This is Addendum No. 2 to the bid documents for the LP Wilson Community Center Restroom Renovations project issued by the Town of Windsor, Connecticut Board of Education for the facility located at 601 Matianuck Ave, Windsor, CT 06095. The project involves demolition and upgrades to existing restrooms. The original bid documents were dated November 3rd, 2022, with the initial bid due date subsequently extended to Wednesday, January 28th, 2026 at 10:00 a.m. Bidders are required to indicate receipt of this addendum on the bid form and reflect all changes in their submitted bids. The addendum was issued on January 22, 2026, and includes revised drawings dated the same day, available via the provided Dropbox link.
The addendum addresses critical clarifications regarding slab removals, requiring contractors to include in their bids the removal of the entire slab shown in the dashed area on demolition plans, with the new slab to be pitched to the new floor drains. Additional trenches beyond this specified area shall be cut as required for sanitary line installation per revision 2 of the updated plans. The addendum explicitly states that additional compensation or change orders will not be granted after contract award or during construction due to any omission of the listed items by the bidder, making it essential that contractors carefully review and incorporate all specified work into their bid proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R:\A-YR-2021\21132 LP Wilson Community Center Restroom Renovations, Windsor, CT\RDI Bidding\Addendum No. 02 21132.Docx
ADDENDUM NO. 2
LP Wilson Community Center, Board of Education - Restroom Renovations 601 Matianuck Ave, Windsor, CT 06095
TOWN OF WINDSOR
R&D File No. 21132
JANUARY 22, 2026
The following list of responses are hereby made to the bid documents dated November 3rd, 2022, for the project referred to above. Bidders shall indicate receipt of this addendum on the bid form and reflect the changes in bids submitted. Additional compensation or change orders will not be granted after the contract is awarded or during construction due to omission of the listed items by the bidder.
1. Clarifications on slab removals:
Contractors shall carry on their bids the removal of entire slab shown on the dashed area on demolition plans, the new slab shall be pitched to the new floor drains. Additional trenches beyond this area shall be cut as required for sanitary lines. See revision 2 on updated plans
2. Bid due date has been extended to:
Wednesday 28th at 10:00am
ATTACHMENTS
- Revised drawings 01/22/2026
END OF ADDENDUM NO. 2