Addendum No. 1~4.pdf
PDF 5 MB Posted
- Solicitation number
- BD-21-1025-DOCFS-9813-59896
- Issued by
- Norfolk County, Massachusetts
About this file
This document is an Addendum No. 1-4 related to the DRM 2018-46 #2 Conduit Installation @ MCI - Cedar Junction contract opportunity issued by the Massachusetts Department of Correction (DOC). The contract involves the installation of conduit at the MCI - Cedar Junction facility. Plans and specifications are available starting March 18, 2021, and bidders must submit a bid intent form by noon on March 26, 2021 to the DOC's DRM.
The pricing terms, set-asides, incumbents, funding sources, and other salient details are not provided in the addendum. Interested parties should contact Darlene Keane at Darlene.Keane@doc.state.ma.us to set up an appointment to review the plans and specifications and obtain additional information about the contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Intent Form~12.rtf | RTF text file | |
| Prevailing Wages~11.pdf | ||
| Prevailing Wage Statement of Compliance~36.pdf | ||
| Copy of sdp-rplan-form-3-reporting~6.xlsx | XLSX spreadsheet | |
| Where to get plans and specs~17.docx | DOCX document | |
| Bid Package_DRM 2018-46 2.doc | DOC document | |
| Plan Holders List~16.docx | DOCX document | |
| Bid Results~37.doc | DOC document | |
| Prevailing Wage Payroll Report Form~36.pdf | ||
| Site Visit List~3.pdf | ||
| Bidder Checklist~27.doc | DOC document | |
| DRM 2018-46 2 Conduit Installation CLARIFICATION - Typographical Error Pre-Bide Site Visit Date.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .