addendum no 3.pdf
PDF 2 MB Posted
- Solicitation number
- RFB-785-2400000313-4
- Issued by
- Fayette County, Lexington-Fayette Urban County, Kentucky
About this file
This document is an addendum to an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services Division of Engineering and Contract Administration for the Renovate International Museum of the Horse Bid Pack 1 project at the Kentucky Horse Park in Lexington, Kentucky. The addendum provides revisions and updates to the mechanical, plumbing, and electrical drawings, including the relocation of existing ductwork and equipment, the rerouting of condensate and roof drainage lines, and adjustments to the HVAC and plumbing systems on the first and second floors. The bid due date is not specified, but the project is expected to commence in 2024.
The addendum does not provide any details on pricing, set asides, incumbent contractors, funding sources, or other commercial terms. It focuses solely on the technical changes to the construction drawings and specifications required for the renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-146-24
FOR: Renovate International Museum of the Horse Bid Pack 1 Kentucky Horse Park Lexington, Kentucky
DATE: January 18, 2024
RFP-785-2400000313
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-146-24 For: Renovate International Museum of the Horse Bid Pack 1 Kentucky Horse Park Lexington, Kentucky
Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration
Renovate International Museum of the Horse BP-1 Kentucky Horse Park Lexington, KY
EOP Architects 201 W. Short Street Suite 700 Lexington, KY 40507 859.231.7538 fax 859.255.4380 www.eopa.com
Addendum 3
Date: January 18, 2024
Addendum 3 Items:
Mechanical Addenda Items (M):
Drawings:
M110 – FIRST FLOOR MECHANICAL DEMOLITION PLAN
Relocation of existing duct heater, duct, and registers.
M201 – BASEMENT PLUMBING PLAN
Existing floor drain to remain.
M210 – FIRST FLOOR PLUMBING PLAN
Existing floor drain & piping above ceiling to remain.
M410 – FIRST FLOOR HVAC PLAN
Relocation of existing duct heater, duct, and registers.
M420 – SECOND FLOOR HVAC PLAN
Locations of duct mounted humidifiers and associated plumbing connections.
Specifications:
Not applicable.
Electrical Addenda Items (E):
Drawings:
E110 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN
Show existing security devices to be removed/reinstalled.
E310 - FIRST FLOOR POWER AND TECHNOLOGY PLAN
Show existing security devices to be removed/reinstalled.
E320 - SECOND FLOOR POWER AND TECHNOLOGY PLAN
Add power for trap primer.
End of Addendum
EX. 4"
V UP
EX.
FD
EX. 4"
V UP
EX. 2"
OR
EX.
WC
EX.
SINK
EX.
LAV
M420
- INDICATES NO WORK IN THIS AREA
1/8" = 1'-0"M110
1 FIRST FLOOR MECHANICAL DEMOLITION PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
C E N ENFO
SE
ENOIS AL
GN
I
E
AT
P R
S
T K
E
GREG W.
KRAESZIG
L I S
D RE
Y
EFO K
C
TN
U
24762
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:5
:1
A
M
M110
FIRST FLOOR MECHANICAL DEMOLITION PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
GWK
MEW
2023/12/15
RTA
KEY NOTES:
1 EXISTING 4" VENT STACK TO REMAIN.
2 EXISTING FLOOR DRAIN TO REMAIN.
3 REMOVE EXISTING PLUMBING FIXTURE AND ACCESSORIES. FIELD VERIFY AND TRACE EXISTING
ASSOCIATED SANITARY / WASTE, VENT AND/OR DOMESTIC WATER PIPING BACK TO EXISTING MAINS, REMOVE EXISTING PIPING BACK TO MAINS AND CAP PIPING AS REQUIRED.
4 REROUTE EXISTING CONDENSATE LINE DRAINING TO EXISTING 2" OPEN RECEPTACLE TO MOP BASIN
ON LOWER LEVEL. SEE SHEET M201.
5 CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC COLD WATER CONNECTIONS IN THIS ROOM AND
MAINTAIN EXISTING CONNECTIONS FOR REMAINING FIXTURES.
6 REMOVE EXISTING DUCT HEATER AND REINSTALL AS SHOWN ON NEW WORK PLANS. INCLUDE
DISCONNECTING ALL UTILITIES AND APPURTENANCES.
7 DISCONNECT DUCTWORK AS NECESSARY TO MOVE APPROXIMATELY 8-FT VERTICALLY ABOVE NEW
CEILING. SEE NEW WORK PLANS. CONTRACTOR MAY RE-USE EXISTING DUCT.
8 REMOVE AND REINSTALL SUPPLY DIFFUSER AND RETURN REGISTER AS NECESSARY FOR NEW
CEILING.
1 Addendum #3 01/18/24
(E)1 1/2" DHW
(E)3" DCW
(E)3/4" DHWR
4" SAN
4" SAN
4" SAN
PCO
EX.
4" V
(E)4" SAN
(E)4" SAN
(E)3/4" DCW
(E)3/4" DCW
UP TO
EX. WH
CAP
CAP
CAP
CAP
4" S
A N
4" S
A N
3/4" DHW
2" DCW
CD
CD
6" R
W L
(E )1
/4
D
C W
(E )3
/4
D H
W
(E )1
/2
D H
W R
- INDICATES NO WORK IN THIS AREA
1/8" = 1'-0"M201
1 BASEMENT PLUMBING PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
C E N ENFO
SE
ENOIS AL
GN
I
E
AT
P R
S
T K
E
GREG W.
KRAESZIG
L I S
D RE
Y
EFO K
C
TN
U
24762
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:5
:1
A
M
M201
BASEMENT PLUMBING PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
GWK
EDW
2023/12/15
RTA
KEY NOTES:
1 CONNECT TO EXISTING COLD WATER LINE AT THIS POINT.
2 CONNECT TO EXISTING HOT WATER LINE AT THIS POINT.
3 3/4" DOMESTIC COLD WATER LINE UP.
4 2" DOMESTIC COLD WATER LINE UP.
5 3/4" DOMESTIC HOT WATER LINE UP.
6 PIPING ABOVE BASEMENT CEILING.
7 FIELD VERIFY EXACT LOCATION OF EXISTING 4" SANITARY / WASTE STACK. CONNECT NEW 4" WASTE
FROM NEW RESTROOMS 103A AND 103B TO EXISTING 4" WASTE LINE DOWN AS REQUIRED.
8 REROUTED CONDENSATE LINE DOWN FROM ABOVE.
9 ROUTE CONDENSATE LINE TO JANITOR'S CLOSET AND DRAIN VIA AIR GAP TO EXISTING MOP BASIN.
10 REROUTED 6" ROOF LEADER DOWN FROM ABOVE.
11 FIELD VERIFY EXACT LOCATION OF EXISTING ROOF LEADER PIPING. RECONNECT REROUTED ROOF
LEADER TO EXISTING ROOF LEADER PIPING ABOVE BASEMENT CEILING AS REQUIRED.
12 EXISTING FLOOR DRAIN AND ASSOCIATED SANITARY / WASTE PIPING TO REMAIN.
HCR-1
M610
HCR-3
M610
WVR-1
M600
WVR-1
M600
CLASSROOM
C102
EXIST.
STORAGE
C102A
EXIST.
STORAGE
C102B
WC-1
WC-1 WC-1
U-1 L-1 L-1
L-1 L-1
EWC-1
FD-1
FD-1
HB-1
WC-1A
WHA-200
WC-1A
HB-1
4" V
4" V
EX. 4" V
UP & DN
EX.
FD
EX.
4" V
WOMEN
103B
FOUNTAINS
103MEN
103A
MAIN LOBBY
L100
LOBBY
L104
STORAGE
A104G.1
BREAKRM
A104F
STORAGE
A104E.1
VESTIBULE #2
V100
VESTIBULE #1
V101
CAP
WHA-200
SEE ENLARGED PLAN,
THIS SHEET.
CD
6" R
W L
SEE ENLARGED PLUMBING
PLAN, SHEET M420.
- INDICATES NO WORK IN THIS AREA
2" DCW
4" V
2" DCW
3/4" DCW
2" DCW
L-1 L-1
L-1 L-1
HB-1
WC-1A
WC-1 WC-1
WC-1
U-1
EWC-1
FD-1
FD-1
4" V
HB-1
10 9
WHA-200
WC-1A
MEN
103A
WOMEN
103B6" R
W L
1/8" = 1'-0"M210
1 FIRST FLOOR PLUMBING PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
C E N ENFO
SE
ENOIS AL
GN
I
E
AT
P R
S
T K
E
GREG W.
KRAESZIG
L I S
D RE
Y
EFO K
C
TN
U
24762
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:5
:2
A
M
M210
FIRST FLOOR PLUMBING PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
GWK
EDW
2023/12/15
RTA
KEY NOTES:
1 CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF EXISTING 6" ROOF LEADER DOWN FROM ABOVE. REROUTE EXISTING ROOF LEADER AS INDICATED AND RECONNECT TO EXISTING ROOF LEADAER PIPING ABOVE BASEMENT CEILING.
2 EXISTING CONDENSATE LINE UP AND DOWN TO REMAIN.
3 EXISTING DOMESTIC COLD WATER LINE UP AND DOWN TO REMAIN.
4 FIELD VERIFY EXACT LOCATION OF EXISTING 4" VENT STACK. CONNECT NEW 4" VENT PIPING TO EXISTING ABOVE FIRST
FLOOR CEILING AS REQUIRED.
5 CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC COLD WATER CONNECTIONS IN THIS ROOM AND MAINTAIN EXISTING
CONNECTIONS FOR REMAINING FIXTURES.
6 PIPING ABOVE CEILING.
7 PIPING IN CHASE.
8 2" DOMESTIC COLD WATER PIPING UP FROM BELOW.
9 3/4" DOMESTIC COLD WATER PIPING UP FROM BELOW.
10 3/4" DOMESTIC HOT WATER PIPING UP FROM BELOW.
11 REROUTE CONDENSATE LINE DOWN IN CHASE TO BASEMENT. SEE BASEMENT PLUMBING PLAN, SHEET M201, FOR
CONTINUATION.
12 EXISTING FLOOR DRAIN AND ASSOCIATED WASTE AND VENT PIPING TO REMAIN.
1/4" = 1'-0"M210
2 FIRST FLOOR RESTROOM ENLARGED PLUMBING PLAN
1 Addendum #3 01/18/24
UNLESS NOTED OTHERWISE (U.N.O.)
16x12 16x12
DH-12A 1
18x14
18x14
DH-10
1 2
MAIN LOBBY
L100VESTIBULE #1
V101
WORK ROOM
A104B
STORAGE
A104B.1
OFFICE #5
A104C
OFFICE #3
A104D
OFFICE #1
A104E
STORAGE
A104E.1
BREAKRM
A104F
STORAGE
A104G.1
OPEN OFFICE
A104
LOBBY
L104
WORKROOM
A104A
VESTIBULE #2
V100
MEN
103A
WOMEN
103B
FOUNTAINS
CLASSROOM
C102
EXIST.
STORAGE
C102A
EXIST.
STORAGE
C102B
EXISTING
STORAGE
EXISTING
STORAGE
MUSEUM
M102
LOADING DOCK
ELEV. #2
EL102
EXIST. STAIR
S101
LOBBY
L101
EXISTING
EXIST. STAIR
S100
ELEV. #1
EL101
EXISTING
101A
10x10
10x10 EA
EF-103AB
E1-225-24x24
E1-225-24x24
M420
14x8
14x8
DH-37
M700
M700
M700
8x8
8x8
6x12 6x12
12x8
12x8 x6
6Ø
- INDICATES NO WORK IN THIS AREA
1/8" = 1'-0"M410
1 FIRST FLOOR HVAC PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
C E N ENFO
SE
ENOIS AL
GN
I
E
AT
P R
S
T K
E
GREG W.
KRAESZIG
L I S
D RE
Y
EFO K
C
TN
U
24762
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:5
:2
A
M
M410
FIRST FLOOR HVAC PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
GWK
MEW
2023/12/15
RTA
KEY NOTES:
1 REMOVE AND REPLACE ELECTRIC DUCT HEATER. SEE SCHEDULE.
2 PROVIDE 2-FT X 2-FT ACCESS DOOR
3 PROVIDE 3-FT X 3-FT ACCESS DOOR
4 10" x 10" UP TO EXHAUST LOUVER.
5 PRICE MODEL-SDS 100 LINEAR SLOT SUPPLY DIFFUSER WITH PLENUM, TYPE 14, FLUSH MOUNT, LAY-IN, 1-INCH SLOT, TWO-SLOT, 96-CFM/FT.
COORDINATE WIDTH WITH NEW CEILING PRIOR TO SUBMITTALS. COLOR SHALL BE BLACK.
6 GREENHECK MODEL-SQ-99-VG, DIRECT DRIVE INLINE EXHAUST FAN. PROVIDE VARI-GREEN VARIABLE SPEED DIAL FOR BALANCING. 450 CFM @ 0.35"
ESP, 115 VOLT POWER
7 PRICE MODEL-SDR 100 LINEAR SLOT RETURN REGISTER WITH PLENUM, TYPE 14, FLUSH MOUNT, LAY-IN, 1-INCH SLOT, TWO-SLOT, 96-CFM/FT.
COORDINATE WIDTH WITH NEW CEILING PRIOR TO SUBMITTALS. COLOR SHALL BE BLACK.
8 REINSTALL EXISTING ELECTRIC DUCT HEATER, DUCTWORK, AND GRILLES AND DIFFSUERS. NEW LOCATION APPROXIMATELY 8-FT ABOVE EXISTING LOCATION. NEW LOCATION SHALL BE 6-INCHES ABOVE NEW CEILING. PROVIDE ALL DUCT TRANSITIONS AND CONNECTIONS NECESSARY TO NEWLY
LOCATED ELEVATION.
1 Addendum #3 01/18/24
UNLESS NOTED OTHERWISE (U.N.O.)
M420
HUM3-1HUM4-1
HUM4-2
10x10 EA
20x10
20x10
DH-41
20x6
20x6
DH-42
x1 x1
D
H -4
20x10
20x10
DH-39
20x10 20x10
DH-38
12x8
12x8
DH-16
14x12 14x12
DH-15
20x10
20x10
DH-14
12x6
12x6
DH-46
10x8 10x8
DH-45
20x820x8
DH-29
M700
M700
M700
M700
M700
M700
M700
M700
M700
M700
M700
PROVIDE
EXHAUST
LOUVER. SIZE
SHALL BE
FIELD
DETERMINED
BY
CONTRACTOR.
SHALL NOT
EXCEED 900
FPM. INCLUDE
BACKDRAFT
DAMPER.
SEE ENLARGED PLUMBING PLAN,
THIS SHEET.
HUM3-1
22Ø
22Ø
HUM4-21
Ø
Ø
19Ø
HUM4-1
- INDICATES NO WORK IN THIS AREA
SECOND FLOOR
15' - 0"
HUM4-1 HUM4-2 HUM3-1
EXISTING PIPE
3/4" DCW 3/4" DCW
1 1/2" V
HUM4-1 HUM4-2 HUM3-1
1/2" DCW
TYP.
TP-1
FFD-2-TP
3" O.R.
3" O.R.
3" SAN
3" SAN
3" SAN
WHA
EX.
MB
3/ 4"
D C
W
WVR-2
M420
HCR-4
M420
1 1/2" V
1/
2" V
3" S
AN
3" S
AN
3" O.R.
3" O.R.
FFD-2-TP
EX MB
(E )3
V
(E )3
S
A N
(E)1/2" DHWR
(E)1 1/4" DCW
(E)3/4" DHW
3/4" D
CW
3/4" D
CW
1/ 2"
D C
W
1/ 2"
D C
W
1/ 2"
D C
W
3/ 4"
D C
W (E )1
/2
D H
W R
(E )1
/2
D H
W
EX.
MB
EX.
MB
TO
TP-1
3/4" DCW
3/ 4"
D C
W
HUM4-1
HUM4-2
HUM3-1
(E)1/2" DHWR
(E)1 1/4" DCW
(E)3/4" DHW
(E )1
/2
D H
W R
(E )1
/2
D H
W
(E )1
/2
D C
W
EX.
MB
EX.
MB
1/8" = 1'-0"M420
1 SECOND FLOOR HVAC PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
C E N ENFO
SE
ENOIS AL
GN
I
E
AT
P R
S
T K
E
GREG W.
KRAESZIG
L I S
D RE
Y
EFO K
C
TN
U
24762
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:5
:2
A
M
M420
SECOND FLOOR HVAC PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
GWK
MEW
2023/12/15
RTA
1/4" = 1'-0"M420
2 HUMDIFIERS
1 Addendum #3 01/18/24
UNLESS NOTED OTHERWISE (U.N.O.)
1/4" = 1'-0"M420
3 SECOND FLOOR ENLARGED PLUMBING PLAN
KEY NOTES:
1 EXISTING 4" ROOF LEADER TO REMAIN.
2 PIPING ABOVE CEILING.
3 PIPING BELOW FLOOR.
4 TRAP PRIMER UNIT (TP-1) - PRECISION PRODUCTS, INC. ELECTRONIC SURFACE MOUNTED TRAP PRIMER MODEL MPB-500. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. EXTEND 1/2" SOFT COPPER TRAP PRIMER LINES DOWN ON WALL THROUGH FLOOR AND EXTEND UNDER SLAB TO FLOOR DRAIN(S). MOUNT BOTTOM OF BOX MINIMUM 30" ABOVE FLOOR. PROVIDE ANGLE IRON FRAME SUPPORT AS REQUIRED FOR
TRAP PRIMER AND PIPING. CAP ANY UNUSED OUTLETS.
5 EXISTING 3" SANITARY / WASTE PIPING DOWN. EXISTING 3" VENT PIPING UP. CONNECT NEW 3" SANITARY / WASTE LINE AND NEW 1-1/2" VENT LINE TO
EXISTING SANITARY / WASTE AND VENT LINES AS REQUIRED.
6 REMOVE EXISTING 1/2" DOMESTIC COLD WATER LINE (FIELD VERIFY) AND REPLACE IN PLACE WITH NEW 3/4" DOMESTIC COLD WATER LINE TO SUPPLY
HUMIDIFIERS, TRAP PRIMER, AND EXISTING MOP BASIN ON SECOND FLOOR.
7 2' X 2' ACCESS PANEL IN CEILING.
8 ROUTE HUMIDIFIER DRAIN LINES TO 3" OPEN RECEPTACLE. ZURN Z-326, DURA-COATED CAST IRON, 9-INCH TOP. INSTALL IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
TO EX.
VTR
HCR-4D
M420
HCR-4N
M420
WVR-2N
M420
DEMOLITIONNEW WORK
NEW WORK
S DC
S DC
S DC
S DC
S DC
S DC
S DC
S DC
S GB
S
GB
S DC S DC S DCS DC
S DC
S DC
S DC
S
MD
S
GB
D
F FF PPB
2 2
- INDICATES NO WORK IN THIS AREA
1/8" = 1'-0"E110
1 FRIST FLOOR ELECTRICAL DEMOLITION PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
E
SE
R P
OF
S T
TA
E
NENIS O LA
E L
I C N S
IG
N
EE
D R
WILLIAM P.
N
22074
WILSON
OF KE
Y
CK
UT
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:3
:3
A
M
E110
FIRST FLOOR ELECTRICAL DEMOLITION PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
WPW
NPD
2023/12/15
RTA
KEY NOTES:
1 EXISTING LIGHT FIXTURES ARE TO BE REMOVED AND DISPOSED OF. EXISTING LIGHTING FEEDER CIRCUIT IS THE REMAIN AND TO BE RE-USED WITH
THE NEW LIGHT LAYOUT AND LOCATIONS. SEE NEW WORK.
2 REMOVE AND STORE EXISTING DOOR CONTACTS. DOOR CONTACTS ARE TO BE RE-INSTALLED IN NEW DOOR. SEE NEW WORK.
3 REMOVE AND STORE EXISTING AUDIO SENSOR. MAINTAIN IN PLACE ALL ASSOCIATED BACK BOX, CONDUIT, WIRE, ETC. AUDIO SENSOR IS TO BE
REINSTALLED IN NEW LAYOUT. SEE NEW WORK.
4 REMOVE AND STORE EXISTING MOTION SENSOR. MAINTAIN IN PLACE ALL ASSOCIATED BACK BOX, CONDUIT, WIRE, ETC. MOTION SENSOR IS TO BE
REINSTALLED IN NEW LAYOUT. SEE NEW WORK.
F
F
F
F
J J
J
J
J
J
J
J J
S
S
S S
S S
S
S GB
S
GB
S
MD
S
GB
S DC
S DC
S DC
S DC
S DC S DC S DC S DC
S DC
S DC
D
F FF PPB
TR
TR
TR
TR
TR
TR
TR
TR TR
TR
TR
TR
1 1
DH-12A
DH-10
D/38
D/38
D/36
D/36 D/36D/36
D/39
D/36
D/37
D/37
D/37
D/37
D/37
D/42
D 36,38,40
D 37,39
D
FF
13,14,15
DH-37
D
CLASSROOM
C102
WOMEN
103B
MEN
103A
MAIN LOBBY
L100
V E
S T
IB
U
LE
V
VESTIBULE #2
V100
9 10
EXIST.
STORAGE
C102A
EXIST.
STORAGE
C102B
EXISTING ELECTRICAL ROOM
FF
15 16
15 16
17 17
15 16
- INDICATES NO WORK IN THIS AREA
1/8" = 1'-0"E310
1 FIRST FLOOR POWER AND TECHNOLOGY PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
E
SE
R P
OF
S T
TA
E
NENIS O LA
E L
I C N S
IG
N
EE
D R
WILLIAM P.
N
22074
WILSON
OF KE
Y
CK
UT
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:3
:3
A
M
E310
FIRST FLOOR POWER AND TECHNOLOGY PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
WPW
NPD
2023/12/15
RTA
KEY NOTES:
1 INSTALL JUNCTION BOX AT TOP OF THE NICHE FOR DISPLAY CASE AND PROVIDE CONNECTION TO DISPLAY CASE. REFER TO ARCHITECTURAL DRAWINGS AND
COORDINATE WITH APPROVED SHOP DRAWINGS.
2 PROVIDE CONNECTION FOR WATER COOLER/BOTTLE FILLER. INSTALL BEHIND WATER COOLER SKIRT AND PER MANUFACTURER’S INSTRUCTIONS.
3 CEILING MOUNTED DATA OUTLET AND RECEPTACLE FOR CEILING MOUNTED PROJECTOR. RECEPTACLE TO BE FLUSH WITH FINISHED CEILING. REFER TO
ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING HEIGHT.
4 PROVIDE CONNECTION TO THE NEW DUCT HEATER USING THE EXISTING CIRCUIT. COORDINATE CONNECTION WITH MANUFACTURER’S SPECIFICATIONS AND
APPROVED SHOP DRAWINGS.
5 CONNECT NEW FIRE ALARM DEVICES TO THE EXISTING FIRE ALARM SYSTEM.
6 PROVIDE AND INSTALL TWO NEW 20A 1P BREAKERS IN THE EXISTING PANEL.
7 PROVIDE AND INSTALL THREE NEW 20A 1P BREAKER IN THE EXISTING PANEL.
8 PROVIDE POWER CONNECTION TO STATUE. COORDINATE EXACT LOCATION AND CONNECTION WITH ARCHITECT AND OWNER PRIOR TO ROUGH-IN.
9 CIRCUIT IS TO BE FEED UP FROM FLOOR BELOW.
10 PROVIDE NEW 1P 20AMP BREAKER IN EXISTING PANEL.
11 PROVIDE AND INSTALL A 4X4 JUNCTION BOX WITH A BLANK COVER PLATE IN THE CEILING FOR FUTURE USE. ROUTE ONE (1) 3/4” CONDUIT BACK TO THE EXISTING
ELECTRICAL ROOM ON THIS FLOOR.
12 PROVIDE AND INSTALL A 4X4 JUNCTION BOX WITH A BLANK COVER PLATE IN THE CEILING FOR FUTURE USE. ROUTE ONE (1) 1 1/2” CONDUIT BACK TO THE
TELECOMMUNICATIONS RACK IN THE BASEMENT MECHANICAL ROOM.
13 PROVIDE ROUGH-IN ABOVE WOOD PLANK CEILING FOR FUTURE SPEAKER. ROUTE CONDUIT(S) BACK TO EXISTING ELECTRICAL ROOM ON THIS FLOOR.
14 PROVIDE ROUGH-IN FOR FUTURE SPEAKER. INSTALL BLANK COVER PLATE FLUSH WITH FINISH CEILING. ROUTE CONDUIT(S) BACK TO STORAGE ROOM.
15 PROVIDE CONDUIT ROUGH-IN TO DOOR FRAME FOR DOOR HARDWARE/ACCESS CONTROL SYSTEM CABLING.
16 INSTALL EXISTING DOOR CONTACT IN NEW DOOR. CONNECT TO EXISTING SECURITY SYSTEM.
17 REINSTALL EXISITNG AUDIO SENSOR TO EXISTING BACK BOX AND CONNECT TO EXISTING WIRING. PROVIDE ANY BOX EXTENDERS IF REQUIRED SO THAT THE SENSOR
IS FLUSH WITH THE NEW CEILING.
18 REINSTALL EXISITNG MOTION SENSOR TO EXISTING BACK BOX AND CONNECT TO EXISTING WIRING. PROVIDE ANY BOX EXTENDERS IF REQUIRED SO THAT THE
SENSOR IS FLUSH WITH THE NEW CEILING.
J
H HH PPC
GGG
JANITOR
PPD
DH-46
DH-40
DH-41
DH-39
DH-38
DH-45
DH-16
DH-15
DH-14
DH-42
DH-29
HUM4-1 HUM4-2
HUM3-1
PPD/1,3,5
PPD/2,4,6PPD/7,9,11
H/25
4 1
1/8" = 1'-0"E320
1 SECOND FLOOR POWER AND TECHNOLOGY PLAN
NOTE:
IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE
WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.
E
SE
R P
OF
S T
TA
E
NENIS O LA
E L
I C N S
IG
N
EE
D R
WILLIAM P.
N
22074
WILSON
OF KE
Y
CK
UT
REVISION HISTORY OF THIS DRAWING
DECA LOG #
DRAWN BY
AS BULT DATE
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE
CHECKED BY
PHASE
RTA DATE
DRAWING DATE
A & E FILE NO.
DRAWING INFORMATION
DRAWING NO.
ENGR. FILE NO.
/1
/2
:3
:1
P
M
E320
SECOND FLOOR POWER AND TECHNOLOGY PLAN
665CAK5HP8200
RECORD DWG. DATE
KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1
4089 Iron Works Pkwy, Lexington, KY 40511
2023 | 12 | 11
22-0817.00
WPW
NPD
2023/12/15
RTA
KEY NOTES:
1 PROVIDE NEW 250A 480Y/277V 3-PHASE 4-WIRE 30-POLE PANELBOARD. PANELBOARD SHALL HAVE AN AIC RATING OF 42,000A OR GREATER. PROVIDE (4) 250 KCMIL FEEDERS WITH #4AWG GND IN 3" CONDUIT. FROM EXISTING SWITCHBOARD 'MDP' LOCATED IN BASEMENT.
2 PROVIDE CONNECTION TO THE NEW DUCT HEATER USING THE EXISTING CIRCUIT. COORDINATE CONNECTION WITH MANUFACTURER’S SPECIFICATIONS AND
APPROVED SHOP DRAWINGS.
3 PROVIDE NEW 1P 20AMP BREAKER IN EXISTING PANEL.
4 PROVIDE POWER CONNECTION TO TRAP PRIMER PER MANUFACTURER’S SPECIFICATIONS.
| addendum no 3.pdf |
| END OF ADDENDUM |
| IMOH_BP-1_Addendum 3 |
| IMOH_Addendum 3_NARRATIVE |
| M110 - FIRST FLOOR MECHANICAL DEMOLITION PLAN |
| M201 - BASEMENT PLUMBING PLAN |
| M210 - FIRST FLOOR PLUMBING PLAN |
| M410 - FIRST FLOOR HVAC PLAN |
| M420 - SECOND FLOOR HVAC PLAN |
| E110 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN |
| E310 - FIRST FLOOR POWER AND TECHNOLOGY PLAN |
| E320 - SECOND FLOOR POWER AND TECHNOLOGY PLAN |
File details come from the government source that posted it. Updated .