ADDENDUM NO 3A _ Electrical_Low Voltage.pdf

PDF 87 KB Posted

Attached to
1892 Historic Paulding County Courthouse - New City of Dallas - City Hall: Electrical/Low Voltage
Solicitation number
PE-71050-NONST-2025-000000009
Issued by
Peach County, Georgia

About this file

This document is an addendum to the bid solicitation for the Electrical/Low Voltage package for the new Dallas, Georgia City Hall project. The addendum announces that the bid opening date has been pushed back to November 6 at 10:00 a.m., with answers from the architect provided on October 30th and a silent period in effect from November 1st until the bid opening. The addendum also clarifies that there are 4 monitors in the boardroom, each requiring both power and data mounted 72" A.F.F.

The related state and local contract opportunity involves furnishing all materials, labor, tools, skills, equipment, and incidentals for the 1892 Historic Paulding County Courthouse - New City of Dallas - City Hall Electrical/Low Voltage project. Bids will be received by the City of Dallas until October 24, 2024 at 10:00 AM. A recommended pre-bid conference will be held on October 9, 2024 at the 1892 Historic Paulding County Courthouse. Plans, specifications, and contract documents can be obtained by email request, and all questions must be submitted to the architect via email.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL/LOW

VOLTAGE

ADDENDUM NO: 03

CarterWatkins Associates

Architects, Inc.

137 E. Washington Street

Monroe, Georgia 30655

PROJECT: THE NEW DALLAS, GEORGIA CITY HALL

ELECTRICAL/LOW VOLTAGE PACKAGE

DATE OF ISSUE: 10.18.2024

Item #1: The bid opening date has been pushed back to November 6 at 10:00 a.m. Below are the new answers from architect and silent period dates:

Answers from Architect to Bidders: October 30th (Wednesday) at 11:00 am

Silent Period (no contact until bid opening): November 1st (Friday) at 10:00 am

Item #2: Please note that there are 4 monitors on page A-111 in the boardroom, exact location TBD. Each of these locations need both power and data mounted 72” A.F.F.

END OF ADDENDUM NO: 03

This addendum modifies the Contract Documents only in the manner and to the extent stated herein and shown on any accompanying drawings and will become a part of the Contract Documents. Except as specified or otherwise indicated by this addendum, all work shall be in accordance with the basic requirements of the Contract Documents.

PROPOSER SHALL ACKNOWLEDGE RECEIPT OF ADDENDUM IN A SPACE PROVIDED ON THE BID

PROPOSAL FORM; FAILURE TO DO SO MAY CONSTITUTE AN INFORMALITY IN THE PROPOSAL.

The following clarifications, amendments, additions, revisions, changes and/or modifications shall take precedence over the drawings and specifications for the above-named project only in the amount and to the extent hereinafter specified in this addendum. Where any item called for in the specifications or indicated on the drawings is not supplemented hereby, the original requirements shall remain in effect. Where any original item is amended, voided or superseded hereby, the provision of such item not specifically amended, voided or superseded shall remain in effect.