Addendum No. 1 - CSPS Filter First RFP.pdf
PDF 223 KB Posted
- Attached to
- CSPS Filter First - Please see Attachment
- Solicitation number
- RFP-CSP-260000000003-4
- Issued by
- Kent County, Cheboygan City, Michigan
About this file
This document is an Addendum No. 1 issued by Cedar Springs Public School District in Cedar Springs, Michigan for a Filter First Fixture Replacement Installation project. The addendum, dated October 10, 2025, provides clarifications to the original Request for Proposal (RFP) issued on October 1, 2025, and applies to fixture replacement work within the school district's facilities.
The addendum includes two key items: First, any electrical work required for fixture installation is the responsibility of the bidder and must be incorporated into their bid proposal. Second, all work must be performed outside of school hours, with the district's school hours and calendar available for reference on their website at https://www.csredhawks.org/schools. The document provides contact information including a phone number (616-696-1204) and email (cspstogether@csredhawks.org) for potential inquiries related to the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 3 - CSPS Filter First RFP.pdf | ||
| Addendum No. 2 - CSPS Filter First RFP.pdf | ||
| CSPS Filter First RFP - FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEDAR SPRINGS PUBLIC SCHOOL DISTRICT
204 E Muskegon Street, Cedar Springs, MI 49319 cspstogether@csredhawks.org |(616) 696‐1204 csredhawks.org
ADDENDUM NO. 1 - CEDAR SPRINGS PUBLIC SCHOOLS - FILTER FIRST FIXTURE
REPLACEMENT INSTALLATION
October 10, 2025
The following addendum items (Addendum No. 1) are clarifications to the Cedar Springs Public Schools - Filter First Fixture Replacement Installation RFP issued on October 1, 2025. This addendum shall be a part of the RFP.
Item No. 1 Any electrical work needed to install the fixtures is the responsibility of the bidder and should be incorporated into their bid.
Item No. 2 Work must be done outside of school hours. School hours and the District calendar can be found on the District’s website at https://www.csredhawks.org/schools
File details come from the government source that posted it. Updated .