This is Addendum No. 3 for the West Atlantic Street-Mathews Street Drainage Improvements project issued by the Town of South Hill, Virginia on October 28, 2026. The addendum modifies the Instructions to Bidders, Bid Form, Specifications, and Drawings for the drainage improvements construction contract. Key modifications include revisions to project selection language in the Instructions to Bidders; replacement of Bid Form pages 1-7 from Addendum No. 2 with revised pages containing changes to Item Nos. 5 and 11; and updates to Specification Section 012200 regarding Class 1 Riprap installation and Rock Excavation methodology, measurement, and payment terms. Drawing modifications address storm sewer specification changes from RCP to HP piping as shown in profiles, revision of the Storm Structural detail designation, and clarification that concrete sidewalk thickness shall be 7 inches where located behind VDOT CG-9 curb entrance rather than the standard 4-inch thickness. The bid deadline remains November 4, 2026 at 2:00 p.m. local time, as established by Addendum No. 1.

No pricing adjustments, set-asides, or incumbent information are specified in this addendum. The revisions clarify technical specifications and measurement methodologies for riprap and rock excavation work to ensure consistent interpretation and evaluation of contractor proposals. Bidders are required to incorporate all changes from this addendum into their bids and must submit evidence of Virginia Board for Contractors registration as previously required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page No. 1 Addendum No. 3

Addendum No. 3 For

West Atlantic St.-Matthews St. Drainage Improvements Town of South Hill, Virginia

October 28, 2026

You are hereby directed at making the following changes to the contract document for the above-referenced project.

Instruction to Bidders for Construction Contract

• Revise14.03 A to read as follow:

-“Select the project (West Atlantic St.-Mathews St. Drainage Improvements)”

Bid Form for Construction Contract

• Remove and destroy the Bid Form pages 1-7 Addendum #2 in its entirety and replace with the attached Bid Form pages 1-7 Addendum No.3. Item Nos. 5 and 11, were revised.

SPECIFICATION

• SECTION 012200-UNIT PRICES

- Revise paragraph 3.1 B.11 to read as follows:

“Class 1 Riprap: Furnish all labor, materials, equipment, and incidentals necessary to provide and install Class 1 Riprap at the locations shown on the Drawings or as directed by the Engineer. The work shall include excavation, subgrade preparation, furnishing and placement of filter fabric, placement of riprap stone, grading, shaping, and all other work necessary to provide outlet protection and erosion control in accordance with the Drawings, VDOT standards, and the Contract Documents. Riprap shall be placed to the lines, grades, dimensions, and thicknesses specified on the Drawings and detailed in the Contract Documents. Filter fabric shall be installed beneath the riprap in accordance with the manufacturer's recommendations and the Contract Documents. The completed installation shall be stable, properly keyed into the slope or channel, and ready for service. Method of Measurement: Class 1 Riprap shall be measured by the net weight of riprap stone furnished and incorporated into the Work. Measurement shall be based on certified delivery weight tickets submitted to and approved by the Engineer. No separate measurements shall be made for excavation, filter fabric, grading, or incidental work associated with riprap installation. Basis of Payment: Payment shall be made at the Contract unit price per ton for Class A1 Riprap. The unit price shall constitute full compensation for furnishing and placing riprap stone, excavation, filter fabric, grading, labor, equipment, materials, hauling, and all incidentals necessary to complete the work.

Unit: Ton.”

Page No. 2 Addendum No. 3

- Revise paragraph 3.1 C.1 to read as follows:

“Rock Excavation: Furnish all labor, materials, equipment, and incidentals necessary to excavate, remove, haul, and legally dispose of rock encountered during trench excavation for pipe installation. Rock excavation is defined as rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material that exceed 3/4 cu. yd. (0.57 cu. m) for trench excavation that cannot be removed by 150-flywheel horsepower hydraulic excavator (late model Caterpillar 320 or equivalent) without systematic drilling, ram hammering, or ripping. Payment for rock excavation shall include the removal of rock to a depth of at least six (6) inches below the outside bottom of the pipe, as required to provide adequate clearance for bedding. The over-excavated area shall be backfilled with approved crushed stone bedding material placed and compacted to the required grade and elevation in accordance with the Contract Documents. No payment will be made for excavation of boulders, detached rock fragments, or materials that can be removed with conventional excavation equipment, unless otherwise defined as rock in Division 31 – Earth Moving. Method of Measurement: Rock excavation shall be measured in cubic yards in accordance with the requirements of Division 31 – Earth Moving. Quantities shall be determined by the Engineer based on field measurements of rock excavation authorized and accepted for payment. Basis of Payment: Payment shall be made at the Contract unit price per cubic yard for Rock Excavation. The unit price shall constitute full compensation for excavation, removal, disposal, over-excavation beneath the pipe, furnishing and placing crushed stone bedding material, compaction, labor, equipment, and all incidentals necessary to complete the work. Unit: Cubic Yard (CY)”

DRAWINGS

• Sheet C-3-CONSTRUCTION DETAILS

- Delete the following note to Sheet C-3.

“Under STORM SEWER specification delete the requirement of piping to be RCP as it will be HP as shown in profile on Sheet C-2”

- Revise “STORM STRUCTURAL #4 DETAIL MODIFIED DI-3B” to read “STORM

STRUCTURAL #5 DETAIL MODIFIED DI-3B”.

- Note that CONCRETE SIDEWALK DETAIL shows 4-inches thick when behind curb and gutter; however, the sidewalk in this project is located behind VDOT CG-9 curb entrance. Therefore, the sidewalk thickness shall be 7-inches.

“Class 1 Riprap: Furnish all labor, materials, equipment, and incidentals necessary to provide and install Class 1 Riprap at the locations shown on the Drawings or as directed by the Engineer. The work shall include excavation, subgrade preparation, f...
“Rock Excavation: Furnish all labor, materials, equipment, and incidentals necessary to excavate, remove, haul, and legally dispose of rock encountered during trench excavation for pipe installation. Rock excavation is defined as rock material...