This addendum document provides clarifications and modifications to the Request for Proposal (RFP) issued by the Florida Department of Financial Services, Division of Criminal Investigations, for the build-out and equipment installation of two Ford F-550 4x4 Super Cab Chassis vehicles. The solicitation requires the purchase and installation of 83 specified line items per vehicle, including structural components, exterior features, lighting systems, electrical systems, a diesel generator, LED light tower, electric winch, and emergency warning systems. A mandatory pre-response conference was held on June 24, 2026, with an attendee list to be made available. Written questions were due June 26, 2026 at 5:00 p.m., and responses are due July 15, 2026 at 3:00 p.m. in sealed packages to the DFS Office of Purchasing and Contractual Services in Tallahassee, with public opening at 3:15 p.m. the same day. The contract term is one year from the effective date with no renewal option, and the contractor must complete full installation within 120 days from receipt of vehicles.
Addendum No. 2 addresses nine specific questions submitted by potential respondents and provides corresponding departmental responses. Key clarifications include confirmation that contractors may subcontract the removal and reinstallation of existing storage units requiring refurbishment but cannot subcontract vehicle inspection, mechanical service, preventative maintenance, or fleet readiness services. The addendum specifies that existing integral components of the module bodies shall be refurbished, repaired, or replaced as necessary to ensure proper operation, while all additional equipment not part of the refurbished module body shall be furnished as new. Modifications to the RFP specifications address stone guard materials, drain installation standards, terminology corrections for rear wheel fenderettes, awning installation locations on both driver and passenger sides, and compartment vent maintenance and installation standards. All substitute components must be approved by the Department's Contract Manager with supporting manufacturer documentation, and any component that does not meet specifications may result in departmental refusal of acceptance or unilateral contract termination at no cost to the Department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 2 CID QC CHECK LIST.xlsx | XLSX spreadsheet | |
| Attachment 3 Price Response_Revised.xlsx | XLSX spreadsheet | |
| 2526-04 RFP CI-SRT Vehicles_Final.pdf | ||
| Attachment 3 Price Response.xlsx | XLSX spreadsheet | |
| Appendix B - Questions Template.xlsx | XLSX spreadsheet | |
| Addendum No. 1-Timeline6-29-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2526-04 RFP CI
Statewide Response Team Vehicle Equipment Installation
Addendum No. 2
Failure to file a protest within the time prescribed in section 120.57(3), F.S., or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, F.S.
A. Questions and Answers B. Modifications to the RFP
A. Below are the questions and answers related to this solicitation. In the table below, the Department of Financial Services (Department) has answered each of the questions submitted by potential respondents.
No. Attachment Identifier
Section Number
Sub-Section Reference
Item Reference
Page No. Question Department Response
1. Attachment 2, Statement of Work
Section 6, Contractor Requirements
34 Does the Department permit the awarded contractor to utilize subcontractors for portions of the work under this solicitation? If subcontracting is permitted, are there specific portions of the project that may be performed by qualified fleet service providers?
Yes, as stated in Section 6.a.3., the Contractor may subcontract the removal of existing storage units requiring refurbishment from the current chassis and reinstall them on new chassis.
2. Attachment 2, Statement of Work
Are there any vehicle inspection, mechanical service, preventative maintenance, fleet readiness, warranty support, or related services associated with this project that could be subcontracted?
No.
3. Will a list of vendors attending the mandatory pre-response conference be made available following the meeting?
Yes.
4. Attachment 2, Statement of Work
Section 6, Contractor Requirements
34 Can you advise if all the equipment installed on and contained in the storage units to be refurbished are in working conditions?
As described in section 6.a.3., the storage units (module bodies) are being refurbished and transferred to new Ford F-550 chassis. The refurbishment is limited to the module body and its integral components, including items such as the roll-up compartment doors, roll-out drawers/trays, shelving, and associated hardware. Existing integral components should be refurbished, repaired, or replaced as necessary to ensure proper operation.
All additional equipment and components identified in the Statement of Work that are not part of the refurbished module body shall be furnished as new, unless otherwise specified by the Department. This is consistent with Section 6.b.1 of the SOW, which requires the Contractor to use new and unused parts unless otherwise specified.
5. Attachment 2, Statement of Work
Section 7, Component Installation Specifications
35 Item 6 on the Component Installation Specifications – “Set Stone Guards”:
a. There are several products referred to as Stone Guards. Some are designed to protect the grill, while others protect the body and other vehicles, similar to mud flaps. Can you specify the type you are seeking?
b. Is there a particular material that the Stone Guards must be made of, such as rubber or diamond plate?
Stone guards include the protective components currently installed on the existing vehicles, including:
• Front brush/stone guard
• Body protection guards
• Mud flaps
The material shall be equivalent to the material used on the existing vehicles being refurbished.
See revised Attachment 2, Statement of Work, Section 7.
6. Attachment 2, Statement of Work
Section 7, Component Installation Specifications
35 Item 16 on the Component Installation Specifications – “1” drain(s)
a. Do these drains currently exist in the storage units?
b. Do you require a specific number of drains?
No. The existing module bodies do not contain compartment drains.
The Contractor shall install drains in the compartments based on industry standards.
Drains will be installed in locations within the refurbished module body if
c. Must the drain(s) be installed in specific locations?
required or recommended by the Contractor.
7. Attachment 2, Statement of Work
Section 7, Component Installation Specifications
35 Item 18 on the Component Installation Specifications – “Pair 38’ stainless steel rear wheel featurettes”:
a. Should this read, “Pair 38’ stainless steel rear wheel fenderettes”? If not, please clarify.
Yes. This should read: "Pair 38-inch stainless steel rear wheel fenderettes."
The existing fenderettes shall be refurbished, repaired, or replaced as necessary to ensure they are in good serviceable condition.
See revised Attachment 2, Statement of Work, Section 7 and Attachment 3, Price Response.
8. Attachment 2, Statement of Work
Section 7, Component Installation Specifications
35 Item 21 on the Component Installation Specifications – “Carefree Eclipse electric vinyl awning”.
a. Shall this be installed on the driver side, passenger side, or both?
The awning shall be installed on both the driver and passenger sides of the vehicle.
See revised Attachment 2, Statement of Work, Section 7.
9. Attachment 2, Statement of Work
Section 7, Component Installation Specifications
35 Item 29 on the Component Installation Specifications – 4” diameter compartment vent(s)
a. Do these vents currently exist in the storage units?
Yes. The existing module bodies contain compartment vents.
The Contractor shall maintain the existing number of vents.
The Contractor shall install additional vents in the
b. Do you require a specific number of vents?
c. Must the vent(s) be installed in specific locations?
compartments if required or recommended.
The existing vents shall be refurbished, repaired, or replaced as necessary to ensure proper operation in the same locations within the module body, with additional locations if required or recommended by the Contractor.
B. Changes to the RFP are indicated by an underscore, deletions are indicated by a strikethrough. Please be advised that the following changes are applicable to the original specifications of the above-referenced RFP:
7. Component Installation Specifications.
If instructed by the Department to install any of the below-listed equipment (referred to hereafter as “components”), the Contractor shall do so in accordance with the requirements of this SOW. The Department may change the specified installation location of any component listed in this Section 7., Component Installation Specifications, for any vehicle.
1) Module body length (139”)
2) Module body width (90”)
3) Module body compartment height (62”)
4) Diamond plate module roof
5) Module front wall – smooth painted
6) Set stone guards, which include the protective components currently installed on the existing vehicles, including:
• Front brush/stone guard
• Body protection guards
• Mud flaps o The material shall be equivalent to the material used on the existing vehicles being refurbished.
7) Exterior sheeting – 1/8” thickness
8) Set rounded body vertical corners
9) Drip rail package
10) Pair painted exterior wheel well panels
11) Rear diamond plate kick panel
12) Lower body rub rails – “C” channel
13) Scotchlite stripe color –or a comparable brand to be determined
14) Body installation
15) Recessed light tower compartment
16) 1" drain(s)
17) License plate housing with LED light
18) Pair 38” stainless steel rear wheel featurettes Pair 38-inch stainless steel rear wheel fenderettes
19) Knurled grab rail(s) small located:
• One (1) on top of the body, in line with rear folding steps
• One (1) on the interior of each rear compartment door (angled)
20) Chrome folding step(s)
21) Carefree Eclipse electric vinyl awning – 12V, up to 13 ft or a comparable brand to be installed on both the driver and passenger sides of the vehicle.
22) Carefree LED light option for awning- to be operated from the compartments/awning controls or a comparable brand
23) 1/8” exterior compartments-diamond plate:
24) Compartment floors:
• 3/16" thick brushed aluminum
• 1/8" exterior compartments - diamond plate
25) Compartment door construction – conventional compartment door construction; roll-up double compartment door(s), locking
26) Compartment door paddle handle – stainless steel/aluminum anodized; roll-up compartment door(s), locking
27) Compartment shelves - adjustable
28) Aluminum vertical compartment divider(s)
29) 4" diameter compartment vent(s)
30) Turtle tile covering for compartment floors
31) Turtle tile covering for compartment shelves/trays to include nylon straps
32) Rear compartment aluminum ladder tunnel:
33) Slide-master roll-out tray/steel slides
34) Pair Whelen #M6-Series stop-tail/back-up/directional lights or a comparable brand
35) Pair Whelen #M62BTT LED stop/taillights or a comparable brand
36) Pair Whelen #M62BU LED back-up lights or a comparable brand
37) Pair Whelen #M62T LED amber directional lights or a comparable brand
38) Pair of Whelen polished light housings with a self-adjusting back-up alarm or a comparable brand
39) Emergency light master switch green battery indicator light compartment wire cover package
40) Trailer light wiring - 7-pin RV connector; install chassis-supplied backup camera
41) Inpower digital voltmeter / ammeter with low volt alarm and light (single) or a comparable brand
42) Electronic throttle device- to be sealed Carling rocker switch with blue indicator light or a comparable brand
43) 12 VDC battery/charging system – single National Fire Prevention Association (NFPA); clear light cut-out; park position generator installation – 120/240 volt
44) Magnum #MS2812 – 3000-watt pure sine wave inverter / 125A charger or a comparable brand
45) Magnum #ME-RC50 – inverter/charger remote control and monitoring panel or a comparable brand
46) Magnum #ME-400F – fuse holder and 400A slow blow fuse or a comparable brand
47) Magnum #ME-BMK-R-L – battery monitoring kit; household 15-amp interior receptacle(s), duplex or a comparable brand
48) Household 120v/15-amp duplex exterior receptacle(s)
49) Will-Burt #NS2.3-750 WB X200 (7.5 ft) LED Night Scan Chief light tower – 12V cab-mounted tower-up indicator light(s) or a comparable brand
50) Will-Burt #4756919 NFPA handheld remote with e-stop or a comparable brand
51) 12,000 lb #M12-S electric winch with 3/8" synthetic rope
52) 12-meter remote control | NFPA front Ford semi-hidden bumper kit
53) Pair cast speakers through bumper | Ford Whelen #295HFS2 siren system or a comparable brand
54) Whelen EZ Super-LED® scene light(s) with chrome flange – side and rear; reverse relay for rear scene lights or a comparable brand
55) Whelen headlight flasher or a comparable brand
56) Vanner electronic LED flasher unit or a comparable brand
57) Whelen ION T-Series Super-LED warning light(s) – blue with black flange
58) Whelen chrome flange (ION T-Series) or a comparable brand
59) Whelen Series Super-LED warning light(s) – blue, clear lens, steady burn
60) Whelen chrome flange or a comparable brand
61) Whelen Series Super-LED warning light(s) – blue, clear lens, steady burn
62) Whelen chrome flange or a comparable brand
63) Whelen Series Super-LED warning light(s) – blue, clear lens, steady burn
64) Whelen chrome flange or a comparable brand
65) Whelen Super-LED traffic advisor with control head or a comparable brand
66) Whelen Liberty II 59" Super-LED light bar – full with takedowns and alley lights or a comparable brand which includes:
• Two(2) #IHDCB Solo Series linear-LED flashers, one (1) dual linear blue
• Four (4) #IWDLB Solo Series linear-LED flasher, one (1) long blue
• #ITL12 two (2) long Super-LED takedown lights
• #IA3 two (2) Super-LED alley lights
67) Permanent light bar mounting kit – cab roof; roadside emergency safety kit (8-piece); body manufacturer’s manual(s)
68) Diesel generator fueled from vehicle tank (Vehicle Mount, 6 kilowatt minimum)
69) Wiring manual(s)
70) Wiring manual(s) - electronic format engraved label package
71) Seating capacity tag
72) Removal of existing storage units requiring refurbishment from the current chassis and reinstall them onto new chassis
73) Panorama Ante Base-FIN-LP Radio Only-16' Cable
74) Engraved fluid capacity and type plate
75) Overall height/length/GVWR plate
76) Electric cord reel label chassis-related expenses administrative
77) Conversion/upfit warranty
78) Limited modular body structural warranty.
79) Limited electrical warranty.
80) Limited paint warranty
81) Factory liaison | project coordinator
82) Engineering/pre-construction review
83) In-house pre-delivery / detailing/inspection
All components that the Department instructs the Contractor to install must meet, be equivalent to, or exceed the specifications listed above. If the Contractor is offering to provide a substitute component as an equivalent that meets or exceeds a required component, the Contractor shall provide all manufacturer documentation, including the applicable manufacturer specification sheet, to the Department’s Contract Manager to support that the substitute component is equivalent to or exceeds the specifications listed above. The Department shall evaluate the proposed substitute component and either approve or reject the Contractor’s proposed substitute; this decision shall be solely within the Department’s discretion.
The Contractor shall notify the Department if, at any time during the Contract term, any of the above-listed components become obsolete, discontinued, or replaced by the manufacturer and shall propose a substitute component to the Department for review and approval. The Contractor shall provide all manufacturer documentation, including the applicable manufacturer specification sheet, to the Department’s
Contract Manager to support the use of the substitute component in place of a component listed above. The Department shall evaluate the proposed substitute component and either approve or reject the Contractor’s proposed substitute; this decision shall be solely within the Department’s discretion.
The Contractor shall provide and install any substitute components the Department requires at the same prices provided on Attachment 3, Price Response, for the component for which the substitution is made.
If any installed component, including substituted components that the Department has approved, does not meet the specifications contained in this SOW, the Department, in its sole discretion, may refuse acceptance of that component at no cost to the Department or unilaterally terminate the Contract at no cost to the Department. In either event, the Contractor must remove the rejected equipment at no cost to the Department.
-Remainder of Page Left Intentionally Blank-