About this file
This is an Addendum No. 001 issued by Georgia Institute of Technology, a unit of the University System of Georgia, related to a Request for Qualifications and Proposals for design-build services. The project, titled "GTRI 1838 B12 Core & Shell Interior Build-Out" (Bid-Contract No. 2024-22 / Project No. 0099-2021), is located in Atlanta, Georgia. The addendum addresses four contractor questions regarding scope clarifications for Phase I of the project. Key clarifications include confirmation that the design-builder is responsible for providing pathways for security infrastructure (UL2050 Alarm System, Access Control, IP-based cameras, and pink noise devices) and documenting their locations on design documents, while GTRI Research Security will design and identify installation locations. The design-builder is also responsible for installing Network IT/Data ports and racks as specified by GTRI and for installing the Audio-Visual system designed by GTRI AV. The solicitation is confirmed to include only Phase I scope of work as defined in the RFQ/RFP Project Description section, with team resumes required during Step II submissions rather than Step I.
The revised Stated Cost of Limitation (SCL) for Phase I is $25,000,000. GTRI will be responsible for all costs related to accreditation and approvals as noted in the feasibility study section 3.3.1.2. The addendum requires that design-builders acknowledge receipt of the addendum by signing and including it with their qualifications package; failure to do so may result in contractor disqualification. Donna Vongsouvan, Contracting Officer, and Carla Barbour, Sr Construction Manager, are the designated contact personnel for the procurement. The addendum was issued on November 30, 2021.
Text of this file
A Unit of the University System of Georgia An Equal Education and Employment Opportunity Institution
November 30, 2021
ADDENDUM NO. 001
Request for Qualifications and Proposals to Provide
Design-Build Services For:
“GTRI 1838 B12 Core & Shell Interior Build-Out” Bid-Contract No. 2024-22 / Project No. 0099-2021
Georgia Institute of Technology
Atlanta, Georgia
Project Budget:
The revised Stated Cost of Limitation (SCL) for Phase I of this project shall be $25,000,000.
Responses to Contractor Questions:
1. Please confirm whether the design-builder will be responsible for the design and installation of security, intrusion detection, data/AV, etc.
Response:
a. GTRI Research Security will design/identify where UL2050 Alarm System, Access Control, IP-based Cameras and Pink Noise will be installed but it is the Design-Builder’s responsibility to provide the pathways for this security infrastructure; AND identify [capture] where those pathways, alarm devices, card readers, cameras, pink noise devices and all applicable panels and keypads are located within the space on design documents.
b. GTRI will specify the locations and quantities of Network IT/Data ports and racks and the Design-Build team will be responsible for installing them.
c. GTRI AV will design the Audio-Visual system for the space and the Design-Build team will be responsible for the installation.
2. Please confirm the current solicitation is only intended to include the
Phase 1 scope of work as defined in in the RFQ/RFP Project Description section.
151 Sixth Street., NW Atlanta, Georgia 30332
A Unit of the University System of Georgia An Equal Education and Employment Opportunity Institution
The current solicitation only includes the Phase I project scope as described under the section “Project Description.”
3. Please confirm per the feasibility study section 3.3.1.2 GTI will be responsible for costs related to the Accrediting Official and associated approvals.
GTRI will be responsible for all costs related to accreditation and approvals.
4. Page 11 of the RFQ, section B only requests project experience and does not request proposed team resumes, please confirm resumes not required at this stage?
Per Step I of the RFQ/RFP each firm must provide their Firm’s relevant project experience and qualifications, including the demonstrated ability of firm in effective management of construction of facilities comparable in complexity, size, and function, for public owners. Team resumes are a requirement of the Step II process “Project Management Proposal Submissions.”
End of Addendum No. 01
* * * PLEASE ACKNOWLEDGE ADDENDUM BY SIGNING AND INCLUDING WITH YOUR
QUALIFICATIONS PACKAGE. FAILURE TO DO SO MAY SUBJECT CONTRACTOR TO
DISQUALIFICATION. * * *
Design-Builder (Legal Firm Name)
Signature Print Name/Title of Signer
Donna Vongsouvan, Contracting Officer donna.vongsouvan@facilities.gatech.edu Carla Barbour, Sr Construction Manager cbarbour3@gatech.edu
Other files
| File | Type | Posted |
|---|---|---|
| Final Selection_Award Info | — | |
| RFQP-DB | — | |
| Exhibits | — | |
| Shortlist Announcement | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .