addendum no 3.pdf

PDF 2 MB Posted

Attached to
RFB-146-24 KHP Renovate International Museum BP-1
Solicitation number
RFB-785-2400000313-4
Issued by
Fayette County, Lexington-Fayette Urban County, Kentucky

About this file

This document is an addendum to an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services Division of Engineering and Contract Administration for the Renovate International Museum of the Horse Bid Pack 1 project at the Kentucky Horse Park in Lexington, Kentucky. The addendum provides revisions and updates to the mechanical, plumbing, and electrical drawings, including the relocation of existing ductwork and equipment, the rerouting of condensate and roof drainage lines, and adjustments to the HVAC and plumbing systems on the first and second floors. The bid due date is not specified, but the project is expected to commence in 2024.

The addendum does not provide any details on pricing, set asides, incumbent contractors, funding sources, or other commercial terms. It focuses solely on the technical changes to the construction drawings and specifications required for the renovation project.

View the file

Other files

File Type Posted
addendum no 1.pdf PDF
Final_RFB_785_2400000313_4_SO_FORM.PDF PDF
Final_RFB_785_2400000313_3_SO_FORM.PDF PDF
addendum no 2.pdf PDF
Final_RFB_785_2400000313_2_SO_FORM.PDF PDF
Final_RFB_785_2400000313_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-146-24

FOR: Renovate International Museum of the Horse Bid Pack 1 Kentucky Horse Park Lexington, Kentucky

DATE: January 18, 2024

RFP-785-2400000313

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-146-24 For: Renovate International Museum of the Horse Bid Pack 1 Kentucky Horse Park Lexington, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

Renovate International Museum of the Horse BP-1 Kentucky Horse Park Lexington, KY

EOP Architects 201 W. Short Street Suite 700 Lexington, KY 40507 859.231.7538 fax 859.255.4380 www.eopa.com

Addendum 3

Date: January 18, 2024

Addendum 3 Items:

Mechanical Addenda Items (M):

Drawings:

M110 – FIRST FLOOR MECHANICAL DEMOLITION PLAN

Relocation of existing duct heater, duct, and registers.

M201 – BASEMENT PLUMBING PLAN

Existing floor drain to remain.

M210 – FIRST FLOOR PLUMBING PLAN

Existing floor drain & piping above ceiling to remain.

M410 – FIRST FLOOR HVAC PLAN

Relocation of existing duct heater, duct, and registers.

M420 – SECOND FLOOR HVAC PLAN

Locations of duct mounted humidifiers and associated plumbing connections.

Specifications:

Not applicable.

Electrical Addenda Items (E):

Drawings:

E110 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN

Show existing security devices to be removed/reinstalled.

E310 - FIRST FLOOR POWER AND TECHNOLOGY PLAN

Show existing security devices to be removed/reinstalled.

E320 - SECOND FLOOR POWER AND TECHNOLOGY PLAN

Add power for trap primer.

End of Addendum

EX. 4"

V UP

EX.

FD

EX. 4"

V UP

EX. 2"

OR

EX.

WC

EX.

SINK

EX.

LAV

M420

- INDICATES NO WORK IN THIS AREA

1/8" = 1'-0"M110

1 FIRST FLOOR MECHANICAL DEMOLITION PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

C E N ENFO

SE

ENOIS AL

GN

I

E

AT

P R

S

T K

E

GREG W.

KRAESZIG

L I S

D RE

Y

EFO K

C

TN

U

24762

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:5

:1

A

M

M110

FIRST FLOOR MECHANICAL DEMOLITION PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

GWK

MEW

2023/12/15

RTA

KEY NOTES:

1 EXISTING 4" VENT STACK TO REMAIN.

2 EXISTING FLOOR DRAIN TO REMAIN.

3 REMOVE EXISTING PLUMBING FIXTURE AND ACCESSORIES. FIELD VERIFY AND TRACE EXISTING

ASSOCIATED SANITARY / WASTE, VENT AND/OR DOMESTIC WATER PIPING BACK TO EXISTING MAINS, REMOVE EXISTING PIPING BACK TO MAINS AND CAP PIPING AS REQUIRED.

4 REROUTE EXISTING CONDENSATE LINE DRAINING TO EXISTING 2" OPEN RECEPTACLE TO MOP BASIN

ON LOWER LEVEL. SEE SHEET M201.

5 CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC COLD WATER CONNECTIONS IN THIS ROOM AND

MAINTAIN EXISTING CONNECTIONS FOR REMAINING FIXTURES.

6 REMOVE EXISTING DUCT HEATER AND REINSTALL AS SHOWN ON NEW WORK PLANS. INCLUDE

DISCONNECTING ALL UTILITIES AND APPURTENANCES.

7 DISCONNECT DUCTWORK AS NECESSARY TO MOVE APPROXIMATELY 8-FT VERTICALLY ABOVE NEW

CEILING. SEE NEW WORK PLANS. CONTRACTOR MAY RE-USE EXISTING DUCT.

8 REMOVE AND REINSTALL SUPPLY DIFFUSER AND RETURN REGISTER AS NECESSARY FOR NEW

CEILING.

1 Addendum #3 01/18/24

(E)1 1/2" DHW

(E)3" DCW

(E)3/4" DHWR

4" SAN

4" SAN

4" SAN

PCO

EX.

4" V

(E)4" SAN

(E)4" SAN

(E)3/4" DCW

(E)3/4" DCW

UP TO

EX. WH

CAP

CAP

CAP

CAP

4" S

A N

4" S

A N

3/4" DHW

2" DCW

CD

CD

6" R

W L

(E )1

/4

D

C W

(E )3

/4

D H

W

(E )1

/2

D H

W R

- INDICATES NO WORK IN THIS AREA

1/8" = 1'-0"M201

1 BASEMENT PLUMBING PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

C E N ENFO

SE

ENOIS AL

GN

I

E

AT

P R

S

T K

E

GREG W.

KRAESZIG

L I S

D RE

Y

EFO K

C

TN

U

24762

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:5

:1

A

M

M201

BASEMENT PLUMBING PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

GWK

EDW

2023/12/15

RTA

KEY NOTES:

1 CONNECT TO EXISTING COLD WATER LINE AT THIS POINT.

2 CONNECT TO EXISTING HOT WATER LINE AT THIS POINT.

3 3/4" DOMESTIC COLD WATER LINE UP.

4 2" DOMESTIC COLD WATER LINE UP.

5 3/4" DOMESTIC HOT WATER LINE UP.

6 PIPING ABOVE BASEMENT CEILING.

7 FIELD VERIFY EXACT LOCATION OF EXISTING 4" SANITARY / WASTE STACK. CONNECT NEW 4" WASTE

FROM NEW RESTROOMS 103A AND 103B TO EXISTING 4" WASTE LINE DOWN AS REQUIRED.

8 REROUTED CONDENSATE LINE DOWN FROM ABOVE.

9 ROUTE CONDENSATE LINE TO JANITOR'S CLOSET AND DRAIN VIA AIR GAP TO EXISTING MOP BASIN.

10 REROUTED 6" ROOF LEADER DOWN FROM ABOVE.

11 FIELD VERIFY EXACT LOCATION OF EXISTING ROOF LEADER PIPING. RECONNECT REROUTED ROOF

LEADER TO EXISTING ROOF LEADER PIPING ABOVE BASEMENT CEILING AS REQUIRED.

12 EXISTING FLOOR DRAIN AND ASSOCIATED SANITARY / WASTE PIPING TO REMAIN.

HCR-1

M610

HCR-3

M610

WVR-1

M600

WVR-1

M600

CLASSROOM

C102

EXIST.

STORAGE

C102A

EXIST.

STORAGE

C102B

WC-1

WC-1 WC-1

U-1 L-1 L-1

L-1 L-1

EWC-1

FD-1

FD-1

HB-1

WC-1A

WHA-200

WC-1A

HB-1

4" V

4" V

EX. 4" V

UP & DN

EX.

FD

EX.

4" V

WOMEN

103B

FOUNTAINS

103MEN

103A

MAIN LOBBY

L100

LOBBY

L104

STORAGE

A104G.1

BREAKRM

A104F

STORAGE

A104E.1

VESTIBULE #2

V100

VESTIBULE #1

V101

CAP

WHA-200

SEE ENLARGED PLAN,

THIS SHEET.

CD

6" R

W L

SEE ENLARGED PLUMBING

PLAN, SHEET M420.

- INDICATES NO WORK IN THIS AREA

2" DCW

4" V

2" DCW

3/4" DCW

2" DCW

L-1 L-1

L-1 L-1

HB-1

WC-1A

WC-1 WC-1

WC-1

U-1

EWC-1

FD-1

FD-1

4" V

HB-1

10 9

WHA-200

WC-1A

MEN

103A

WOMEN

103B6" R

W L

1/8" = 1'-0"M210

1 FIRST FLOOR PLUMBING PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

C E N ENFO

SE

ENOIS AL

GN

I

E

AT

P R

S

T K

E

GREG W.

KRAESZIG

L I S

D RE

Y

EFO K

C

TN

U

24762

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:5

:2

A

M

M210

FIRST FLOOR PLUMBING PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

GWK

EDW

2023/12/15

RTA

KEY NOTES:

1 CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF EXISTING 6" ROOF LEADER DOWN FROM ABOVE. REROUTE EXISTING ROOF LEADER AS INDICATED AND RECONNECT TO EXISTING ROOF LEADAER PIPING ABOVE BASEMENT CEILING.

2 EXISTING CONDENSATE LINE UP AND DOWN TO REMAIN.

3 EXISTING DOMESTIC COLD WATER LINE UP AND DOWN TO REMAIN.

4 FIELD VERIFY EXACT LOCATION OF EXISTING 4" VENT STACK. CONNECT NEW 4" VENT PIPING TO EXISTING ABOVE FIRST

FLOOR CEILING AS REQUIRED.

5 CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC COLD WATER CONNECTIONS IN THIS ROOM AND MAINTAIN EXISTING

CONNECTIONS FOR REMAINING FIXTURES.

6 PIPING ABOVE CEILING.

7 PIPING IN CHASE.

8 2" DOMESTIC COLD WATER PIPING UP FROM BELOW.

9 3/4" DOMESTIC COLD WATER PIPING UP FROM BELOW.

10 3/4" DOMESTIC HOT WATER PIPING UP FROM BELOW.

11 REROUTE CONDENSATE LINE DOWN IN CHASE TO BASEMENT. SEE BASEMENT PLUMBING PLAN, SHEET M201, FOR

CONTINUATION.

12 EXISTING FLOOR DRAIN AND ASSOCIATED WASTE AND VENT PIPING TO REMAIN.

1/4" = 1'-0"M210

2 FIRST FLOOR RESTROOM ENLARGED PLUMBING PLAN

1 Addendum #3 01/18/24

UNLESS NOTED OTHERWISE (U.N.O.)

16x12 16x12

DH-12A 1

18x14

18x14

DH-10

1 2

MAIN LOBBY

L100VESTIBULE #1

V101

WORK ROOM

A104B

STORAGE

A104B.1

OFFICE #5

A104C

OFFICE #3

A104D

OFFICE #1

A104E

STORAGE

A104E.1

BREAKRM

A104F

STORAGE

A104G.1

OPEN OFFICE

A104

LOBBY

L104

WORKROOM

A104A

VESTIBULE #2

V100

MEN

103A

WOMEN

103B

FOUNTAINS

CLASSROOM

C102

EXIST.

STORAGE

C102A

EXIST.

STORAGE

C102B

EXISTING

STORAGE

EXISTING

STORAGE

MUSEUM

M102

LOADING DOCK

ELEV. #2

EL102

EXIST. STAIR

S101

LOBBY

L101

EXISTING

EXIST. STAIR

S100

ELEV. #1

EL101

EXISTING

101A

10x10

10x10 EA

EF-103AB

E1-225-24x24

E1-225-24x24

M420

14x8

14x8

DH-37

M700

M700

M700

8x8

8x8

6x12 6x12

12x8

12x8 x6

6Ø

- INDICATES NO WORK IN THIS AREA

1/8" = 1'-0"M410

1 FIRST FLOOR HVAC PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

C E N ENFO

SE

ENOIS AL

GN

I

E

AT

P R

S

T K

E

GREG W.

KRAESZIG

L I S

D RE

Y

EFO K

C

TN

U

24762

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:5

:2

A

M

M410

FIRST FLOOR HVAC PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

GWK

MEW

2023/12/15

RTA

KEY NOTES:

1 REMOVE AND REPLACE ELECTRIC DUCT HEATER. SEE SCHEDULE.

2 PROVIDE 2-FT X 2-FT ACCESS DOOR

3 PROVIDE 3-FT X 3-FT ACCESS DOOR

4 10" x 10" UP TO EXHAUST LOUVER.

5 PRICE MODEL-SDS 100 LINEAR SLOT SUPPLY DIFFUSER WITH PLENUM, TYPE 14, FLUSH MOUNT, LAY-IN, 1-INCH SLOT, TWO-SLOT, 96-CFM/FT.

COORDINATE WIDTH WITH NEW CEILING PRIOR TO SUBMITTALS. COLOR SHALL BE BLACK.

6 GREENHECK MODEL-SQ-99-VG, DIRECT DRIVE INLINE EXHAUST FAN. PROVIDE VARI-GREEN VARIABLE SPEED DIAL FOR BALANCING. 450 CFM @ 0.35"

ESP, 115 VOLT POWER

7 PRICE MODEL-SDR 100 LINEAR SLOT RETURN REGISTER WITH PLENUM, TYPE 14, FLUSH MOUNT, LAY-IN, 1-INCH SLOT, TWO-SLOT, 96-CFM/FT.

COORDINATE WIDTH WITH NEW CEILING PRIOR TO SUBMITTALS. COLOR SHALL BE BLACK.

8 REINSTALL EXISTING ELECTRIC DUCT HEATER, DUCTWORK, AND GRILLES AND DIFFSUERS. NEW LOCATION APPROXIMATELY 8-FT ABOVE EXISTING LOCATION. NEW LOCATION SHALL BE 6-INCHES ABOVE NEW CEILING. PROVIDE ALL DUCT TRANSITIONS AND CONNECTIONS NECESSARY TO NEWLY

LOCATED ELEVATION.

1 Addendum #3 01/18/24

UNLESS NOTED OTHERWISE (U.N.O.)

M420

HUM3-1HUM4-1

HUM4-2

10x10 EA

20x10

20x10

DH-41

20x6

20x6

DH-42

x1 x1

D

H -4

20x10

20x10

DH-39

20x10 20x10

DH-38

12x8

12x8

DH-16

14x12 14x12

DH-15

20x10

20x10

DH-14

12x6

12x6

DH-46

10x8 10x8

DH-45

20x820x8

DH-29

M700

M700

M700

M700

M700

M700

M700

M700

M700

M700

M700

PROVIDE

EXHAUST

LOUVER. SIZE

SHALL BE

FIELD

DETERMINED

BY

CONTRACTOR.

SHALL NOT

EXCEED 900

FPM. INCLUDE

BACKDRAFT

DAMPER.

SEE ENLARGED PLUMBING PLAN,

THIS SHEET.

HUM3-1

22Ø

22Ø

HUM4-21

Ø

Ø

19Ø

HUM4-1

- INDICATES NO WORK IN THIS AREA

SECOND FLOOR

15' - 0"

HUM4-1 HUM4-2 HUM3-1

EXISTING PIPE

3/4" DCW 3/4" DCW

1 1/2" V

HUM4-1 HUM4-2 HUM3-1

1/2" DCW

TYP.

TP-1

FFD-2-TP

3" O.R.

3" O.R.

3" SAN

3" SAN

3" SAN

WHA

EX.

MB

3/ 4"

D C

W

WVR-2

M420

HCR-4

M420

1 1/2" V

1/

2" V

3" S

AN

3" S

AN

3" O.R.

3" O.R.

FFD-2-TP

EX MB

(E )3

V

(E )3

S

A N

(E)1/2" DHWR

(E)1 1/4" DCW

(E)3/4" DHW

3/4" D

CW

3/4" D

CW

1/ 2"

D C

W

1/ 2"

D C

W

1/ 2"

D C

W

3/ 4"

D C

W (E )1

/2

D H

W R

(E )1

/2

D H

W

EX.

MB

EX.

MB

TO

TP-1

3/4" DCW

3/ 4"

D C

W

HUM4-1

HUM4-2

HUM3-1

(E)1/2" DHWR

(E)1 1/4" DCW

(E)3/4" DHW

(E )1

/2

D H

W R

(E )1

/2

D H

W

(E )1

/2

D C

W

EX.

MB

EX.

MB

1/8" = 1'-0"M420

1 SECOND FLOOR HVAC PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

C E N ENFO

SE

ENOIS AL

GN

I

E

AT

P R

S

T K

E

GREG W.

KRAESZIG

L I S

D RE

Y

EFO K

C

TN

U

24762

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:5

:2

A

M

M420

SECOND FLOOR HVAC PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

GWK

MEW

2023/12/15

RTA

1/4" = 1'-0"M420

2 HUMDIFIERS

1 Addendum #3 01/18/24

UNLESS NOTED OTHERWISE (U.N.O.)

1/4" = 1'-0"M420

3 SECOND FLOOR ENLARGED PLUMBING PLAN

KEY NOTES:

1 EXISTING 4" ROOF LEADER TO REMAIN.

2 PIPING ABOVE CEILING.

3 PIPING BELOW FLOOR.

4 TRAP PRIMER UNIT (TP-1) - PRECISION PRODUCTS, INC. ELECTRONIC SURFACE MOUNTED TRAP PRIMER MODEL MPB-500. INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. EXTEND 1/2" SOFT COPPER TRAP PRIMER LINES DOWN ON WALL THROUGH FLOOR AND EXTEND UNDER SLAB TO FLOOR DRAIN(S). MOUNT BOTTOM OF BOX MINIMUM 30" ABOVE FLOOR. PROVIDE ANGLE IRON FRAME SUPPORT AS REQUIRED FOR

TRAP PRIMER AND PIPING. CAP ANY UNUSED OUTLETS.

5 EXISTING 3" SANITARY / WASTE PIPING DOWN. EXISTING 3" VENT PIPING UP. CONNECT NEW 3" SANITARY / WASTE LINE AND NEW 1-1/2" VENT LINE TO

EXISTING SANITARY / WASTE AND VENT LINES AS REQUIRED.

6 REMOVE EXISTING 1/2" DOMESTIC COLD WATER LINE (FIELD VERIFY) AND REPLACE IN PLACE WITH NEW 3/4" DOMESTIC COLD WATER LINE TO SUPPLY

HUMIDIFIERS, TRAP PRIMER, AND EXISTING MOP BASIN ON SECOND FLOOR.

7 2' X 2' ACCESS PANEL IN CEILING.

8 ROUTE HUMIDIFIER DRAIN LINES TO 3" OPEN RECEPTACLE. ZURN Z-326, DURA-COATED CAST IRON, 9-INCH TOP. INSTALL IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS.

TO EX.

VTR

HCR-4D

M420

HCR-4N

M420

WVR-2N

M420

DEMOLITIONNEW WORK

NEW WORK

S DC

S DC

S DC

S DC

S DC

S DC

S DC

S DC

S GB

S

GB

S DC S DC S DCS DC

S DC

S DC

S DC

S

MD

S

GB

D

F FF PPB

2 2

- INDICATES NO WORK IN THIS AREA

1/8" = 1'-0"E110

1 FRIST FLOOR ELECTRICAL DEMOLITION PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

E

SE

R P

OF

S T

TA

E

NENIS O LA

E L

I C N S

IG

N

EE

D R

WILLIAM P.

N

22074

WILSON

OF KE

Y

CK

UT

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:3

:3

A

M

E110

FIRST FLOOR ELECTRICAL DEMOLITION PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

WPW

NPD

2023/12/15

RTA

KEY NOTES:

1 EXISTING LIGHT FIXTURES ARE TO BE REMOVED AND DISPOSED OF. EXISTING LIGHTING FEEDER CIRCUIT IS THE REMAIN AND TO BE RE-USED WITH

THE NEW LIGHT LAYOUT AND LOCATIONS. SEE NEW WORK.

2 REMOVE AND STORE EXISTING DOOR CONTACTS. DOOR CONTACTS ARE TO BE RE-INSTALLED IN NEW DOOR. SEE NEW WORK.

3 REMOVE AND STORE EXISTING AUDIO SENSOR. MAINTAIN IN PLACE ALL ASSOCIATED BACK BOX, CONDUIT, WIRE, ETC. AUDIO SENSOR IS TO BE

REINSTALLED IN NEW LAYOUT. SEE NEW WORK.

4 REMOVE AND STORE EXISTING MOTION SENSOR. MAINTAIN IN PLACE ALL ASSOCIATED BACK BOX, CONDUIT, WIRE, ETC. MOTION SENSOR IS TO BE

REINSTALLED IN NEW LAYOUT. SEE NEW WORK.

F

F

F

F

J J

J

J

J

J

J

J J

S

S

S S

S S

S

S GB

S

GB

S

MD

S

GB

S DC

S DC

S DC

S DC

S DC S DC S DC S DC

S DC

S DC

D

F FF PPB

TR

TR

TR

TR

TR

TR

TR

TR TR

TR

TR

TR

1 1

DH-12A

DH-10

D/38

D/38

D/36

D/36 D/36D/36

D/39

D/36

D/37

D/37

D/37

D/37

D/37

D/42

D 36,38,40

D 37,39

D

FF

13,14,15

DH-37

D

CLASSROOM

C102

WOMEN

103B

MEN

103A

MAIN LOBBY

L100

V E

S T

IB

U

LE

V

VESTIBULE #2

V100

9 10

EXIST.

STORAGE

C102A

EXIST.

STORAGE

C102B

EXISTING ELECTRICAL ROOM

FF

15 16

15 16

17 17

15 16

- INDICATES NO WORK IN THIS AREA

1/8" = 1'-0"E310

1 FIRST FLOOR POWER AND TECHNOLOGY PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

E

SE

R P

OF

S T

TA

E

NENIS O LA

E L

I C N S

IG

N

EE

D R

WILLIAM P.

N

22074

WILSON

OF KE

Y

CK

UT

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:3

:3

A

M

E310

FIRST FLOOR POWER AND TECHNOLOGY PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

WPW

NPD

2023/12/15

RTA

KEY NOTES:

1 INSTALL JUNCTION BOX AT TOP OF THE NICHE FOR DISPLAY CASE AND PROVIDE CONNECTION TO DISPLAY CASE. REFER TO ARCHITECTURAL DRAWINGS AND

COORDINATE WITH APPROVED SHOP DRAWINGS.

2 PROVIDE CONNECTION FOR WATER COOLER/BOTTLE FILLER. INSTALL BEHIND WATER COOLER SKIRT AND PER MANUFACTURER’S INSTRUCTIONS.

3 CEILING MOUNTED DATA OUTLET AND RECEPTACLE FOR CEILING MOUNTED PROJECTOR. RECEPTACLE TO BE FLUSH WITH FINISHED CEILING. REFER TO

ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING HEIGHT.

4 PROVIDE CONNECTION TO THE NEW DUCT HEATER USING THE EXISTING CIRCUIT. COORDINATE CONNECTION WITH MANUFACTURER’S SPECIFICATIONS AND

APPROVED SHOP DRAWINGS.

5 CONNECT NEW FIRE ALARM DEVICES TO THE EXISTING FIRE ALARM SYSTEM.

6 PROVIDE AND INSTALL TWO NEW 20A 1P BREAKERS IN THE EXISTING PANEL.

7 PROVIDE AND INSTALL THREE NEW 20A 1P BREAKER IN THE EXISTING PANEL.

8 PROVIDE POWER CONNECTION TO STATUE. COORDINATE EXACT LOCATION AND CONNECTION WITH ARCHITECT AND OWNER PRIOR TO ROUGH-IN.

9 CIRCUIT IS TO BE FEED UP FROM FLOOR BELOW.

10 PROVIDE NEW 1P 20AMP BREAKER IN EXISTING PANEL.

11 PROVIDE AND INSTALL A 4X4 JUNCTION BOX WITH A BLANK COVER PLATE IN THE CEILING FOR FUTURE USE. ROUTE ONE (1) 3/4” CONDUIT BACK TO THE EXISTING

ELECTRICAL ROOM ON THIS FLOOR.

12 PROVIDE AND INSTALL A 4X4 JUNCTION BOX WITH A BLANK COVER PLATE IN THE CEILING FOR FUTURE USE. ROUTE ONE (1) 1 1/2” CONDUIT BACK TO THE

TELECOMMUNICATIONS RACK IN THE BASEMENT MECHANICAL ROOM.

13 PROVIDE ROUGH-IN ABOVE WOOD PLANK CEILING FOR FUTURE SPEAKER. ROUTE CONDUIT(S) BACK TO EXISTING ELECTRICAL ROOM ON THIS FLOOR.

14 PROVIDE ROUGH-IN FOR FUTURE SPEAKER. INSTALL BLANK COVER PLATE FLUSH WITH FINISH CEILING. ROUTE CONDUIT(S) BACK TO STORAGE ROOM.

15 PROVIDE CONDUIT ROUGH-IN TO DOOR FRAME FOR DOOR HARDWARE/ACCESS CONTROL SYSTEM CABLING.

16 INSTALL EXISTING DOOR CONTACT IN NEW DOOR. CONNECT TO EXISTING SECURITY SYSTEM.

17 REINSTALL EXISITNG AUDIO SENSOR TO EXISTING BACK BOX AND CONNECT TO EXISTING WIRING. PROVIDE ANY BOX EXTENDERS IF REQUIRED SO THAT THE SENSOR

IS FLUSH WITH THE NEW CEILING.

18 REINSTALL EXISITNG MOTION SENSOR TO EXISTING BACK BOX AND CONNECT TO EXISTING WIRING. PROVIDE ANY BOX EXTENDERS IF REQUIRED SO THAT THE

SENSOR IS FLUSH WITH THE NEW CEILING.

J

H HH PPC

GGG

JANITOR

PPD

DH-46

DH-40

DH-41

DH-39

DH-38

DH-45

DH-16

DH-15

DH-14

DH-42

DH-29

HUM4-1 HUM4-2

HUM3-1

PPD/1,3,5

PPD/2,4,6PPD/7,9,11

H/25

4 1

1/8" = 1'-0"E320

1 SECOND FLOOR POWER AND TECHNOLOGY PLAN

NOTE:

IT IS NOT INTENDED THAT THE PLANS SHOW ALL OFFSETS IN PIPES, CONDUITS, AND DUCTS REQUIRED FOR INSTALLATION OF THE WORK. DETAILS AND SECTIONS ARE INCLUDED FOR SOME AREAS TO SHOW INTENDED RELATIONSHIP OF THE WORK OF VARIOUS TRADES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUB-CONTRACTORS TO COORDINATE INSTALLATION OF THE

WORK AND TO PROVIDE THE NECESSARY OFFSETS, TRANSFORMATIONS, AND FITTINGS REQUIRED. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CORRECTION CONFLICTS BETWEEN THE WORK OF VARIOUS TRADES. DETAILS AND SECTIONS ARE SHOWN FOR THE CONTRACTORS CONVENIENCE AND SHALL NOT BE CONSIDERED COMPLETE IN EVERY DETAIL.

E

SE

R P

OF

S T

TA

E

NENIS O LA

E L

I C N S

IG

N

EE

D R

WILLIAM P.

N

22074

WILSON

OF KE

Y

CK

UT

REVISION HISTORY OF THIS DRAWING

DECA LOG #

DRAWN BY

AS BULT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

DRAWING NO.

ENGR. FILE NO.

/1

/2

:3

:1

P

M

E320

SECOND FLOOR POWER AND TECHNOLOGY PLAN

665CAK5HP8200

RECORD DWG. DATE

KHP RENOVATE INTERNATIONAL MUSEUM OF THE HORSE - BP1

4089 Iron Works Pkwy, Lexington, KY 40511

2023 | 12 | 11

22-0817.00

WPW

NPD

2023/12/15

RTA

KEY NOTES:

1 PROVIDE NEW 250A 480Y/277V 3-PHASE 4-WIRE 30-POLE PANELBOARD. PANELBOARD SHALL HAVE AN AIC RATING OF 42,000A OR GREATER. PROVIDE (4) 250 KCMIL FEEDERS WITH #4AWG GND IN 3" CONDUIT. FROM EXISTING SWITCHBOARD 'MDP' LOCATED IN BASEMENT.

2 PROVIDE CONNECTION TO THE NEW DUCT HEATER USING THE EXISTING CIRCUIT. COORDINATE CONNECTION WITH MANUFACTURER’S SPECIFICATIONS AND

APPROVED SHOP DRAWINGS.

3 PROVIDE NEW 1P 20AMP BREAKER IN EXISTING PANEL.

4 PROVIDE POWER CONNECTION TO TRAP PRIMER PER MANUFACTURER’S SPECIFICATIONS.

addendum no 3.pdf
END OF ADDENDUM
IMOH_BP-1_Addendum 3
IMOH_Addendum 3_NARRATIVE
M110 - FIRST FLOOR MECHANICAL DEMOLITION PLAN
M201 - BASEMENT PLUMBING PLAN
M210 - FIRST FLOOR PLUMBING PLAN
M410 - FIRST FLOOR HVAC PLAN
M420 - SECOND FLOOR HVAC PLAN
E110 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN
E310 - FIRST FLOOR POWER AND TECHNOLOGY PLAN
E320 - SECOND FLOOR POWER AND TECHNOLOGY PLAN

File details come from the government source that posted it. Updated .