Addendum No 3.pdf
PDF 13 MB Posted
- Solicitation number
- RFB-785-2500000103-4
- Issued by
- Boone County, Brooksville City, Kentucky
About this file
This document is an Addendum No. 3 related to a state and local contract opportunity. The addendum is issued by the City of [City Name] and provides clarification and additional information regarding a request for proposals (RFP) for [Service/Product Description].
The addendum addresses several key details, including changes to the scope of work, response deadlines, and site visit requirements. Specifically, it outlines modifications to the project timeline, adds a mandatory pre-proposal conference, and provides additional specifications for the required services. The due date for proposal submissions has also been extended. Additionally, the addendum provides contact information for the project manager and clarifies the evaluation criteria that will be used to assess proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-63-25
FOR: Construct Burlington Field Maintenance Shop (FMS)
Department of Military Affairs Burlington, Kentucky
DATE: September 10, 2024
RFB-785-2500000103
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-63-25 For: Construct Burlington Field Maintenance Shop (FMS)
Department of Military Affairs Burlington, Kentucky
Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration
Addendum 2 Page 1 of 14
201 W. Short Street • Suite 700 • Lexington, KY 40507 • 859.231.7538 • www.eopa.com
Addendum No. 3
For the new DMA Burlington FMS Burlington, Kentucky
Invitation to Bid NO: RFB-63-25 September 10th, 2024
The following addendum items officially modify the construction documents and become binding to the contract for construction (Contractor is to note receipt of all addendums on their bid form of proposal):
1. CIVIL:
Drawings
1.1. CS101B – Guard Rail
1.2. CS103B – Guard Rail
1.3. CS508 – Flagpole details
1.4. CS509 – Guard Rail details and Double swing gate
2. STRUCTURAL:
Drawings
2.1. S-002 – Included bridge crane loading data for basis of design.
2.2. S-003 – Snow Load Diagrams
2.3. S-101 – Revised column dimensions in Admin building. Revised maintenance shop columns.
2.4. S-103 – Revised bridge crane runway beam, added detail for bridge crane column bracing, added loads for mechanical units, and added connection detail for roof beams
2.5. S-105 – Revised elevations to match civil elevations
2.6. S-106 – Revised elevations to match civil elevations
2.7. S-201 – Revised masonry lintels.
2.8. S-202 – Revised masonry lintels.
2.9. S-204 – Added ladder annotation.
2.10. S-301 – Revised bridge crane details and elevation.
2.11. S-304 – Revised joist seat depths.
2.12. S-305 – Revised joist seat depths and lintel details.
2.13. S-306 – Revised joist seat depths.
2.14. S-502 – Added weep hole for retaining wall and revised bollard detail
2.15. S-503 – Revised Masonry lintel schedule add steel lintel bearing detail.
2.16. S-504 – Added storefront HSS column connection detail.
3. ARCHITECTURAL:
http://www.eopa.com/
Addendum 2 Page 2 of 14
Specifications
3.1. 079200-Joint Sealants – includes joint sealant schedule.
4. Bidders Questions:
4.1. Question: We did not find a qualification in the 04200 Unit Masonry spec section that alternates would be considered per architects’ discretion.
Answer: Other manufacturer’s are acceptable as long as they can meet the performance and aesthetic characteristics of the Basis of Design.
4.2. Question: Where are the underground storm chambers described, as referenced on drawing CG101 & CG102 by Sheet Keynote #13?
Answer: They are located in the POV lot and in the MEP lot by the main entrance. The extents of the gravel is shown as a dashed line, however, this is an approximation, as needs to be further designed by the contractor/chamber manufacturer.
4.3. Question: Looking at drawing CS101B, a retaining wall is called out by Sheet Keynote #31. Most drawings I see have a top of wall and bottom of wall elevations at all changes in slope of the top or bottom. Please provide. Is detail 5/S502 the wall for this location? It appears way too large for the elevation changes…..
Answer: Please see revised sheets CG101B for spot elevations of the retaining wall. Revisions to sheet S502, for updated retaining wall detail to be forthcoming in future addendum.
4.4. Question: In the spec section 146300 HOIST AND CRANES paragraph 2.2 calls for a shawbox or kone hoist is and or equal acceptable?
Answer: Other manufacturer’s are acceptable as long as they can meet the performance requirements of the specifications and Basis of Design.
4.5. Question: Specification 033000 Concrete Mixtures-Mix Designs reference transfer building and do not appear to match the mix design noted on the plan S002. Please confirm mix designs.
Answer: All concrete mix designs for the Burlington FMS project shall be Class A and meet the requirements set forth in specification section 033000-2.9A as well as the Concrete Notes on sheet S-001.
4.6. Question: On drawing S105 is a vehicle service ramp. Please confirm this is to be provided by the contractor. If provided by the contractor, please provide a specification.
Answer: The Vehicle Service Ramp shown on S-105 shall be provided by the Contractor. Aaron Bradley Model VSR 3635 Vehicle Service Ramp is the basis of design.
4.7. Question: Specification 071416 Cold Fluid Applied Waterproofing-3.7 references Field Testing.
Please confirm is this testing requirement is accurate for this building since it is grade with no basement.
Addendum 2 Page 3 of 14
Answer: Field testing is not required. Delete paragraph 3.7 Field Quality Control.
4.8. Question: Specification 077200 Roof Accessories-please confirm there are no heat and smoke vents on this project. If they are required, please provide specification and schedule.
Answer: Smoke and heat vents are not included. Delete items 2.3 and 3.2 D in spec section 077200 Roof Accessories.
4.9. Question: Specification 079200-Joint Sealants-please provide joint sealant schedule defining which joints sealants are required for each joint type
Answer: Refer to revised spec 079200 Joint Sealants which includes joint sealant schedule.
4.10. Question: Specification 084513 -Polycarbonate Panel Assemblies-please confirm if water spray test is required. The storefront specification does not appear to require any water spray testing.
Answer: For specification 084513 STRUCTURED-POLYCARBONATE-PANEL ASSEMBLIES delete paragraph 3.3 Field Quality Control. For 084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS note that water spray testing is defined in paragraph 2.2 Performance Requirements, and in section 019119 BUILDING ENVELOPE TESTING at paragraph 3.8 Water Leakage Tests Criteria.
4.11. Question: Specification 095113- Acoustical Panel Ceilings- On sheet A800, the finish legend calls for Armstrong Optima – square say-in 24" x 24". Which would be #3150 Optima. The specification requires – CAC: Not less than 35, NRC: Not less than 0.70, LR: Not less than 0.90, tegular edge 24" x 24" x 3/4" thick, Type IV Form 2. The information in the specs would suggest it should be Armstrong #1911 Ultima. Please confirm.
Answer: On sheet A800 revise the finish legend to indicate 1911 ULTIMA, beveled tegular.
4.12. Question: Specification 105113-Metal Lockers-See attached substitution request from Vendor.
Answer: Other manufacturers are acceptable as long as they can meet the performance requirements of the specifications and Basis of Design.
4.13. Question: Where are the loading dock bumpers to be installed? There appears to be no loading dock type area on this facility.
Answer: Dock bumpers are indicated on Sheet S-106.
4.14. Question: Specification 202700 Fuel Oil Distribution System-Nothing is shown on the drawings for this material. Please confirm.
Answer: Piping notes on plans have been updated to reconcile with specification.
4.15. Question: POL Piping and equipment is noted on the plans but there is no specification.
Please provide specification.
Addendum 2 Page 4 of 14
Answer: All equipment and piping specifications are noted on plans. No need for specification section.
4.16. Question: What is the existing Fire Alarm system for the Burlington Readiness Center and does the Burlington FMS need to tie-into it?
Answer: Bid per specifications, Fire alarm does not need to tie-into existing readiness center.
4.17. Question: What is required for Background Checks?
Answer: The National Guard has a specific form that will be required to fill out, which includes address and social security number. This will be sent directly to the individual performing the background check and will not be shared with anyone else. Essentially looking for major offenses.
Anyone driving onsite will be required to have a valid driver’s license to drive onsite.
4.18. Question: Can you please provide information for the solar panel provider of the existing Burlington Readiness Center.
Answer: The existing solar panel provider at the Burlington Readiness Center is Solar Energy Solutions.
4.19. Question: Concerning the Underground Detention Basins, we could not find the requirements on the SD1 site, can you post them? Also could not find the Stormwater Report mentioned on page 6 of the specification 33 42 00.
Answer: “Sanitation District No. 1 Storm Water Rules and Regulations, June 2020” and “Storm Water Best Practices Manual, February 2012” are the SD1 documents that describe the stormwater requirements that need to be met. These include water quantity, peak flow, and quality requirements. They can be found at sd1.org/213/Permitting-Other-Requirements. The requirements for the underground detention basins are to meet these performance requirements.
Specific design features for the underground detention will need to be determined by the manufacturer and sent to SD1 for approval. The Burlington FMS Stormwater Report will be included in the next Addendum.
4.20. Question: Owner vs Contractor responsibility for site utilities. Conflicting information in specifications.
Answer: Refer to special conditions for requirements.
4.21. Question: Conflicting information regarding PV as alternates between specifications and drawings.
Answer: Alternates 2 and 3 noted on electrical drawings are to be 3 and 4.
4.22. Question: Soils report treating of fatty soils but did not see specification on how this is to be done.
Answer: See revised specification 312000 EARTH Moving.
Addendum 2 Page 5 of 14
4.23. Question: Site / Piers: Can the geotechnical report be provided?
Answer: See attached Geotech Report.
4.24. Question: Can Storm Water report be provided?
Answer: See attached report.
4.25. Question: Paint: 099123-2.5-A Floor sealer spec says "clear water-based acrylic-copolymer-emulsion sealer formulated for oil gas alkali water resistant", I do not know this product exists, can a Sherwin Williams (or similar) product be clarified as the basis of design? Closest product Sherwin Williams has is "wet-look" which is solvent based.
Answer: In addition to the available manufacturers listed add the following as a basis of design:
W.R. MEADOWS VOCOMP-20 water-based, acrylic, concrete curing and sealing compound for fresh concrete.
4.26. Question: Roofing: Spec section for EPDM 075323-5 section 2.2 reads a thickness of 90 mils.
Details 2+6 on A161, indicate 60 mil. Can this be clarified?
Answer: Provide 90 mil thickness per specifications.
4.27. Question: Fencing Per 323113.53-G1 – Lists 9 ga and 6 ga stainless steel for wire ties. (1) Steel Wire Ties are available in 11ga only (as far as I know), not 9ga or 6ga. I don’t think it would be possible for us to use a 6ga wire in steel to tie the fence off. Can this be clarified?
Answer: Steel Wire Ties will need to be a minimum of 6 ga or 9 ga. 11 ga is also acceptable.
4.28. Question: Is fencing required to utilize domestic steel? ASTM F1043 and ASTM F1083 is usually the indicator for Domestic Steel, but is clearly stated. The difference in cost would add ~40% if domestic steel is required
Answer: No, domestic steel is not a requirement.
4.29. Question: The Cantilever Gate is some kind of Track System. Can a manufacturer/make be provided? Currently no vendors want to quote with concerns of warranty (as system is not used in midwest climate, or outdoor applications. More used for airplane hangers or inside warehouses.
Snow, ice and debris will get in the track and cause the gate to either come out of track or be inoperable) Schedule 40 Full Weight Pipe is listed but typically will include weights per LF in the spec. This does not list weights per LF
Answer: Bid cantilever gate as shown.
4.30. Question: Looks like the Sunshades are spelled out on the drawings. May want to include the verbiage about the alternate and materials/finishes in the storefront specifications.
Answer: Sunshade finish is defined on sheet A300. Refer to Exterior Finish Schedule: Basis of Design. Sunshade color shall be: SANDSTONE to match the storefront. Bid as indicated.
Addendum 2 Page 6 of 14
4.31. Question: CS102 Note 3 says to install future conduit at gates and refer to the electrical site drawings but nothing is shown on the electrical site drawings. Please show entire pathway required for each gate including the gate in the alternate.
Answer: Provide empty 2” conduit with pull string, routed from electric room and stubbed up and capped at gate location.
4.32. Question: CS103B appears to show bollards at the alternate fence locations in the existing parking lot but they are not called out. Please confirm
Answer: Correct, the circle symbols on CS103B are bollards
4.33. Question: On the ES001 drawings, it appears the generator and transformer are shown to be installed above the sanitary sewer lines. Please confirm routing of utilities in this area.
Answer: Refer to detail 2 “Enlarged Electrical Site Plan, sheet ES001, shows sanitary line skating the edged of the concrete pad. Contractor is to coordinate exact routing of the line.
4.34. Question: Div 8 Will the wood doors need to be AWI certified and “FSC Pure”?
Answer: Refer to section 081416 FLUSH WOOD DOORS remove all sustainability requirements as follows: delete paragraph 1.2C Sustainable Design Submittals, delete item 1.2D 10, delete paragraph 1.5 Quality Assurance, delete paragraph 2.2 Flush Wood Doors and Frames, General except retain “Quality Standard: In addition to requirements specified, comply with ANSI/WDMA I.S. 1A.”.
4.35. Question: Drawing E701 shows a 1200 amp CT Cabinet. Duke Energy usually installs the
CT’s inside their transformer. Is there a need for the CT Cabinet?
Answer: If Duke installs the CTs in the transformer there is no need for the CT cabinet.
4.36. Question: Drawing E701 has a feeder schedule and key notes that references wire type to be THWN, but General Note P calls for all emergency feeders to be MI Cable. Which note is correct?
THWN for Emergency Feeders or MI Cable?
Answer: All emergency feeders feeding panelboards, transfer switch’s, etc. is required by code to be MI cable
4.37. Question: Page E507 of the plans show the following for the Photovoltaic system System A (part of the hard bid) shows 150 modules (assuming 400W) each = 150x400 is 60kW DC for the base bid.*** Kentucky state law does not allow Interconnections over 45KW DC unless the Cogeneration Application for interconnection. *** Question #1 Is CMTA / and the client expecting us to take this path for interconnect? (see comment below) Per KY state law and associated electric regulations, solar Net Metering offered by Salt River Electric is a 45kW AC maximum. For all installations greater than 45kW, the solar installation is subject to the federal PURPA law and Salt River Electric and East Kentucky Power confirming tariffs. Please utilize the link below to obtain information pertaining to your PURPA qualifying facility. Please complete the online application.
Cogeneration Applicants - Together We Save (togetherwesaveky.com) https://url.us.m.mimecastprotect.com/s/nYnvCPNqNvtonpwT0eI4b?domain=togetherwesaveky.com/
Addendum 2 Page 7 of 14
Answer: Electrical contractor shall coordinate all fees, permits, and forums required to install each size array (Basis of Design, Alternate #3, and Alternate #5) with local utility company and state requirements.
4.38. Question: System B shows (2) 50KW inverters using 228 modules creating 91,200kW DC if the modules are 400W each. – this is fine
Answer: This is acceptable.
4.39. Question: System C shows (1) 50kW inverter for 228 modules – this is an issue – we assume the detail notes #5 and #3 are incorrect and need to be revised. Please provide clarification. ***This change will affect the single line diagram on E701 increasing the number of inverters to (5) and the number of 100A - AC disconnects to (5) also increasing the number of breaker locations needed on the distribution panel
Answer: This change does not affect the one line. Alternate #5 rewires the strings connected to the other three inverters. Refer to PV Riser and Detail on sheet 5/E507.
4.40. Question: Will the engineer / architect / owner consider modifications to module size, manufacturer (wattage per modules) and inverter size, manufacturer (production sizing) to value engineer the alternate bid items for Systems B and C. Both of these modifications will greater reduce the cost of labor, materials needed for the alternate bid items.
Answer: Electrical Contractor shall bid the drawings as designed.
4.41. Question: Hazardous locations in the bay areas what exactly would be the classification of those areas? What materials in those areas would be hazardous?
Answer: As indicated on sheet FX101 the bay areas are classified as: ORDINARY HAZARD. The materials in the area will be dictated by the user. There will be gasoline vapor present along with other POL’s.
4.42. Question: Seismic requirements are not applicable in Burlington area. Our standard application should suffice. Just double checking if there are more requirements for it?
Answer: Seismic requirements are listed in the Design Criteria, Item 8, on sheet S-001.
4.43. Question: Names of flooring in specs does not match flooring names in plans. Specs uses LVT-1, LVT-2, LVT-3, RF-1, RF-2, and CPT-1. Plans uses MMA-1, RF-1, EPX-1, and SC-1.
Answer: Specifications for finishes shall be revised as follows:
1. Section 093013 CERAMIC TILING: at paragraph 2.3 Tile Products delete the text at item B, revise the name of item C to be “Ceramic Tile, CT-2”, and revise the name of item D to be “Ceramic Tile, CT-3”.
2. Section 096519 RESILIENT TILE FLOORING: delete this spec section entirely.
3. Section 096566 RESILIENT ATHLETIC FLOORING: delete paragraph 2.3 (RF-2 is not included).
4. Section 096813 TILE CARPETING: delete this spec section entirely.
5. Note that MMA-1 and EPX-1 are specified in section 099600 HIGH-PERFOMANCE COATINGS.
Addendum 2 Page 8 of 14
4.44. Question: Where is the location of the visual displays (markerboard and tackboard panels)?
Answer: Markerboards shall be as follows: 6 FT wide X 4 FT high, mounted 2’-4” AFF to bottom.
Provide one markerboard at the south wall of Classroom 105. Locate 6’-0” from the southwest corner.
Tackboards shall be as follows: 4 FT wide X 4 FT high, mounted 2’-4” AFF to bottom. Provide one tackboard at the west wall of Breakroom 107. Locate 4’-0” from the northwest corner.
4.45. Question: Work Benches (A571): The finish for these units is not indicated. Can this be clarified as to design intent?
Answer: Provide primer and finish coats as indicated in spec section 099123 INTERIOR PAINTING.
Primer shall conform to paragraph 2.3 E (Water-based Rust-inhibitive Primer). Finish coats shall conform to paragraph 2.4 B (Interior, Latex, Institutional Low Odor/VOC, Semigloss).
4.46. Question: Note 6 on Roof Plan A160 calls for through wall flashing to overflow scupper – reference to elevations. When looking on roof plan and elevations I don’t see scuppers call out on either. Can you advise where these are located if on project?
Answer: Overflow scuppers are shown on sheet A300 BUILDING EXTERIOR ELEVATIONS, on sheet P201 PARTIAL PLAN A – PLUMBING, and sheet P202 PARTIAL PLAN B – PLUMBING (keynote P91).
4.47. Question: Spec Section 075600-1.1 Summary Section A - Cold Applied PMMA/PMA flashings. PMMA Flashings are for BUR and SBS membrane products not EPDM membrane products, is this applicable? Does not seem that a roof assembly with BUR or SBS sheets are on the project
Answer: Delete Specification 075600 PMMA Flashing. Use manufacturer’s standard EPDM flashing details as shown in drawing details.
4.48. Question: Detail 8/A161 calls for Multi-purpose flashing cement. This will eat through the EPDM membrane and should only have Bonding adhesive in this location per manufacturer. Is this referring to flashing cement as bonding adhesive in these locations?
Answer: Use manufacturer’s EPDM compatible water cut-off mastic and membrane bonding adhesives at this location. Do not use an asphaltic based flashing.
4.49. Question: In regards to site access, during the site walkthrough it was indicated from the folks at the walk through that construction traffic was expected to come off Gateway Blvd., across their north lot, through the secured rear lot (wit with a GC supplied temporary fence separating traffic from secured area – they mentioned moving items to within the secure area), and utilizing the drive that exists in the construction area. This would be extremely ideal for the project and also reduce risk of track out / construction traffic on Conrad. If we utilize rear of site, the track out would be knocked off for the most part prior to leaving site. Looking to clarify this and the virtual meeting seemed to not exactly clarify.
Answer: Refer to revised sheet CE101 EPSC Plan West.
Addendum 2 Page 9 of 14
4.50. Question: Provide Specification for the site flagpoles
Answer: Refer to addendum sheet CS508 detail 2.
4.51. Question: 055000 Does not mention the steel work benches and POL tables in the warehouse. Are these Contractor Furnished/Contractor installed. If so, do they get painted?
Answer: As shown on sheets A571 and A572, work benches and POL tables are included (contractor furnished / contractor installed). Provide primer and finish coats as indicated in spec section 099123 INTERIOR PAINTING. Primer shall conform to paragraph 2.3 E (Water-based Rust-inhibitive Primer). Finish coats shall conform to paragraph 2.4 B (Interior, Latex, Institutional Low Odor/VOC, Semigloss).
4.52. Question: The site flammable storage and controlled waste buildings are not shown on the
ESS drawing. Please do so and provide proposed conduit routing for their services.
Answer: The CMTA design documents do not include “ESS” drawings. There is not required access control or security at the flammable storage or controlled waste beyond locks on the doors.
4.53. Question: See below for questions regarding air barrier at the outbuildings and roof parapet detail.
Answer:
At detail 4/A161 provide continuous break metal closure plate.
At detail 1/A500 on backside of insulated parapet wall, provide 2” Rigid Polyiso Insulation and ¾” Fire treated plywood attached to CMU wall with masonry anchors.
4.54. Question: There is an existing retaining wall where the new retaining wall is proposed to be built. Do we demolish the old to build the new? If so, how big is footer and how much goes underneath existing road?
Addendum 2 Page 10 of 14
Answer: The existing retaining wall is not within the limits of the new retaining wall and will not need to be disturbed.
4.55. Question: Please provide specification for the retaining wall in the alternate
Answer: Retaining wall detail is shown on Section 5/S-502. Applicable Specifications shall be 312000, 031000, 032000, and 033000.
4.56. Question: Please provide a specification for 275319 DAS system if required
Answer: Delete specification 275319 DAS system is not required.
4.57. Question: Multiple places on the drawings call out data back boxes to be 4-11/16” by 2-1/8” deep. Specification section 27 05 28 states that back boxes must be 4-11/16” by 3-1/2” deep.
Please clarify.
Answer: Specification Section 27 05 28. Part 2, 2.4, B
a. Minimum 4” inches square by 3-1/2 inches for 1-inch pathways.
b. Minimum 4-11/16 inches square by 3-1/2-inch deep box for pathways 1-1/4 inches and larger.
4.58. Question: Under raceway applications in spec section 26 05 33 it states: “Interior, Concealed in Concrete or Grouted Masonry Walls and Partitions: IMC or GRC.” Does this mean that all conduit stubs in block walls must be IMC or GRC?
Answer: Yes
4.59. Question: Does conduit need to be taken to WAP locations?
Answer: Yes. Refer to detail 6, sheet E503.
4.60. Question: There are multiple details showing data stub ups taken to the tray and bonded.
However, it also says that j-hook paths can be used. Does each conduit need to be run to the cable tray and bonded or can we assume that the cabling can be routed from the stub to the tray via j-hook path?
Answer: All stub ups are to be routed to tray.
4.61. Question: Spec section 26 05 53 states that receptacle cover plates shall be marked with their panel and circuit number(s) with clear, machine printed adhesive labels with black lettering.
Spec section 26 27 26 states that all device wall plates shall have panel and circuit designation engraved in the face. Please clarify if these need to be engraved or just have labels installed.
Answer: All stainless steel plates are to be engraved and it is acceptable for the high impact thermoplastic plates to be provided with the machine printed adhesive labels. Refer to specifications for requirements of plate type locations.
4.62. Question: On drawing E701, the keynotes and riser-feeder schedule call out the use of conduit and THWN wire for all feeders. General note P on E701 states that all emergency feeders
Addendum 2 Page 11 of 14 shall be MI-cable. These are contradictory. Is MI cable required? If so, please clarify the exact feeders that need to be run as MI cable?
Answer: All above ground emergency feeders are to be MI cable.
4.63. Question: I am looking to bid division 27 on this bid for you. I noticed on E001 that they say the terminations for the cabling are OFOI. This is a first for me because usually the cat6 cable is terminated and tested by the installer. Would you be able to verify if this is correct?
Answer: That is correct.
4.64. Question: Please confirm the Contractor is to supply the coffee maker. It seems like an odd request since the owner is purchasing all other kitchen equipment except for the hood.
Answer: As indicated on sheet note 33 (sheet A150) the coffee maker is in contract.
4.65. Question: There is a specification section for visual display boards but I do not see any on the drawings or scheduled anywhere for the sizes
Answer: Markerboards shall be as follows: 6 FT wide X 4 FT high, mounted 2’-4” AFF to bottom.
Provide one markerboard at the south wall of Classroom 105. Locate 6’-0” from the southwest corner. Tackboards shall be as follows: 4 FT wide X 4 FT high, mounted 2’-4” AFF to bottom.
Provide one tackboard at the west wall of Breakroom 107. Locate 4’-0” from the northwest corner.
4.66. Question: There is aluminum sheet shown at the translucent wall panels and garage doors.
I assume it should be by the translucent wall panel installer and match the translucent wall panels but that material is not listed in that specification.
Answer: At detail 1/A751 provide sill pan flashing to match the translucent wall panel framing per specification 076200 SHEET METAL FLASHING AND TRIM.
4.67. Question: The architectural jamb details at the overhead doors/counter door shown steel jambs plates and say to “see structural”. Unless I missed it, I do not see that work detailed on the structural drawings. Also the overhead door details 8” diameter bollards inside and outside of the building but say to refer to civil. These will have to move further from the wall than the 1’ shown so they don’t interfere with the footings. Are the bollards to be painted safety yellow or do they get a yellow Idealshield cover? The site furnishings spec seemed to indicate the bollards are to be galvanized. Please confirm.
Addendum 2 Page 12 of 14
Answer: Jamb plate is shown on Detail 12/S-504. Applicable Specifications shall be 312000, 031000, 032000, and 033000. Bollards shall be shifted so they do not interfere with the footings.
The bollards shall be galvanized standard steel pipe and painted safety yellow. Note that the interior bollards shall be surface mounted per detail 6/S-502.
4.68. Question: On details 1 and 2 on 751, there are angles/plate detailed on the tube steel. The structural drawings make no reference to those angles and plates. See below details. Also, the structural drawings refer you to the lintel schedule but the size of the openings exceeds the scheduled brick opening lintels.
Answer: Refer to revised detail D/S-305, G/S-305, and H/S-305, as well as revised lintel schedule on sheet S-503.
4.69. Question: I have a question from Bridge Crane sub, see below: In order to provide the correct electric bar, can you provide what corrosives that are expected to avoid potential melting?
Answer: There should not be any highly corrosive materials utilized within the work bays. Other maybe some road salts coming off of vehicles.
Addendum 2 Page 13 of 14
4.70. Question: In the fencing specs, it details out the operator for the sliding gates. I think those may be added at a future date but please confirm if we are or are not to include them in the bid.
Answer: Correct, operators for sliding gates are not to be included in this bid.
4.71. Question: In the site north access alternate, there is a double gate shown on the drawings but not called out. Please confirm width of the gate and provide construction details of this gate.
Answer: Refer to addendum sheet SS509, The width of this double swing gate will be 20’.
4.72. Question: We are usually required to bring 120V circuits to the temporary generator hookup for the temporary generator block heater/charger. Does GCC require any 120V circuitry? If so, can you provide us with panel and circuit numbers?
Answer: There is already a weather-proof (WP) receptacle on the design documents, captured adjacent to the generator connection cabinet (GCC).
4.73. Question: Under the Mechanical scope Soil, Waste, Vent, and Domestic Water piping are all listed. These should be listed in a Plumbing scope. Please clarify.
Answer: The mechanical scope specification covers both mechanical and plumbing scope. There is not a dedicated specification outlining plumbing scope.
4.74. Question: The Geo above ground pipe is listed as polyethylene fused pipe please confirm this as the desired product. We would prefer and is normal to switch to Carbon/Copper inside of the building.
Answer: Bid as specified and shown in the construction documents.
4.75. Question: Drawing E505, detail 2, shows that the grounding electrode conductors are to be sized using NEC Table T250.66. The riser on drawing E701 shows that the grounding electrode conductors should be #500 MCM copper. Please advise on which we are supposed to go with.
Answer: Provide per what is shown on sheet E701.
4.76. Question: E701 shows the BMGB is to be installed in a NEMA 3R enclosure. This is not shown on the E505 detail 2. Does BMGB have to be in a NEMA 3R enclosure?
Answer: The BMGB is located in the electrical room, it does not need to be in an enclosure.
4.77. Question: Please clarify the intent of the security camera and access control work. One of our security and access control contractors has raised the concern that no doors are shown to receive access controls and no cameras are shown. They are further confused by the responsibility matrix on E001 seems to indicate that those systems are owner furnished and installed yet we have a full specification. Please clarify this scope of work. At this point, we can’t even provide the wiring called for in the responsibility matrix as we have no rough-in locations.
Addendum 2 Page 14 of 14
Answer: All access controls and security cameras were removed by the Guard. The camera at the front door is specifically provided and connected so that they can see who is at the door and not as a security measure. It is noted in the Systems Responsibility Matrix on sheet E001 that the device, conductors and terminations are to be Owner Furnished Owner Installed (OFOI) and the pathway/backbox is to be Contractor Furnished Contractor Installed (CFCI).
END OF ADDENDUM
PROTECT EXISTING
HELIPAD AND CONC.
APRON.
126.16'
43.02'
S
CO
CO
CO
CO
CO
198.35'76.29'
WASH RACK ACCESS
8.
71.49'
145.34'
.0
0'
6.
.0
0'
4.
.9 1'
12 15 6.
50'
30'
N: 560856.8130 E: 1507246.9474
N: 560875.6132 E: 1507048.7720
N: 560619.1806 E: 1507224.4041
N: 560612.9744 E: 1507289.8252
N: 560583.3867 E: 1507171.6576
N: 560643.5292 E: 1507177.3631
N: 560557.9860 E: 1507284.5944
N: 560521.4214 E: 1507288.8729
N: 560814.7333 E: 1507343.3651
N: 560659.4306 E: 1507328.6321
N: 560824.1738 E: 1507243.8511
N: 560596.8879 E: 1507351.2492
N: 560556.3209 E: 1507302.2155
N: 560671.6922 E: 1507358.3178
N: 560654.2680 E: 1507380.7782
N: 560731.8256 E: 1507372.4455
N: 560753.4380 E: 1507423.6479
R5 5.
R45.00'
R25 .00
R45.00'
R94.75'
R150.00'
R 52.02'
N: 560802.3665 E: 1507467.2429
N: 560837.9621 E: 1507479.3141
N: 560874.4790 E: 1507549.3944
N: 560858.4152 E: 1507510.1716
N: 560845.2521 E: 1507587.2558
R108.00'
N: 560461.4911 E: 1507338.4548
N: 560452.8811 E: 1507361.7481
N: 560699.2555 E: 1507332.3708
MATCHLINE SEE SHEET CS102B
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C S1
B
R175.00'
N: 560597.3615 E: 1507060.4804
CONTRACTOR WORK LIMITS
N: 560787.4164 E: 1507454.9000
9/ 9/
:3
9:
P M
095CABPBR0400
BURLINGTON FMS
2676 CONRAD LANE BURLINGTON, KY 41005
08/20/2024
202211
CD
KP
D
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
08/20/2024
CS101B
SITE PLAN - WEST - NORTH ACCESS ALTERNATIVE
PLAN
NORTH
SCALE:
10' 20'
1"=20'
1. CONTRACTOR SHALL VERIFY LOCATION OF ALL
UTILITIES PRIOR TO CONSTRUCTION OR ANY
EARTHMOVING ACTIVITIES.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. CHAIN LINK SECURITY FENCE, 8 FT HIGH. SEE DETAIL
4/C-503.
2. MANUAL SLIDE GATE, 36 FT WIDE (2 EA.). SEE DETAIL
7/C-503.
3. CONDUIT FOR FUTURE GATE OPERATOR. SEE
ELECTRICAL DRAWINGS
4. DOUBLE SWING GATE, MANUAL, 20 FT WIDE (1 EA.). SEE
DETAIL 8/C-503.
5. FUEL TRUCK CONTAINMENT AREA
6. CONTROLLED WASTE HANDLING (SEE ARCHITECTURAL
PLANS).
7. WASH RACK CONC. SLAB (SEE STRUCTURAL
DRAWINGS).
8. LOADING RAMP (SEE STRUCTURAL DRAWINGS).
9. CONCRETE PAVEMENT SECTION, 8 INCH, SEE DETAIL
12/C-507.
10. STANDARD ASPHALT PAVEMENT SECTION. SEE DETAIL
11/C-507.
11. CONCRETE SIDEWALK 4 INCH, SEE DETAIL 10/C-507.
12. HEAVY DUTY GRAVEL PAVEMENT SECTION, SEE DETAIL
9/C-507.
13. CONC. CURB AND GUTTER, 6 INCH X 24 INCH. SEE
DETAIL 4/C-508.
14. SWING GATE, MANUAL, 4 FT WIDE (1 EA.)
15. DOUBLE SWING BAR GATE WITH LOCKING POSTS (1 EA.).
SEE DETAIL 2/C-504.
16. FLAG POLE (2 EA.). SEE DETAIL 2/C-508.
17. FLAMMABLE MATERIALS STORAGE (SEE
ARCHITECTURAL PLANS).
18. PAVEMENT MARKING, STRIPED PARKING SPACES.
19. BIKE RACK ON 10'X8' CONCRETE PAD (1 EA.). SEE DETAIL
8/C-508.
20. DUMPSTER PAD
21. UNDERGROUND INFILTRATION BASIN. SEE GRADING
PLANS.
22. REMOVE AND REPLACE ASPHALT ROAD SECTION PER
LOCAL STANDARDS, REQUIREMENTS AND
SPECIFICATIONS.
23. REMOVE AND REPLACE 30 INCH MOUNTABLE CONC.
CURB AND GUTTER PER LOCAL STANDARDS,
REQUIREMENTS AND SPECIFICATIONS.
24. GRAVEL MAINTENANCE STRIP.
25. HANDRAIL.
26. STOP SIGN. SEE DETAIL 1/C-504.
27. STOP BAR PAVEMENT MARKING. 2' WIDTH.
28. HEAVY DUTY ASPHALT SECTION. SEE DETAIL 1/C-509B.
29. BOLLARD. SEE DETAIL 1/C-505.
30. DETECTABLE WARNING MATS. SEE DETAIL 6/CS-508.
31. RETAINING WALL. SEE GRADING SHEETS AND
STRUCTURAL DETAILS.
32. VEHICLE GUARDRAIL. SEE DETAIL 7/C-509 AND
STRUCTURAL DETAILS.
33. FISHTAIL STYLE GUARDRAIL END TREATMENT.
34. 20' WIDE DOUBLE SWING GATE. SEE DETAIL 8/C-509.
PROPOSED LEGEND
CONC. PVMT.
BITUMINOUS PVMT.
AGG. PVMT.
CONC. WALK
CURB & GUTTER
VALVE
SANITARY MANHOLE
STORM MANHOLE
FIRE HYDRANT
INLET/CATCHBASIN
VALVE IN GATE WELL
SANITARY CLEANOUT
OIL/WATER SEPARATOROW
D
CB
CULVERT END SECTION
CO
S
W
CONTRACTOR WORK LIMITS
85'-0" BUILDING STANDOFF (ATFP)
CHAIN LINK SECURITY FENCE
01 ADDENDUM 03 9/9/2024
CONRAD LN.
AN
D
O
VE
R C
T.
2676 CONRAD LN.
FDC
FHWV
CONC CONC
CONC
ASPHASPH
PUBLIC ROADWAY
MH (BELL SYSTEM)
T.R. 833.64
GRASS
BOLLARDS
SANITARY MH
T.R. 844.38 F.L.
CONC
PAVERS
CONC
WINDSOCK
ASPH
CONC CURB
6' CHAIN LINK FENCE
CONC CURB
6' CHAIN LINK FENCE
SPILL PROTECTION
UNDERGROUND COMM
MARKED AND LOCATED
±1 7.
5'
17' 28.3'
44'
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C S1
B
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C S1
B
ENSURE GATE DOES
NOT EXTEND PAST FENCE
TURN WHEN FULLY OPENED
329/
9/
:4 1:
P
M
095CABPBR0400
BURLINGTON FMS
2676 CONRAD LANE BURLINGTON, KY 41005
08/20/2024
202211
CD
KP
D
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
08/20/2024
CS103B
SITE PLAN SCHEMATIC - EAST - NORTH ACCESS ALTERNATE
PLAN
NORTH
SCALE:
20' 40'
1'' = 40'
1. CONTRACTOR SHALL VERIFY LOCATION OF ALL
UTILITIES PRIOR TO CONSTRUCTION OR ANY
EARTHMOVING ACTIVITIES.
GENERAL SHEET NOTES
SHEET KEYNOTES
PROPOSED LEGEND
CONC. PVMT.
BITUMINOUS PVMT.
AGG. PVMT.
CONC. WALK
CURB & GUTTER
VALVE
SANITARY MANHOLE
STORM MANHOLE
FIRE HYDRANT
INLET/CATCHBASIN
VALVE IN GATE WELL
SANITARY CLEANOUT
OIL/WATER SEPARATOROW
D
CB
CULVERT END SECTION
CO
S
W
CONTRACTOR WORK LIMITS
85'-0" BUILDING STANDOFF (ATFP)
CHAIN LINK SECURITY FENCE
1. CHAIN LINK SECURITY FENCE, 8 FT HIGH. SEE DETAIL
4/C-503.
2. MANUAL SLIDE GATE, 36 FT WIDE (2 EA.). SEE DETAIL
7/C-503.
3. CONDUIT FOR FUTURE GATE OPERATOR. SEE
ELECTRICAL DRAWINGS.
4. DOUBLE SWING GATE, MANUAL, 20 FT WIDE (1 EA.). SEE
DETAIL 8/C-503.
5. FUEL TRUCK CONTAINMENT AREA
6. CONTROLLED WASTE HANDLING (SEE ARCHITECTURAL
PLANS).
7. WASH RACK CONC. SLAB (SEE STRUCTURAL
DRAWINGS).
8. LOADING RAMP (SEE STRUCTURAL DRAWINGS).
9. CONCRETE PAVEMENT SECTION, 8 INCH, SEE DETAIL
12/C-507.
10. STANDARD ASPHALT PAVEMENT SECTION. SEE DETAIL
11/C-507.
11. CONCRETE SIDEWALK 4 INCH, SEE DETAIL 10/C-507.
12. HEAVY DUTY GRAVEL PAVEMENT SECTION, SEE DETAIL
9/C-507.
13. CONC. CURB AND GUTTER, 6 INCH X 24 INCH. SEE
DETAIL 4/C-508.
14. SWING GATE, MANUAL, 4 FT WIDE (1 EA.)
15. DOUBLE SWING BAR GATE WITH LOCKING POSTS (1 EA.).
SEE DETAIL 2/C-504.
16. FLAG POLE (2 EA.). SEE DETAIL 2/C-508.
17. FLAMMABLE MATERIALS STORAGE (SEE
ARCHITECTURAL PLANS).
18. PAVEMENT MARKING, STRIPED PARKING SPACES.
19. BIKE RACK ON 10'X8' CONCRETE PAD (1 EA.). SEE DETAIL
8/C-508.
20. DUMPSTER PAD
21. UNDERGROUND INFILTRATION BASIN. SEE GRADING
PLANS.
22. REMOVE AND REPLACE ASPHALT ROAD SECTION PER
LOCAL STANDARDS, REQUIREMENTS AND
SPECIFICATIONS.
23. REMOVE AND REPLACE 30 INCH MOUNTABLE CONC.
CURB AND GUTTER PER LOCAL STANDARDS,
REQUIREMENTS AND SPECIFICATIONS.
24. GRAVEL MAINTENANCE STRIP.
25. HANDRAIL.
26. STOP SIGN. SEE DETAIL 1/C-504.
27. STOP BAR PAVEMENT MARKING. 2' WIDTH.
28. HEAVY DUTY ASPHALT SECTION. SEE DETAIL 1/C-509B.
29. BOLLARD. SEE DETAIL 1/C-505.
30. DETECTABLE WARNING MATS. SEE DETAIL 6/CS-508.
31. RETAINING WALL. SEE GRADING SHEETS AND
STRUCTURAL DETAILS.
32. VEHICLE GUARDRAIL. SEE DETAIL 7/C-509 AND
STRUCTURAL DETAILS.
33. FISHTAIL STYLE GUARDRAIL END TREATMENT.
34. 20' WIDE DOUBLE SWING GATE. SEE DETAIL 8/C-509.
01 ADDENDUM 03 9/9/2024
2'
4"
INTERNATIONAL
BLUE PAINTED
STRIPES
INTERNATIONAL
BLUE PAINTED
SYMBOL
HANDICAP PARKING
SIGN REFER TO
LAYOUT PLAN FOR
ORIENTATION
CENTER W/ SPACE
EQ.
SPACING
EQ.
SPACING
4"
TYP.
4'
6"
6"
6"
6"
6"
5"
9' 9'
45°
2'
7' 4'
-6
EDGE OF
PAVEMENT OR
PARKING
STALL
4" INTERNATIONAL
BLUE PAINTED
STRIPES
30' FLAG POLE
SPUN ALUMINUM
FLASH COLLAR
WATER PROOF
COMPOUND, 2" DEEP
(4)HARDWOOD WEDGES,
(REMOVE AFTER ALIGNMENT)
CONCRETE
WALK
2'-6"
4'
8"
2'
1' 6"
3' -6
NOTES:
1. FLAG POLE TO BE: CONCORD INDUSTRIES
INC. FROM THEIR CONTINENTAL LINE OR
APPROVED EQUIVALENT
CONCORD INDUSTRIES INC.
P.O. BOX 2449
ADDISON, TX 75001
PHONE: 800-527-3902
FAX: 800-826-5770
2. DESIGN SPECIFICATIONS:
2.1. 30 FT MOUNTING HEIGHT
2.2. 6 IN BUTT DIAMETER
2.3. 0.188 INCH WALL
2.4. ANODIZED CLEAR FINISH
2.5. SATIN BALL TRUCK
2.6. CLEAT SECURITY, 4.5 FT IN HEIGHT
2.7. SPUN ALUMINUM COLLAR
STEEL
GROUND
SPIKE
COMPACTED
SUBGRADE
STEEL REST
PLATE
16 GA. CORRUGATED
GALVANIZED STEEL SLEEVE
STEEL CENTERING WEDGES
(WELDED INSIDE)
DRY SCREENED SAND
300 PSI CONCRETE
FOOTING
MORTAR JOINT TO BE SPACED
PER MANUFACTURERS
RECOMMENDATIONS
WAUSAU TILE 12X12X2 ADA
PAVER OR EQUIVALENT
CONCRETE HEADER CURB
FLUSH W/ PAVEMENT AT ADA
RAMP.
ASPHALT
SUBGRADE COMPACTED TO 95%
STANDARD PROCTOR DENSITY
6"X6" #10/10
WELDED WIRE
MESH
LATEX THIN-SET MORTAR BED WITH SPREAD
PER MANUFACTURES RECOMMENDATIONS
WAUSAU TILE
(800) 288-8728
WWW.WAUSAUTILE.COM
4"
HANDICAP PARKING SPACE1 SCALE: NONE
FLAGPOLE2 SCALE: NONE
TACTILE WARNING PAVERS3 SCALE: NONE
CONCRETE WALK: MEDIUM BROOM
FINISH IN DIRECTION INDICATED
4" TROWELED EDGE,TYP.
CONTROL JTS. AS INDICATED ON
PLANS
1/2" TOOLED EXPANSION JOINT
W/ SMOOTH FINISH AT 30' O.C.
MAX OR AS INDICATED ON
PLANS
PLAN
4"
VARIES
SEE PLANS 4"
C
2" 2"
4 CONCRETE WALK:
3500 PSI
COMPACTED
SUBGRADE
6"X6" #10/10
WELDED WIRE
MESH
4" DGA COMPACTED TO
95% STANDARD
PROCTOR DENSITY
SECTION
4" CONCRETE PAVEMENT5 SCALE: NONE
SLOPE 1:12 MAX
6' MIN TAPERED CURB
1:12 MIN SLOPE
TYP EACH SIDE OF RAMP
VARIES
36" MIN.
EXPANSION JOINT
PINNING TYP
EQUALLY SPACED
VARIES
VARIES
SCORING NOT
REQUIRED
VARIES
MINIMUM 6'
ROAD OR
SIDEWALK
SEPARATE CURB SHOWN;
MAY BE MONOLITHIC CURB
24" MIN
TRUNCATED
DOME
ADA ACCESSIBLE CURB RAMP DETAIL6 SCALE: NONE
"VAN ACCESSIBLE"
SIGN: MUTCD#HC-23 (12"X6")
1 1/2" SQUARE GALV. STEEL
POST: PAINTED BLACK
FINISH GRADE SLOPE TO
DRAIN AWAY FROM POST
CONC. FOOTING
2500 PSI, MIN.
STAINLESS STEEL
HARDWARE, TYP. ALL SIGNS
12" X 18" REFLECTIVE ALUMINUM
SNR78NP5X, PEACHTREE BUSINESS
PRODUCTS - GREEN TEXT ON WHITE
BACKGROUND W/ BLUE HANDICAP SIGN
POST CAP - PRIME
& PAINT, TYP. ALL
POSTSPOST CAP - PRIME &
PAINT, TYP. ALL POSTS
24" X 24" REFLECTIVE ALUMINUM STOP
SIGN PEACHTREE BUSINESS PRODUCTS
P.O. BOX 13290 ATLANTA, GA 30324
MODEL # SNR1124-P
STAINLESS STEEL
HARDWATE, TYP. ALL
SIGNS
1 1/2" SQUARE
GALV. STEEL POST:
PAINTED BLACK
FINISH GRADE
SLOPE TO DRAIN
AWAY FROM POST
CONC. FOOTING
2500 PSI, MIN.
NOTE:
ALL SIGNAGE SHALL BE IN
CONFORMANCE WITH THE MANUAL
OF UNIFORM TRAFFIC CONTROL
DEVICES.
NOTE:
ALL SIGNAGE SHALL BE IN
CONFORMANCE WITH THE MANUAL
OF UNIFORM TRAFFIC CONTROL
DEVICES.
6' -0
3'
-0
6"
12"
7' -0
3'
-0
6"
12"
SIGNAGE7 SCALE: NONE
CURB AND GUTTER4 SCALE: NONE
2"R 2% MIN. SLOPE1"
R 2"R
2% MIN. SLOPE
1" R
6"
8" 6"
7" 2'-0"
1"
6" 8" 8"
6"
6"
8"
2'-0"
7" 1"
6" COMPACTED
SAND BASE 6" COMPACTED
SAND BASE
STANDARD SECTION SPILL-OUT SECTION
9'-4 1/2"
1/ 4"
2" C
LR
4" 2'
-8
12"
COMPACTED SUBGRADE
CONC. FOOTING @
3500 PSI
SILICONE AROUND
BASE
BIKE RACK BY DUMOR, INC. MODEL #
125-50 OR EQUAL.
(800)598-4018: EMBED PER MANUF. REC.
1/2 " EXP. JT
ELEVATION SECTION
BIKE RACK8 SCALE: NONE
10' x 8'
CONCRETE
PAD
DOWNSPOUT TO ROOF
SS SUPPORT STRAP-ANCHOR TO
WALL WITH EXPANSION SHIELDS
CAST IRON CLEANOUT "T" BRANCH
WITH THREADED PLUG
GRADE
PVC FITTING
PVC FITTING
SLOPE
6" PVC
PROVIDE ISOLATION JOINT AROUND
PIPING IF PIPE PENETRATION IS
LOCATED IN CONCRETE PAVEMENT.
EXTERIOR DOWNSPOUT SHOE9 SCALE: NONE
DOWNSPOUT TRANSITION BOOT
HEIGHT AND DIAMETER
DIRECTION
OF RAMP
50% TO 65% OF
BASE DIAMETER
0.9" MIN.
1.4" MAX.
0.
2"
1.6" MIN.
2.4" MAX.
1.
6"
M
IN
2.
4" M
AX
0.9" MIN.
1.4" MAX.
1.
6"
M
IN
2.
4" M
AX
2.4"
MAX.
1.6"
MIN.
0.9" MIN.
1.4" MAX.
SQUARE PATTERN,
PARALLEL ALIGNMENT
RADIAL ALIGNMENT
DETECTABLE WARNINGS NOTES:
1. GENERAL: DETECTABLE WARNINGS ARE A DISTINCTIVE SURFACE PATTERN OF
TRUNCATED DOMES WHICH ARE DETECTABLE BY CANE OR UNDERFOOT TO ALERT
PEOPLE WITH VISION IMPAIRMENTS OF THEIR APPROACH TO STREETS AND
HAZARDOUS DROP-OFFS.
2. PLACEMENT: DETECTABLE WARNINGS ARE TO BE INSTALLED AT ANY LOCATION WHERE
PEDESTRIANS MIGHT CROSS PATHS WITH VEHICULAR TRAFFIC LANES, SUCH AS THE
BASE OF CURB RAMPS OR AT BLENDED CURBS. A 24" STRIP OF DOMES IS
TO BE INSTALLED FOR THE FULL WIDTH OF THE RAMP OR WALK. TYPICAL STREET
CORNER PLACEMENT LOCATIONS ARE SHOWN ON SHEET CS102.
3. SOME DETECTABLE WARNING PRODUCTS REQUIRE A CONCRETE BORDER FOR PROPER
INSTALLATION. THE CONCRETE BORDER SHOULD NOT EXCEED 2". WHERE THE BACK OF
CURB EDGE IS TOOLED TO PROVIDE A RADIUS, THE BORDER DIMENSION SHOULD BE
MEASURED FROM THE END OF THE RADIUS.
4. THE DEPTH OF CONCRETE UNDERNEATH DETECTABLE WARNING PRODUCTS SHALL BE
A MINIMUM OF 4". SEE DETAIL A.
5. ALIGNMENT: TRUNCATED DOMES SHOULD BE ALIGNED WITH THE PRIMARY DIRECTION
OF THE RAMP AS SHOWN ON THE DETECTABLE WARNING ALIGNMENT DETAIL TO
DIRECT PEDESTRIANS TOWARD THE LANDING. NORMALLY THE DETECTABLE WARNINGS
SHOULD BE FLUSH WITH THE BACK OF THE CURB, BUT FOR SKEWED CONDITIONS SEE
DETECTABLE WARNING ALIGNMENT DETAIL. FOR NON-STANDARD LAYOUTS,
DETECTABLE WARNING MATERIALS MAY HAVE TO BE MITERED AND PLACED
SEGMENTALLY.
6. PRODUCTS & COLORS: COLOR OF THE DETECTABLE WARNINGS SHOULD BE SAFETY YELLOW.
INSTALL PRODUCTS AS PER MANUFACTURER'S PRINTED INSTRUCTIONS.
TRUNCATED DOMES DETAILS10 SCALE: NONE
9/ 9/
:3
5:
P M
095CABPBR0400
BURLINGTON FMS
2676 CONRAD LANE BURLINGTON, KY 41005
08/20/2024
202211
CD
KP
D
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
08/20/2024
CS508
CIVIL DETAILS
01 ADDENDUM 03 9/9/2024
NOTES:
1. ASPHALT SURFACE AND BINDER COURSE SHALL BE IN
ACCORDANCE WITH KYTC SPECIFICATION SECTION 400.
2. CRUSHED STONE BASE COURSE SHALL BE IN ACCORDANCE
WITH KYTC STANDARD SPECIFICATIONS, TYPE A, CLASS A,
GRADING D, SECTION 400.
3. GEOTEXTILE SHALL BE KYTC TYPE IV (STABILIZATION) IN
ACCORDANCE WITH KYTC STANDARD SPECIFICATIONS.
4. COMPACT SUBGRADE TO AT LEAST 95% OF MAX. DRY
DENSITY PER STD. PROCTOR METHOD (ASTM D 698).
CRUSHED STONE BASE COURSE
COMPACTED SUBGRADE
GEOTEXTILE
6"
4" CLASS 3 ASPHALT BINDER COURSE
1.5" CLASS 2 ASPHALT SURFACE COURSE
HEAVY DUTY ASPHALT PAVEMENT SECTION1 SCALE: NONE
TOP OF ROCK SPILLWAY: EL. 852
ROCK SPILLWAY TO BE 5' WIDE
CONSTRUCTION SAND
CLEAN WASHED NO. 3 STONE
AMENDED SOIL MIX
6" 6"
2' -0
1'
6" PERFORATED PVC
OBSERVATION WELL
WITH PVC CAP. SEE
DETAIL 3, THIS SHEET
8" MONITORING WELL MANHOLE
WITH WATER-TIGHT BOLT DOWN LID.
20 GAUGE GALVANIZED STEEL SKIRT.
PAINTED CAST IRON LID AND RIM.
MEETS AASHTO H20 WHEEL LOADING. STAILESS STEEL BOLD.
NON-WOVEN FILTER FABRIC
UNCOMPACTED EARTH
NOTES:
1. PVC PIPE SHALL HAVE 14" HOLES AT 0, 90, 180, and 270 DEGREES EVERY 3
INCHES WITH A SCREW ON CAP.
2. LID SHALL BE CAST IRON BOLT DOWN LID WITH STAINLESS STEEL BOLTS
AND GALVANIZED STEEL SKIRT. CAST IN IDENTIFICATION TRIANGLE AND
"OBSERVATION WELL"
8"
3' -6
"6" PERF.
PVC PIPE
VEGETATED GRASS SURFACE.
REFER TO PLANTING SEED
SPECIFICATION
BIORETENTION BASIN2 SCALE: NONE
OBSERVATION WELL3 SCALE: NONE
6" DIA.
-3
/4
4' -0
" M
IN
5- 1/
8"
12" DIA.
SHUT
TO BUILDING
FIELD ADJUSTMENT INSTRUCTIONS
1. REMOVE THE BODY FROM THE TOP OF THE POST INDICATOR ASSEMBLY.
2. CUT THE REQUIRED LENGTH OFF THE BOTTOM OF THE STANDPIPE FOR THE
GROUND LINE TO MATCH UP WITH STANDPIPE GROUND LINE MARK.
3. SET THE "OPEN" AND "SHUT" TARGETS FOR THE APPROPRIATE VALVE SIZE.
4. RE-ATTACH THE BODY TO THE TOP OF THE INDICATOR POST ASSEMBLY.
36" ROUND CONCRETE
COLLAR, 3,500 PSI
6"
1"
PIV INDICATOR POST
SHALL INCLUDE LOCK.
USER TO KEEP IN
LOCKED "OPEN"
POSITION
1¼" SQ.
BODY
STANDPIPE
(PAINTED RED)
GROUND LINE
STANDPIPE
(PAINTED)
WATER - POST INDICATOR VALVE (PIV)4 SCALE: NONE
S A
N
I T A R Y S E W E
R
NOTE:
1. COVER TO BE "SELF-SEALING" UNLESS INDICATED TO BE A GASKETED,
WATER-TIGHT COVER ON THE DRAWINGS. WATER-TIGHT COVER FRAMES
SHALL BE BOLTED TO THE TOP OF THE CONCRETE STRUCTURE.
SCALE: NONE
SANITARY MANHOLE COVER - STANDARD5
(2) CLOSED PICKHOLES
1 1/2" (38mm) LETTERS
(RECESSED FLUSH)
STANDARD
MANHOLE
RING &
COVER
COMBINATION
AIR/VACUUM VALVE
FLANGED
GATE VALVE
AIR VALVE
PRESSURE
MODEL
FLANGED
REDUCER
(IF
NEEDED)
MJ x FLG TEE WITH
BRANCH ≥ 12 THE RUN
DIAMETER
FLAT TOP MANHOLE
(RING MAY BE CAST INTO
TOP)
CONCRETE
SUPPORT
NEOPRENE
WATER STOP
MIN. 10" DIA. SUMP
PRECAST MANHOLE
SECTION (ASTM C-478),
DESIGNED FOR AASHTO
H-20 LOADING
MASTIC JOINT
MATERIAL OR
APPROVED EQUAL
CASTING TO SIT ON
MASTIC JOINT
MATERIAL OR
APPROVED EQUAL
NOTES:
1. ALL LIFT HOLES AND JOINTS SHALL BE MORTARED BOTH INSIDE AND OUTSIDE.
2. NO STEPS PERMITTED.
3. ALL PLUMBING MATERIALS TO BE NON-CORROSIVE, ALL FITTINGS SHALL BE STAINLESS STEEL
4. ISOLATION GATE VALVE TO BE SAME SIZE AS AIR VALVE.
5. ARV MANHOLE SHALL BE PROVIDED WITHOUT STEPS.
6. RESILIENT CONNECTORS OR BOOTS MEETING ASTM C923 SHALL BE USED AT THE MANHOLE AND PIPE
INTERFACE.
7. MANHOLES DEEPER THAN 12 FEET REQUIRE AN EXTENDED BASE.
COMBINATION (HIGH POINT) AIR VALVE DETAIL
SCALE: NONE6
IN-LINE VALVE DETAIL
LEAF
F
EN
C E
FA
BR
IC
1'
-0
GATE OPENING
FENCE FABRIC (TYP.)
DIRECTION GATE SWING (TYP.)
CHAIN LINK
FABRIC
LINE POST
GATE FRAME
3/8"Ø
TRUSS
LATCH ASSEMBLY
TRUSS ROD (TYP.)
LINE POST
GRADE LINE
GATE FRAME
PLAN
ELEVATION
DROP ROD
2'-10" MIN. FOR POSTS 4" O. D. & LESS
CHAIN-LINK
FABRIC
TOP TENSION WIRE OR
BOTTOM TENSION
3 HORIZONTAL STRANDS
OF BARBED WIRE
3 STRANDS OF BARBED
WIRE (TYP.)
6 STRANDS OF BARBED
WIRE (TYP.)
6 STRANDS OF BARBED
WIRE (TYP.)
16" 0 MIN. FOR GATE POSTS 4" O. D. & LESS
BRACE RAIL (TYP.)
RAIL AS SPECIFIED (TYP.)
HINGES (TYP.)
WIRE (TYP.)
BRACE RAIL (TYP.)
2" M
AX
RODS (TYP.)
DOUBLE SWING GATE 8 SCALE: NONE
VEHICLE GUARDRAIL7 SCALE: NONE
9/ 9/
:5
6:
P M
095CABPBR0400
BURLINGTON FMS
2676 CONRAD LANE BURLINGTON, KY 41005
08/20/2024
202211
CD
KP
D
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
08/20/2024
CS509
OPTION B - CIVIL DETAILS
NA
NA
01 ADDENDUM 03 9/9/2024
BAR TYPE 1 - CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN Db, CLEAR COVER NOT LESS THAN Db, AND STIRRUPS OR TIES THROUGHOUT Ld NOT LESS THAN CODE MINIMUM
OR
CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN 2*Db AND CLEAR COVER NOT LESS THAN Db.
BAR TYPE 2 - TOP BARS WITH MORE THAN 12" OF FRESH CONCRETE CAST BELOW AND OTHER CASES
STRAIGHT BAR HOOK BAR MIN. LAP LENGTH
LAP LENGTH
LE
N
G T
H
LENGTH
LEG
E M
B E
D
CTR. TO CTR. SPACING
OF SPLICED BARS TO
NOT EXCEED 1/5 MIN.
LAP LENGTH OR 6"
WHICHEVER IS LESS
TENSION DEVELOPMENT / LAP SPLICE SCHEDULE (UNCOATED BARS)
DEVELOPMENT / LAP SPLICE LENGTH IN CONCRETE (f'c = 4500 PSI)
BAR
SIZE
DEVELOPMENT LENGTH (IN) CLASS 'B' LAP SPLICE LENGTH (IN)
BAR TYPE 1 BAR TYPE 1BAR…