About this file

This document is Addendum No. 2 issued by U.P. Engineers & Architects, Inc. for the Linton Creek Culvert Replacement project in McMillan Township, Luce County, Michigan. The addendum clarifies, modifies, and changes the original plans and specifications for this contract. It notes that dirt spoils from the project may be placed at the Camp 7 Road pit, and it deletes certain sections related to the design/build timber panel-lam snowmobile bridge substructure.

The related state and local contract opportunity is for Luce County's Culvert & Bridge Replacements project, identified as File No. 751/21232.ABG. The bid attachments must be uploaded to SIGMA VSS, and no online questions should be submitted through VSS - all questions should be emailed to the project contact. The bid submission deadline is 2:00 p.m., and emailed submissions may be accepted on a case-by-case basis if SIGMA VSS issues are experienced.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

707 Ashmun Street Sault Ste. Marie, MI 49783

906-635-0511 • 800-867-0511 • Fax: 906-635-0612

Offices also in:

Houghton

Iron Mountain Ishpeming Marinette

U.P. Engineers & Architects, Inc.

www.UPEA.com

[M12-02386]

ADDENDUM NO. 2

TO THE

LINTON CREEK CULVERT REPLACEMENT

MCMILLAN TOWNSHIP, LUCE COUNTY, MI

ADDENDUM NO. 2 is issued November 3, 2022, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 2 is hereby made part of the Contract Documents for the contract noted below.

File No. 751/21232.ABG, Linton Creek Culvert Replacement

Please acknowledge receipt of this ADDENDUM NO. 2 on the appropriate blank on the Bid Form and also include this addendum with the bid package.

GENERAL

1. Dirt spoils from the project may be placed at the Camp 7 Road pit which is 1.4 miles from the Linton Creek crossing.

SPECIFICATIONS

2. Section 32 34 00, Design/Build Timber Panel – Lam Snowmobile Bridge

a. 2.04 SUBSTRUCTURE - Delete A., B. and C.

b. Delete Section 5.04 – PIILE DRIVING

END OF ADDENDUM NO. 2