This is Addendum No. 1 to RFQ-484-101221 issued by the Georgia Department of Transportation (GDOT) Office of Transportation Services on September 27, 2021, pertaining to On-Call Roadway Design Services provided statewide across all Georgia counties. The addendum addresses written questions received during the RFQ Phase and provides clarifications and modifications to the original solicitation. The document removes Area Class 9.02 (Erosion, Sedimentation, and Pollution Control Comprehensive Monitoring Program) from prequalification requirements, as field work and rainfall data collection are not required under this contract. A signed acknowledgment of the addendum must be attached to Phase I submissions. The scope of work encompasses a variety of on-call roadway design services across multiple phases, including concept, preliminary, and final phases covering areas such as roundabout feasibility studies, capacity analysis, geometry and alignment design, drainage and hydraulic studies, erosion and sediment pollution control plans, signing and pavement marking, and signal design. Work shall comply with GDOT design policies, standards, the GDOT Design Policy Manual, and AASHTO guidelines.

The Prime Consultant must be prequalified by GDOT in five specific area classes covering two-lane through multi-lane rural and urban roadway design and interstate highway design. The team collectively must demonstrate prequalification in nine additional area classes including traffic operations, landscape architecture, hydraulic and hydrological studies, bicycle and pedestrian facility design, and erosion control plan preparation. Prequalification expiration dates must remain current by the RFQ deadline. A related question regarding the adjustment of work volume ranges for previously awarded GDOT contracts was referred for discussion at the Consolidated Recipient Committee (CRC) Procurement meeting scheduled for October 6, 2021, with potential revisions to Section IV, Item D to be addressed in a subsequent addendum prior to the RFQ due date.

Text of this file

ADDENDUM NO. 1

ISSUE DATE: 9/27/2021

This Addendum shall become and form a part of the RFQ for:

RFQ-484-101221 – On-Call Roadway Design Services, Statewide

NOTE: PLEASE REVIEW CAREFULLY! THERE MAYBE CHANGES TO THE INFORMATION TO BE PROVIDED. FAILURE TO ADHERE TO ANY CHANGES ADDRESSED IN THIS ADDENDUM MAY RESULT IN DISQUALIFICATION.

In the event of a conflict between previously released information and the information contained herein, the latter shall control.

NOTE: A signed acknowledgment of this addendum (this page) MUST be attached to your SUBMITTAL for Phase I.

Firm Name

Signature Date

Typed Name and Title

Georgia Department of Transportation (GDOT) Office of Transportation Services Procurement

One Georgia Center 600 West Peachtree Street, NW

19th Floor Atlanta, Georgia 30308

This Addendum, including all questions and answers, shall become and form a part of the original RFQ package and shall be considered when preparing your proposal.

The purpose of this addendum is to provide the answers to the written questions received during the question and answer period of the RFQ Phase as follows:

I. Written Questions and Answers:

Questions Answers

1. Can you adjust the range of the previously awarded work by GDOT? The range seems very small from nothing to the maximum for credit. When looking at the latest statistics reports, the top 5 firms with GDOT all have over $100 million in fees with GDOT. There are a large number with over $10 million. Treating these the same as the ones with over $3 million does not seem to serve the purpose. I know this is total contracts, but it gives a good idea of current loads.

Can we suggest:

$0-$1 Million Excellent $1 million to $3 million good $3 million to $6 million Adequate $6 million to $10 million Marginal

>$10 million poor

This question will be discussed at the next CRC Procurement meeting scheduled for 10/06/21. After the meeting, if requirements change for Section IV. Item D.

Volume of Work Previously Awarded by GDOT, an Addendum will be posted prior to the RFQ due date/time.

2. Will area class 9.02 be used on the project? Most of the time design projects do not collect rainfall data.

No field work is required as part of this project/contract;

therefore, Area Class 9.02 is not required. See Addendum below for revised EXHIBIT I-1 that removes Area Class 9.02.

Addendum No. 1

3. Is pre-qualification in area class 9.02 Erosion, Sedimentation, and Pollution Control and Comprehensive Monitoring Program actually required?

See answer to Question #2.

II. RFQ, EXHIBIT I-1 is DELETED in its entirety and REPLACED WITH the following:

EXHIBIT I-1

Project/Contract

1. Project Number(s): N/A

2. PI Number(s): N/A

3. Counties: All

4. Description: On-Call Roadway Design Services, Statewide

5. Required Area Classes:

Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom GDOT will contract. The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members. The Prime Consultant must be prequalified in the Area Classes identified below in Section 5.A. The Prime Consultant or sub-consultant team members must be prequalified in the Area Classes identified below in Section 5.B. Respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications. The area classes listed on the summary form must meet all required area classes or the team will be disqualified. The Prequalification Expiration Date must be current by the deadline stated for this RFQ.

A. The Prime Consultant MUST be prequalified by GDOT in the area classes listed below:

Number Area Class

3.01 Two-Lane or Multi-lane Rural Roadway Design

3.02 Two-Lane or Multi-lane Urban Roadway Design

3.03 Multi-Lane Urban Roadway Widening or Reconstruction Design

3.04 Multi-lane Rural Interstate Highway Design

3.05 Multi-lane Urban Interstate Highway Design

B. The Team (either the Prime Consultant and/or one or more of their sub-consultant team members) MUST be prequalified by GDOT in the area classes listed below:

Number Area Class

3.01 Rural Roadway Design

3.02 Urban Roadway Design

3.03 Complex Urban Roadway Design

3.04 Rural Interstate Highway Design

3.05 Urban Interstate Highway Design

3.06 Traffic Operations Studies

3.07 Traffic Operations Design

3.08 Landscape Architecture

3.09 Traffic Control Systems Analysis, Design and Implementation

3.12 Hydraulic and Hydrological Studies (Roadway)

3.13 Bicycle and Pedestrian Facility Design

9.01 Erosion, Sedimentation and Pollution Control Plan (ESPCP) Preparation

Addendum No. 1

6. Scope:

The Consultant shall provide On-Call Roadway Design Services, Statewide on a variety of different projects. These projects will vary in scale, scope and complexity. All work will be done in accordance with Georgia Department of Transportation (GDOT) design policies and standards with relevant project-specific requirements and restraints for conformity to all applicable design standards and guidelines such as GDOT’s Design Policy Manual and the American Association of State Highway and Transportation Officials (AASHTO) Policy on Geometric Design of Highway and Streets. This work may include, not be limited to, the following when requested:

A. Concept Phase: Roundabout Feasibility Study.

B. Concept/Preliminary Phase: Capacity - Analysis and Summary Report (no modeling).

C. Concept/Preliminary Phase: Capacity - Analysis and Summary Report (modeling).

D. Preliminary Phase: Geometry – Alignment Design.

E. Preliminary Phase: Geometry – Alignment and Cross Section Design.

F. Preliminary Phase: Drainage - Hydraulic Studies and Culvert Designs.

G. Preliminary Phase: Drainage – Municipal Separate Storm Sewer System (MS4) Feasibility Report.

H. Preliminary Phase: Drainage - Urban Drainage Layout.

I. Preliminary Phase: Drainage - Urban Drainage Design.

J. Preliminary Phase: Drainage - Rural Drainage Layout.

K. Preliminary Phase: Drainage - Rural Drainage Design.

L. Preliminary Phase: Erosion Sediment Pollution Control Plans (ESPCP) - Outfall identification and sediment basin design.

M. Preliminary Phase: ESPCP – Best Management Practices (BMP) plan sheets.

N. Preliminary Phase: Signing & Pavement Marking (S&PM) – S&PM Plans (Preliminary Field Plan Review [PFPR] Plans).

O. Final Phase: Geometry – Staging.

P. Final Phase: S&PM – S&PM Plans (Final Field Plan Review [FFPR] plans).

Q. Final Phase: Signal - Signal Design (isolated).

R. Final Phase: Signal - Signal Design (including interconnect/Intelligent Transportation System [ITS]).

S. Final Phase: ESPCP - Erosion Control Design (Complete ESPCP).

7. Related Key Team Leader:

Roadway Design

Other files

File Type Posted
Award Information —
Selection of Finalists —
Addendum No. 2 —
RFQ-484-101221 —
Selection of Firm —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .