCT: 17D. DESCRIPTION:
17B. NAME OF MANUFACTURER:
18A. MATERIAL TYPE: 18C. LOCATION OF PRODUCT: 18D. DESCRIPTION:
18B. NAME OF MANUFACTURER:
19A. MATERIAL TYPE: 19C. LOCATION OF PRODUCT: 19D. DESCRIPTION:
19B. NAME OF MANUFACTURER:
20A. MATERIAL TYPE: 20C. LOCATION OF PRODUCT: 20D. DESCRIPTION:
20B. NAME OF MANUFACTURER:
21A. MATERIAL TYPE: 21C. LOCATION OF PRODUCT: 21D. DESCRIPTION:
21B. NAME OF MANUFACTURER:
ARRC-BABA-001 (04/2026)
BUY AMERICA CERTIFICATION FORM PAGE 3
PURPOSE: The “Buy America Certification Form” is used to certify that, as required by federal law, all of the iron, steel (for FY23 funded projects and forward), specific construction materials – non-ferrous metals, lumber, composite building materials, plastic and polymer based pipe and tube, (for FY24 funded projects and forward), all construction materials, including manufactured products (for FY25 funded projects and forward) utilized in federally funded projects with an aggregate of $250,000, are produced in the United States in a manner that complies with the Build America, Buy America Act, unless an applicable waiver applies or is granted by the Made in America Office of Management and Budget (MIAO).
GENERAL INFORMATION: BABA guidance requires the following Buy America preference:
The Prime Contractor is responsible for all subcontractors and for ensuring that all manufacturers and suppliers certify materials with the understanding that those certifying the material assume full legal responsibility of the material and are subject to providing documentation verifying the material meets all requirements upon demand. Any additional materials needed for the project should be itemized, specify if BABA applies, and then certified by the engineer and maintained in the grantee’s records with the official Change Order.
Required Contract Provisions for Federal-Aid Contracts [Revised April 2, 2026]
| ADDENDUM NO. 3 |
| QUESTION AND ANSWERS: |
| GENERAL INFORMATION: |
| 2 SOLICITATION NUMBER ITB 2613214320: |
| 3 CONTRACTOR: |
| MATERIALS: |
| 1C LOCATION OF PRODUCT: |
| 1B NAME OF MANUFACTURER: |
| 1D DESCRIPTION: |
| 2C LOCATION OF PRODUCT: |
| 2B NAME OF MANUFACTURER: |
| 2D DESCRIPTION: |
| 3C LOCATION OF PRODUCT: |
| 3B NAME OF MANUFACTURER: |
| 3D DESCRIPTION: |
| 4C LOCATION OF PRODUCT: |
| 4B NAME OF MANUFACTURER: |
| 4D DESCRIPTION: |
| 5C LOCATION OF PRODUCT: |
| 5B NAME OF MANUFACTURER: |
| 5D DESCRIPTION: |
| 6C LOCATION OF PRODUCT: |
| 6B NAME OF MANUFACTURER: |
| 6D DESCRIPTION: |
| 7C LOCATION OF PRODUCT: |
| 7B NAME OF MANUFACTURER: |
| 7D DESCRIPTION: |
| 8C LOCATION OF PRODUCT: |
| 8B NAME OF MANUFACTURER: |
| 8D DESCRIPTION: |
| 9C LOCATION OF PRODUCT: |
| 9B NAME OF MANUFACTURER: |
| 9D DESCRIPTION: |
| 10C LOCATION OF PRODUCT: |
| 10B NAME OF MANUFACTURER: |
| 10D DESCRIPTION: |
| 11C LOCATION OF PRODUCT: |
| 11B NAME OF MANUFACTURER: |
| 11D DESCRIPTION: |
| Select One: [Required] |
| Dropdown29: [Select One] |
| Dropdown30: [Select One] |
| Dropdown31: [Select One] |
| Dropdown32: [Required] |
| Dropdown33: [Required] |
| Dropdown34: [Required] |
| Dropdown35: [Required] |
| Dropdown36: [Required] |
| Dropdown37: [Required] |
| Dropdown48: [Select One] |
| MATERIALS_2: |
| 12C LOCATION OF PRODUCT: |
| 12B NAME OF MANUFACTURER: |
| 12D DESCRIPTION: |
| 13C LOCATION OF PRODUCT: |
| 13B NAME OF MANUFACTURER: |
| 13D DESCRIPTION: |
| 14C LOCATION OF PRODUCT: |
| 14B NAME OF MANUFACTURER: |
| 14D DESCRIPTION: |
| 15C LOCATION OF PRODUCT: |
| 15B NAME OF MANUFACTURER: |
| 15D DESCRIPTION: |
| 16C LOCATION OF PRODUCT: |
| 16B NAME OF MANUFACTURER: |
| 16D DESCRIPTION: |
| 17C LOCATION OF PRODUCT: |
| 17B NAME OF MANUFACTURER: |
| 17D DESCRIPTION: |
| 18C LOCATION OF PRODUCT: |
| 18B NAME OF MANUFACTURER: |
| 18D DESCRIPTION: |
| 19C LOCATION OF PRODUCT: |
| 19B NAME OF MANUFACTURER: |
| 19D DESCRIPTION: |
| 20C LOCATION OF PRODUCT: |
| 20B NAME OF MANUFACTURER: |
| 20D DESCRIPTION: |
| 21C LOCATION OF PRODUCT: |
| 21B NAME OF MANUFACTURER: |
| 21D DESCRIPTION: |
| CERTIFICATION: |
| CONTRACTOR NAME: |
| DATE: |
| COMPANY NAME: |
| Dropdown38: [Required] |
| Dropdown39: [Required] |
| Dropdown40: [Required] |
| Dropdown41: [Required] |
| Dropdown42: [Required] |
| Dropdown43: [Required] |
| Dropdown44: [Required] |
| Dropdown45: [Required] |
| Dropdown46: [Required] |
| Dropdown47: [Required] |
| Signature Block49_es_:signature: |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .