Addendum No 3.pdf

PDF 498 KB Posted

Attached to
RFB-79-26 HVAC Upgrades EDU-KY School for the Deaf
Solicitation number
RFB-785-2600000122-3
Issued by
Boyd County, Kentucky

About this file

This document is an Addendum (No. Three) to an Invitation to Bid issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for HVAC Upgrades at the Kentucky School for the Deaf's Kerr Hall located in Danville, Kentucky. The bid is identified as RFB-79-26 and dated October 7, 2025, with a specific project number RFB-785-2600000122. The addendum notifies bidders of a supplemental document (Sheet E-301 - Main Level Power Systems) that was previously omitted from Addendum #2, which is now being provided to ensure bidders have complete information for the project.

The electrical systems plan included with the addendum details the main level floor plan for power systems, showing multiple classrooms, administrative spaces, and mechanical areas. The drawing includes annotations for various electrical components such as fan coil units (FCU), existing generator, utility transformer, and a new main distribution panel (MDP) to be located on the lower level. The plan appears to be part of a comprehensive HVAC and electrical upgrade project for the educational facility, with detailed schematic representations of power distribution and system layout across the building's main level.

View the file

Other files

File Type Posted
Final_RFB_785_2600000122_3_SO_FORM.PDF PDF
Final_RFB_785_2600000122_2_SO_FORM.PDF PDF
Final_RFB_785_2600000122_1_SO_FORM.PDF PDF
Addendum No 2.pdf PDF
Addendum No 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-79-26

FOR: HVAC Upgrades EDU - KY School for the Deaf - Kerr Hall Danville, Kentucky

DATE: October 7, 2025

RFB-785-2600000122

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: The attached Sheet E-301 - Main Level Power Systems was omitted from Addendum #2.

END OF ADDENDUM

Invitation to Bid No. RFB-79-26 For: HVAC Upgrades EDU - KY School for the Deaf - Kerr Hall Danville, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

PF

F F

F

F

F

F

F

I I

I

I

F

I W F

I W

F

IWF

I W F

IWF IWF IWF

I W F I W F

I W F

I W F

IWF

I W

F

I W

F I W

F I W

F

I W

F

I W

F

I W

F

I W

F

I W F

IWF IWF

I W

F I

W F

I W

F

I W

F

I W

F I W

F

I W

F

IWF

IWF

I W

F

I W

F

I W F

F

I W F

J

J

J

M

M

M

F

F F

WI

F

SD HD

SD

SD

J

M

M

WAP WAP

WAP WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAP

WAP

WAPWAPWAPWAP

F

SD

W I

F

F

FAA

SD

SD

SD

W W

W

I I

I

WAP

WAPWAP

FACP

SD

W W

W

F F

F

W F

A B

B1

CLASSROOM

MEDIA CENTER

WORK ROOM

OFFICE

BOOK STORAGE

LOBBY

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

TELECOMM.

OFFICE

OFFICE

CLASSROOM

MECH

CLASSROOM

R.R.

CLASSROOM

CLASSROOM

CONFERENCE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SENSORY ROOM

RECORDS

VESTIBULE

705GG

LOUNGE

ELEV

705II

STORAGE

234A RR

RR

JANITOR

CLASSROOM

VESTIBULE

STAFF TEACHER LOUNGE

VESTIBULE

CORRIDOR

705SS

MULTI-USE SPACE

ADMIN

FCU-100

FCU-100

FCU-100

FCU-100

FCU-100

FCU-100

FCU-40

FCU-80

FCU-100

FCU-100

FCU-100

FCU-100

FCU-100

FCU-100

FCU-40

FCU-40

FCU-40

FCU-40

FCU-40

EXISTING GENERATOR

TO REMAIN

FCU-40

FCU-40

RCP-1

RCP-1

RCP-1

B1-18

B1-20

B1-21

A-25

A-27

B1-27

B-36

B-37

B-38

B-35

CIRCUIT TO

CU-1 ON ROOF

B1-24

AC-1

EXISTING UTILITY

TRANSFORMER

C

D

EL

EL

EL

NEW MDP

LOCATED AT

LOWER LEVEL

(BELOW)

PULL BOX

DIRECTIONAL BORE

UNDER EXISTING

BRICK WALL

E6

E7

A-26

A-28

HWP-3

B-40

B1-19

B1-23

B1-26

B1-25 B1-28

B1-29

B1-30 B-34

"EL"

E14

E16

E16

E16

E16

E16

(TYP)

E15

(TYP)

E15

(TYP)

E15

(TYP)

E15

(TYP)

E15

REVISION HISTORY OF THIS DRAWING

DECA LOG #

ENGR. FILE NO.

DRAWING NO.

DRAWN BY

AS BUILT DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE DESCRIPTION OF REVISIONS DATE

CHECKED BY

PHASE

RTA DATE

DRAWING DATE

A & E FILE NO.

DRAWING INFORMATION

# 540CBXLSD6301

ACCT# 540CBXLSD6301

10411 Meeting Street Prospect, KY 40059

T: 502 326.3085 F: 502 326.2691

08.20.2025

VKYS23

ADDENDUM 1 09.30.25

/7 /2

:5

:3

A

M

C

U s e rs \A

P a te l\ D o c u m e n ts \V

K Y

S

K e rr

H a ll_ A

P a te lB

P L

D T

.r v t

P ro je c t

N u m b e r_

O w n e r_ R

T A

E -3

K E

R R

H A

L L

M A

IN

L

E V

E L

P O

W E

R /S

Y S

T E

M S

E-301

KERR HALL - MAIN LEVEL POWER/SYSTEMS

S 2nd St, Danville, KY 40422

BKB

GTW

RTA

KENTUCKY SCHOOL FOR THE DEAF - KERR HALL

SCALE: 1/8" = 1'-0"

MAIN LEVEL FLOOR PLAN - POWER/SYSTEMS

GENERAL NOTES (POWER/SYSTEMS):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEWORK DETAILS FOR EXACT LOCATIONS OF ALL WALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, WITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED WITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT WITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE

BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A

COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.

C. IDENTIFY THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES,

SWITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR

ADHESIVE LABELS WITH BLACK LETTERING. IN HEALTHCARE FACILITIES,

ENGRAVE EMERGENCY DEVICE COVERPLATES IN PATIENT CARE

AREAS. MARK INSIDES OF ALL DEVICE BOXES WITH PANEL AND CIRCUIT

NUMBER.

D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS

SUCH AS OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM

SHALL BE MARKED IN ACCORDANCE WITH NEC 406.3(E).

E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS

SHALL BE COORDINATED WITH MECHANICAL AND PLUMBING

CONTRACTORS TO ENSURE ACCESS AND WORKING CLEARANCE IS

MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED

CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE

AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT

NAMEPLATES OR ACCESS PANELS OR THROUGH

ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER

TRADES.

F. REFER TO "SYSTEM INSTALLATION MATRIX" (ON SYSTEMS LEGEND

SHEET) AND SPECIFICATIONS FOR CONTRACTOR REQUIREMENTS OF

EACH SYSTEM.

G. THE CONTRACTOR SHALL ROUTE ALL ''SYSTEM CONDUIT STUB-UPS'' TO

THE NEAREST CORRIDOR CABLING PATH (SEE ''STUB-UP'' DETAILS).

REFER TO CABLING PATH INSTALLATION DETAIL FOR ADDITIONAL

REQUIREMENTS.

H. CONTRACTOR SHALL PAINT ALL SYSTEMS CONDUIT STUB-UPS LIGHT

BLUE FOR SYSTEMS CABLING INTO THE CORRIDOR CABLING PATH.

PROVIDE PULL STRINGS IN ALL NEW CONDUIT RUNS FOR SYSTEM

CABLING INSTALLATION.

KEYNOTES

E6 GROUND TEST WELL. REFER TO DETAILS ON SHEET #E-601 FOR

FURTHER DETAILS.

E7 PROVIDE 30”X48” IN-GRADE TIER 22 FRP PULL BOX WITH SKID

RESISTANT SURFACE. PROVIDE LOGO AND FINISH PER

ARCHITECT AND OWNER DURING SHOP DRAWING REVIEW.

PROVIDE ALL AVAILABLE COLORS AND LOGOS. QUAZITE OR

EQUAL.

E14 PROVIDE THREE (3) #10 CONDUCTORS IN 3/4" CONDUIT TO NEW

20A/1P BREAKER IN PANELBOARD INDICATED.

E15 PROPOSED CABLING PATH - COORDINATE ALL PATHS WITH

PIPING, DUCTWORK, ETC. (NOTE: STUB-UP CONDUITS SHALL BE

ROUTED TO THESE CABLING PATHS). PROVIDE "J-HOOK" STYLE

RINGS ALONG ALL REQUIRED CABLING PATHS - REFER TO

INSTALLATION DETAIL FOR FURTHER REQUIREMENTS

(TYPICAL).

E16 PROVIDE THREE - 4" CONDUITS AS INDICATED. INSTALL

SLEEVES ABOVE THE SUSPENDED CEILING IN-LINE WITH CABLE

PATH. REFER TO SLEEVE DETAIL FOR FURTHER

REQUIREMENTS (TYPICAL).

Addendum No 3.pdf
Item 1: The attached Sheet E-301 - Main Level Power Systems was omitted from Addendum #2.
END OF ADDENDUM
E-301 - KERR HALL - MAIN LEVEL POWER-SYSTEMS.pdf
Sheets
E-301 - KERR HALL - MAIN LEVEL POWER/SYSTEMS

File details come from the government source that posted it. Updated .