Addendum No 2 with Attachments Lincoln Dallis.pdf
PDF 4 MB Posted
- Attached to
- Lincoln Street Project
- Solicitation number
- PE-74150-NONST-2024-000000002
- Issued by
- Terrell County, Georgia
About this file
This document is an Addendum to the bid documents for the Lincoln Street - Dallis Street Intersection Improvement project in LaGrange, Georgia. The addendum provides updates to the bid schedule, including replacing the Bid Form, deleting and replacing various plan sheets, and providing responses to questions received. The bid due date has been changed to November 6, 2023, while the time and location of the bid opening remain the same. The work includes landscape improvements to be bid as a lump sum, as well as various roadway and utility items to be bid per unit prices. The contract includes a concrete paver alternate for the fountain area. Pricing terms include a soils and concrete testing allowance, and unit prices for removal of unsuitable material. There are no specific set-asides or incumbent mentioned in the documents provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No 1 with Attachments Lincoln Dallis.pdf | ||
| 00 11 16B _ Advertisement for Bids Lincoln St.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/26/2023 36432-19 ADD-2-1
ADDENDUM NO. 2
LINCOLN STREET – DALLIS STREET INTERSECTION IMPROVEMENT
CITY OF LAGRANGE
LAGRANGE, GEORGIA
* * * SPECIAL NOTICE * * *
THE BID DATE FOR THIS PROJECT HAS BEEN CHANGED TO NOVEMBER 6, 2023. THE
TIME AND LOCATION OF THE BID OPENING HAS NOT CHANGED.
ADDITIONAL INFORMATION DOCUMENTS
The following document:
• Questions and Responses No. 1 is being provided with this addendum for information purposes only. The document listed above is not, and will not, be considered as part of the Contract Documents.
SPECIFICATIONS
Delete Specification 00 41 00 – Bid Form and replace with Specification 00 41 00 – Bid Form dated October 26, 2023 included with this addendum. The October 26, 2023 version of the Bid Form shall be used for submittal of Bids unless notified otherwise.
DRAWINGS
Delete Sheets 01-0001, 03-0001, 06-0001, 13-0001, 13-0002, 19-0001, 19-0002, 24-0002, & 24-0003 and replace with Sheets 01-0001, 03-0001, 06-0001, 13-0001, 13-0002, 19-0001, 19- 0002, 24-0002, & 24-0003 included with this addendum.
Delete Sheets L3.00, L7.03, & I1.00 from the Landscape Improvements section and replace with Sheets L3.00, L7.03, & I1.00 included with this addendum.
Bidder Must Acknowledge Receipt of this Addendum on Bid Form
October 26, 2023
Barge Design Solutions, Inc.
2839 Paces Ferry Road SE, Suite 850 Atlanta, Georgia 30066
(770) 628-7645
10/26/2023 36432-19 QR 1-1
QUESTIONS AND RESPONSES NO. 1
LINCOLN STREET – DALLIS STREET INTERSECTION IMPROVEMENT
CITY OF LAGRANGE
LAGRANGE, GEORGIA
1. Q: There isn’t a line item for the work associated with the fountain or landscaping on the bid form. Will the bid form be updated by addendum?
R: Furnishing of all products, materials and equipment, and labor necessary to complete the Lincoln Street – Dallis Street Landscape Improvements, including all work shown on the Drawings and/or specified shall be bid as Lump Sum.
2. Q: The Bid Form will need a line item for the site furnishings listed on L2.00 correct?
R: Furnishing of all products, materials and equipment, and labor necessary to complete the Lincoln Street – Dallis Street Landscape Improvements, including all work shown on the Drawings and/or specified shall be bid as Lump Sum.
3. Q: I’m coming up with 583 square yards of sidewalks, the bid form has the quantity as 40 square yards.
R: The 40 square yards of sidewalk in the bid form represents the proposed sidewalk along the west side of Lincoln Street from STA 31+04.62 to STA 31+67.50 shown on Drawing 13-0002 of the roadway construction plans. All other proposed sidewalk is to included in the lump sum cost of the landscape improvement plans.
4. Q: On sheet L.300, there is the island area in the center that is shaded with a pattern that is not labeled. Can you inform me as to what the shading is to be?
R: This shaded area represents slatescape aggregate. See Detail 8 on Drawing L7.02.
5. Q: Are all the seat walls / benches CIP concrete walls?
R: All walls are CIP concrete. See Detail 9 on Drawing L7.02.
6. Q: Is the fountain wall CIP concrete or split-face block?
R: The fountain wall is split-face block – 18” plus cap.
7. Q: Should there bid a line item on the bid form for the reinforced concrete pipe and related structures?
R: All proposed drainage pipes and structures shown in the Landscape Improvements section shall be included in the lump sum cost for Basis of Bid Item Numbers 1A and 1B (Alternate-1).
8. Q: Sheet l2.00 references an alternate for brick pavers at the fountain. There is no line item for this on the bid form.
R: A new line item for a concrete paver alternate has been added to the Basis of Bid in Section 5.01 of Specification 00 41 00.
October 26, 2023
Barge Design Solutions, Inc.
2839 Paces Ferry Road SE, Suite 850
Atlanta, Georgia 30066
(770) 628-7645
Section 00 41 00 Bid Form
10/26/23 36432-19
Lincoln street – Dallis Street Intersection Improvement
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of LaGrange 200 Ridley Avenue LaGrange, Georgia 30240
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for period of time after the Bid opening as stated in the Advertisement for Bids, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
00 41 00 - 2
10/26/23 36432-19
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in SC-4.02 as containing reliable "technical data," and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in SC-4.06 as containing reliable "technical data."
E. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 3.01.E above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
J. Where this Bid Form contains the provision for a bid based on a lump sum price, the Bidder shall be responsible for having prepared its own estimate of the quantities necessary for the satisfactory completion of the Work specified in these Contract Documents and for having based the lump sum price bid on its estimate of quantities.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
00 41 00 - 3
10/26/23 36432-19
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
00 41 00 - 4
10/26/23 36432-19
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Item No.
Description Estimated
Qty.
Unit Unit Price Total Price
1A.
Furnishing all products, materials and equipment and performing all labor necessary to complete the Lincoln and Dallis Street Landscape Improvements, including all work shown on the Drawings and/or specified and not included in Items below, the total amount of:
Lump Sum $
2. Traffic Control Lump Sum $
3. Grading Complete Lump Sum $
4. Gr Aggr Base Crs, 10 IN, Incl Matl 380 SY $ $
5.
Recycled Asph Conc 12.5 MM SP, GP 2 Only, Incl Bitum Matl & H Lime
2680 SY
6.
Recycled Asph Conc 19 MM Superpave, GP 1 Or 2,Incl Bitum Matl & H Lime
10 SY
7.
Recycled Asph Conc 25 MM Superpave, GP 1 Or 2,Incl Bitum Matl & H Lime
10 SY
8. Mill Asph Conc Pvmt, Variable Depth 2680 SY $ $
9..
Conc Sidewalk, 4 IN 40 SY $ $
10.
Conc Curb & Gutter, 6 IN X 30 IN, TP
750 LF
11.
Pvmt Reinf Fabric Strips, TP 2, 18 IN Width
750 LF
12.
Storm Drain Pipe, 18 IN, H 1-10 70 LF $ $
13.
Flowable Fill 5 CY $ $
14.
Catch Basin, GP 1 2 EA $ $
15.
Remove Sign 3 EA $ $
16.
Hwy Signs, TP 1 Mat'l, Refl Sheeting, TP 3
SF
17.
Ground-Mounted Breakaway Sign Support
7 EA
18.
Thermoplastic Solid Traffic Stripe, 5 IN, White
1600 LF
19.
Thermoplastic Solid Traffic Stripe, 5 IN, Yellow
1100 LF
20.
Thermoplastic Solid Traffic Stripe, 24 IN, White
LF
21.
Thermoplastic Solid Traffic Stripe, 8 IN, White
300 LF
22.
Rem Exist Traf Strip & Markings, All Kinds & Type
550 LF
23.
Temporary Grassing 0.5 AC $ $
24.
Mulch 3 TN $ $
00 41 00 - 5
10/26/23 36432-19
25.
Construction Exit 1 EA $ $
26.
Construct & Remove Compost Filter Sock
39 LF
27.
Construct & Remove Inlet Sediment Traps
7 EA
28.
Maintenance of Temporary Silt Fence, TP A
175 LF
29.
Maintenance of Construction Exit 1 EA $ $
30.
Maintenance of Inlet Sediment Traps 7 EA $ $
31.
Temporary Silt Fence, Type A 350 LF $ $
32.
Barrior Fence (Orange), 4 FT 600 LF $ $
33.
Permanent Grassing 0.5 AC $ $
34.
Agricultural Lime 3 TN $ $
35.
Fertilizer Mixed Grade 0.5 TN $ $
36.
Fertilizer Nitrogen Content 50 LB $ $
37.
Sod 100 SY $ $
38.
Cash Allowances a.
Soils and Concrete Testing Allowance $ 2,500.00
***ADDITIONAL WORK IF ORDERED BY THE ENGINEER***
39.
Removal of Unsuitable Material and Replacement with a.
Crushed Stone 50 CY $ $ b.
Suitable Earth Material 50 CY $ $
40.
Alternate 1 – Concrete Pavers in lieu of Stamped Concrete for Landscape Improvements.
Lump Sum $
BID TOTAL, ITEMS 1 THROUGH 40, INCLUSIVE, THE AMOUNT OF
DOLLARS ($ ).
Bidder acknowledges Unit Prices have been determined in accordance with Paragraph 11.03.C of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
00 41 00 - 6
10/26/23 36432-19
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Bid Bond
B. Statement of Bidders Qualifications
C. Non-Collusion Affidavit of Prime Bidder
D. Corporate Certificate
E. Georgia Security and Immigration Compliance Act Affidavits
F. Contractor's License Certification
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
00 41 00 - 7
10/26/23 36432-19
ARTICLE 9 – BID SUBMITTAL
9.01 This Bid submitted by:
An Individual
Name (typed or printed):
By: (SEAL) (Individual’s signature)
Doing business as:
Attest:
(Notary)
Name (typed or printed):
A Partnership
Partnership Name: (SEAL)
By:
(Signature of general partner – attach evidence of authority to sign)
Name (typed or printed):
Attest:
(Signature of another Partner)
00 41 00 - 8
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By:
(Signature)
Title:
(CORPORATE SEAL)
Attest:
(Signature of Corporate Secretary)
A Joint Venture
Name of Joint Venturer:
First Joint Venturer Name: (SEAL)
By:
(Signature of first joint venture partner)
Title:
Second Joint Venturer Name: (SEAL)
By:
(Signature of second joint venture partner)
Name (typed or printed):
Title:
(Each joint venturer must sign. The manner of signing for each individual partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
00 41 00 - 9
All Bidders shall complete the following:
Bidder’s Business address:
Phone: Facsimile:
Primary Contact:
Primary Contact E-mail:
Submitted on: , 20_____.
This document was prepared in part from material (EJCDC C-410 Suggested Bid Form for Construction Contracts) which is copyrighted as indicated below:
Copyright © 2007 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
Associated General Contractors of America
2300 Wilson Boulevard, Suite 400, Arlington, VA 22201-3308
(703) 548-3118 www.agc.org
The copyright for this EJCDC document is owned jointly by the four EJCDC sponsoring organizations and held in trust for their benefit by NSPE
MILES
REVISIONS
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF PROJECT
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
PREPARED BY:
100% IN CONG. DIST. NO. 3.
TROUP COUNTY AND IS
THIS PROJECT IS 100% IN
01-0001
THE DEPARTMENT OF TRANSPORTATION.
STATE HIGHWAY DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO MEAN
DEPARTMENT ", OR " DEPARTMENT " WHEN THE CONTEXT THEREOF MEANS THE
HIGHWAY DEPARTMENT ", GEORGIA STATE HIGHWAY DEPARTMENT ", " HIGHWAY
WITH THIS DOCUMENT, TO " STATE HIGHWAY DEPARTMENT OF GEORGIA ", "STATE
DOCUMENTS, DRAWINGS, OR PHOTOGRAPHS USED, OR TO BE USED IN CONNECTION
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS, WRITINGS,
NOTE :
SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO
SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THE DEPARTMENT
FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
DALLIS STREET
N/A
N/A
CITY OF LAGRANGE
TROUP COUNTY
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
ROJECT LOCATIONP
STA. 40+95.00
GARFIELD
LIMIT OF CONSTRUCTION
E 2026486.8842 N 1101407.0117
STA. 10+89.33 BROWNWOOD
E 2026537.2017
N 1101407.0984
STA. 11+39.67
BROWNWOOD
END ALIGNMENT
STA. 24+47.00
DALLIS
LIMIT OF CONSTRUCTION
E 2026690.7246
N 1101909.4893
STA. 22+55.00
DALLIS
END PROJECT
E 2026497.7650
N 1101407.0984
STA. 33+00.00
LINCOLN
END ALIGNMENT
STA. 31+70.00
LINCOLN
LIMIT OF CONSTRUCTION
STA. 30+00.00 LINCOLN =
BEGIN ALIGNMENT
BEGIN PROJECT
E 2026398.1137
N 1101416.9520
STA. 10+00.00
BROWNWOOD
BEGIN ALIGNMENT
E 2026358.9867
N 1101819.8000
STA. 40+00.00
GARFIELD
BEGIN ALIGNMENT.
0.126
0.126
0.191
LOCATION SKETCH (N.T.S.)
GARFIELD STREET: LOCAL ROAD
LINCOLN STREET: LOCAL ROAD
DALLIS STREET: MINOR COLLECTOR
FUNCTIONAL CLASS:
STA. 20+16.00
DALLIS/LINCOLN
LIMIT OF CONSTRUCTION
STA. 20+00.00 DALLIS/LINCOLN =
E 2026576.2390 N 1101766.6469
STA. 23+72.36 DALLIS/LINCOLN
STA. 23+72.36 DALLIS=
PLANS COMPLETED 9-20-2023
10/02/2023
INV OUT 719.51 18"CON(S)
TOP 722.08
(SEE GDOT STD. 1033D)
PROP. CATCH BASIN
INV. OUT 721.84 18"CON(E)
TOP 724.23
PROP. CATCHBASIN A-01
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
GRWCOV
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
CONCOV
12/7/2018
DRAWING No.
200 400
SCALE IN FEET
0 100
10-05-2023
10/24/2023
REVISION
REVISION SUMMARY
03-0001
DRAWING NO.DATE DATE DRAWING NO. REVISION
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
C1.00
C2.00
C2.10
C3.00
C3.10
C4.00
C4.10
C4.20
C4.30
G0.01
01-0001
02-0001
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23 SHEET ADDED
COMPLETION DATE ADDED
I1.00
L3.00
L2.0010/02/23
10/02/23
10/02/23 NOTE ADDED
ITEM ROTATED
UPDATED NOTE
INDEX REVISED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
INDEX REVISED
10/02/23
10/02/23 06-0001 QUANTITIES 610-6515, 653-1502, 165-0105 REVISED
10/24/23 06-0001 QUANTITIES 005-0023 AND 205-0100 REMOVED
10/24/23
13-0001
13-0002
10/24/23 ADDED NOTES FOR SIDEWALKS AND WHEELCHAIR RAMPS
ADDED NOTES FOR SIDEWALKS AND WHEELCHAIR RAMPS
ADDED NOTE FOR WHEELCHAIR RAMPS
ADDED NOTE FOR WHEELCHAIR RAMPS
19-0002
19-000110/24/23
10/24/23
24-0003
24-0002
10/24/23
10/24/23
ADDED NOTE FOR WHEELCHAIR RAMPS
ADDED NOTE FOR WHEELCHAIR RAMPS
10/24/23
10/24/23
10/24/23
10/24/23
I1.00
L3.00
L7.03
FOUNTAIN UTILITY BOX LOCATION, WATER METER AND SERVICE LINE TO FOUNTAIN SHOWN
ADJUSTMENT TO PLANTING TO MAKE ROOM FOR UTILITY BOX INFRASTRUCTURE
ADA RAMP DETAIL 5/L7.03 INDICATING TRUNCATED DOME PAVER ADDED
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
10-25-2023
SUMMARY OF QUANTITIES
SUMMARY QUANTITIES
06-0001
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
10/02/23
10/24/23
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SUMMARY QUANTITIES
06-
CONSTRUCTION PLAN
LINCOLN STREET - DALLIS STREET
INTERSECTION IMPROVEMENT
13-0001
COST ESTIMATE.
LANDSCAPING LUMP SUM
TO BE INCLUDED IN
ALL WHEELCHAIR RAMPS
NOTE:
10/24/23
18'
12' 18'
18'
34.5'
37.5'
R
R
5'
R 5
R
18'
32.86'
INV OUT 719.51 18"CON(S)
TOP 722.08
(SEE GDOT STD. 1033D)
PROP. CATCH BASIN
SEE LANDSCAPE PLANS
PC 22+70.22
PI 23+41.90
E 2,026,552.7244
CURVE D10
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
E 2,026,495.4215
N 1,101,405.8653
CURVE B10
PI 10+97.94
R 250.00
L 35.74
T 17.90
P T
.7
8P C
.0
BEGIN ALIGNMENT
E 2026398.1137
N 1101416.9520
STA. 10+00.00
BROWNWOOD ST.
BEGIN ALIGNMENT
E 2026537.2017
N 1101407.0984
STA. 11+39.67
BROWNWOOD ST.
END ALIGNMENTE 2026486.8842
N 1101407.0117
STA. 10+89.33 BROWNWOOD
STA. 20+00.00 DALLIS/LINCOLN =
OFF -31.87
STA. 20+68.58
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
END TYPE 2 C&G
OFF -42.30
STA. 21+10.33
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
OFF -26.44
STA. 20+14.88
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
STA. 20+16.00
DALLIS/LINCOLN ST.
BEGIN MILL & OVERLAY
LIMIT OF CONSTRUCTION
PLANS FOR DETAIL
SEE LANDSCAPE
EL. 721.39
E 2026465.533 N 1101440.715
CONTROL PT 2
FENCE POST
BROWNWOOD AVE.
FENCE POST
.5 REBAR
.5 REBAR
INV OUT 718.03 15"CON(SW)
TOP 722.38
TOP 721.24
INV OUT 714.85 24"CON(NW)
INV IN 718.26 12"CON(NE)
INV OUT 720.47 8"CON(N)
TOP 722.38
S
ID
E W
A L
K
A S
P H
A L T
P A
R K
IN
G
S
ID
E W
A L
K
SIDEWALK
SIDEWALK
INV IN 718.07 6"CLAY(E)
INV IN 717.54 6"CLAY(N)
INV OUT 717.46 6"CLAY(S)
TOP 724.56
INV IN 717.06 4"CLAY(S)
INV IN 715.72 6"CLAY(N)
INV OUT 715.45 6"CLAY(W)
TOP 722.16
N/F
CALLAWAY FOUNDATION INC.
DB 1377 PG 694
PB 54 PG 258
N/F
DASH FOR LAGRANGE INC.
DB 2126 PG 576
PB 11 PG 235
DB 776 PG 161
N/F
DASH FOR LAGRANGE INC.
DB 1873 PG 71
PB 48 PG 172
DB 1755 PG 78
PB 2 PG 99
N/F
CALLAWAY FOUNDATION INC
PB 67 PG 146
N/F
HUDGINS RICHARD L SR & BESSIE
DB 1117 PG 157
PB 67 PG 146
SIDEWALK
OF STRUCTURE
APPROXIMATE LOCATION
DEPTH INV 718.91
APPROXIMATE BOTTOM
TOP 721.28
D A
L
IS
S
L
IN
C O
N
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 13-0002
CONSTRUCTION PLAN
LINCOLN STREET - DALLIS STREET
INTERSECTION IMPROVEMENT
13-0002
EGENDL
SOD
CONCRETE SIDEWALK
FULL DEPTH PAVEMENT
OTHERS
TO BE DONE BY
C+G AND CATCHBASIN
COST ESTIMATE.
LANDSCAPING LUMP SUM
TO BE INCLUDED IN
ALL WHEELCHAIR RAMPS
NOTE:
10/24/23
12' 12'
18'
12'
R
R
R
R
INV. OUT 721.84 18"CON(E)
TOP 724.23
PROP. CATCHBASIN A-01
SEE LANDSCAPE PLANS
P C
.9
PT 31+17.14
CURVE L10
PI 30+93.38
N 1,101,813.0003
E 2,026,495.1804
R 50.00
L 53.18
T 29.41
P C
1+
.4
P T
1+
.3
P T
.5
E 2,026,552.7244
CURVE D10
PI 23+41.90
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
N 1,101,796.7355
CURVE G10
E 2,026,480.7702
R 25.00
L 19.88
T 10.50
E 2026504.4937 N 1101813.2439
STA. 41+51.73 GARFIELD
STA. 30+86.13 LINCOLN =
BEGIN ALIGNMENT
PI 41+23.95
OFF -15.18
STA. 40+97.83
(TIE TO EXISTING)
GARFIELD ST.
BEGIN TYPE 2 C&G
OFF -17.24
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF 17.01
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF -17.89
STA. 24+46.05
(TIE TO EXISTING)
DALLIS ST.
BEGIN TYPE 2 C&G
STA. 31+70.00
LINCOLN ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
STA. 24+47.00
DALLIS ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
E 2026358.9867
N 1101819.8000
STA. 40+00.00
GARFIELD ST.
BEGIN ALIGNMENT
E 2026497.7650
N 1101407.0984
STA. 33+00.00
LINCOLN ST.
END ALIGNMENT
E 2026690.7246
N 1101909.4893
STA. 25+55.00
DALLIS ST.
END ALIGNMENT
STA. 40+98.00
GARFIELD ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
OFF.-17.24
STA. 31+67.50
(TIE INTO EXISTING)
LINCOLN ST.
BEGIN SIDEWALK
OFF.-14.50
STA. 31+04.62
(TIE INTO EXISTING)
LINCOLN ST.
END SIDEWALK
STA. 30+00.00 LINCOLN =
E 2026576.2390 N 1101766.6469
STA. 23+72.36 DALLIS/LINCOLN
STA. 23+72.36 DALLIS=
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
OFF 13.88
STA. 41+14.43
(TIE TO EXISTING)
GARFIELD ST.
END TYPE 2 C&G
EL. 727.51
E 2026600.368
N 1101761.613
CONTROL PT 1
EL. 725.52
E 2026522.072
N 1101815.696
CONTROL PT 3
6"
8"
2"
2"
21"
36"
.5 REBAR
724.25
.5 REBAR
NL
PK NAIL
NL
.5 REBAR
MB
MB
D A L L
IS
S T
L
IN
C O
GARFIELD ST.
S
ID
E W
A L K
SIDEWALK
ASPHALT
PARKING
SIDEWALK
TOP 726.55
INV OUT 719.12 6"CLAY(S)
INV IN 719.34 6"CLAY(N)
TOP 717.69
TOP OF WALL
ELE 724.73
INV IN 721.52 18"CON(NE)
INV OUT 721.74 24"CON(SW)
CATCH BASIN TO REMAIN)
(GRATE TO BE REMOVED,
STMH TOP 724.12
TOP 724.59
INV IN 724.47 18"CON(N)
INV OUT 724.28 18"CON(S)
TOP 727.16
INV IN 724.91 10"CLAY(NE)
INV OUT 724.74 10"CON(S)
TOP 727.96
INV IN 721.00 24"CON(N)
INV OUT 720.77 18"CON(NW)
TOP 724.50
INV OUT 725.61 10"CLAY(SW)
TOP 728.46
N/F
THOMPSON IRVING B JR & JOSEPH
DB 766 PG 160
PB 7 PG 182
N/F
DASH FOR LAGRANGE INC
DB 1617 PG 383
N/F
THOMPSON IRVING B JR & JOSEPH
DB 768 PG 552
N/F
BEACON BREWING LLC & C'S SONS LLC
DB 1905 PG 343
PB 79 PG 223
N/F
CALLAWAY FOUNDATION INC.
DB 1377 PG 694
PB 54 PG 258
POTENTIAL BLIND JUNCTION
INV OUT 720.48 15"CON(S)
(TO BE REMOVED)
TOP 724.01
12"DIP(NW)
INV OUT 714.84
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 13-0001
CONSTRUCTION STAGING PLANCONSTRUCTION PLAN
INTERSECTION IMPROVEMENT
13-0001
STAGING 1 HATCHING
STAGING NOTES
19-0001
INTERSECTION FOR TRAFFIC.
7. REMOVE DETOUR SIGNS AND REOPEN
6. APPLY ALL PROPOSED PAVEMENT MARKINGS.
20-0002)
DALLIS ST. WITH A FLAGGER. (SEE DETAIL ON SHT.
PARKING AREAS WHILE MAINTAINING TRAFFIC ON
5. MILL AND OVERLAY DALLIS ST. AND ADJACENT
MAINTAINING TRAFFIC ON DALLIS ST.
4. MILL AND OVERLAY INTERSECTION WHILE
GDOT STD. 9032B)
3. CONSTRUCT ALL TYPE 2 CURB AND GUTTER. (SEE
ST., AND DALLIS ST.
2. CLOSE INTERSECTION OF LINCOLN ST., GARFEILD
20-0001)
1. INSTALL ALL SIGNS IN DETOUR PLAN. (SEE SHT.
PERM CONST
SIDEWALK
MILL AND OVERLAY
10/24/23
18'
12' 18'
18'
34.5'
37.5'
R
R
5'
R 5
R
18'
32.86'
INV OUT 719.51 18"CON(S)
TOP 722.08
(SEE GDOT STD. 1033D)
PROP. CATCH BASIN
SEE LANDSCAPE PLANS
PC 22+70.22
PI 23+41.90
E 2,026,552.7244
CURVE D10
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
E 2,026,495.4215
N 1,101,405.8653
CURVE B10
PI 10+97.94
R 250.00
L 35.74
T 17.90
P T
.7
8P C
.0
BEGIN ALIGNMENT
E 2026398.1137
N 1101416.9520
STA. 10+00.00
BROWNWOOD ST.
BEGIN ALIGNMENT
E 2026537.2017
N 1101407.0984
STA. 11+39.67
BROWNWOOD ST.
END ALIGNMENTE 2026486.8842
N 1101407.0117
STA. 10+89.33 BROWNWOOD
STA. 20+00.00 DALLIS/LINCOLN =
OFF -31.87
STA. 20+68.58
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
END TYPE 2 C&G
OFF -42.30
STA. 21+10.33
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
OFF -26.44
STA. 20+14.88
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
STA. 20+16.00
DALLIS/LINCOLN ST.
BEGIN MILL & OVERLAY
LIMIT OF CONSTRUCTION
PLANS FOR DETAIL
SEE LANDSCAPE
EL. 721.39
E 2026465.533 N 1101440.715
CONTROL PT 2
BROWNWOOD AVE.
INV OUT 718.03 15"CON(SW)
TOP 722.38
TOP 721.24
INV OUT 714.85 24"CON(NW)
INV IN 718.26 12"CON(NE)
INV OUT 720.47 8"CON(N)
TOP 722.38
S
ID
E W
A L
K
A S
P H
A
R K
IN
G
S
ID
E W
A L
K
SIDEWALK
SIDEWALK
SIDEWALK
OF STRUCTURE
APPROXIMATE LOCATION
DEPTH INV 718.91
APPROXIMATE BOTTOM
TOP 721.28
D A
L
L
IN
C O
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 19-0002
CONSTRUCTION STAGING PROFILE
19-0002
PERM CONST
SIDEWALK
MILL AND OVERLAY
PAVEMENT REMOVAL
STAGING HATCHING
STAGING NOTES
LINCOLN STREET - DALLIS STREET
INTERSECTION IMPROVEMENT
INTERSECTION FOR TRAFFIC.
8. REMOVE DETOUR SIGNS AND REOPEN
7. APPLY ALL PROPOSED PAVEMENT MARKINGS.
20-0002)
DALLIS ST. WITH A FLAGGER. (SEE DETAIL ON SHT.
PARKING AREAS WHILE MAINTAINING TRAFFIC ON
6. MILL AND OVERLAY DALLIS ST. AND ADJACENT
MAINTAINING TRAFFIC ON DALLIS ST.
5. MILL AND OVERLAY INTERSECTION WHILE
GDOT STD. 9032B)
4. CONSTRUCT ALL TYPE 2 CURB AND GUTTER. (SEE
3. CONSTRUCT DRAINAGE STRUCTURE ON LINCOLN ST.
ST., AND DALLIS ST.
2. CLOSE INTERSECTION OF LINCOLN ST., GARFEILD
20-0001)
1. INSTALL ALL SIGNS IN DETOUR PLAN. (SEE SHT.
OTHERS
TO BE DONE BY
C+G AND CATCHBASIN
10/24/23
12' 12'
18'
12'
R
R
R
R
SIGN
REMOVE EX.
INV. OUT 721.84 18"CON(E)
TOP 724.23
PROP. CATCHBASIN A-01
SIGN
REMOVE EX.
SEE LANDSCAPE PLANS
SIGN
REMOVE EX.
P C
.9
PT 31+17.14
CURVE L10
PI 30+93.38
N 1,101,813.0003
E 2,026,495.1804
R 50.00
L 53.18
T 29.41
P C
1+
.4
P T
1+
.3
P T
.5
E 2,026,552.7244
CURVE D10
PI 23+41.90
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
N 1,101,796.7355
CURVE G10
E 2,026,480.7702
R 25.00
L 19.88
T 10.50
E 2026504.4937 N 1101813.2439
STA. 41+51.73 GARFIELD
STA. 30+86.13 LINCOLN =
BEGIN ALIGNMENT
PI 41+23.95
OFF -15.18
STA. 40+97.83
(TIE TO EXISTING)
GARFIELD ST.
BEGIN TYPE 2 C&G
OFF -17.24
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF 17.01
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF -17.89
STA. 24+46.05
(TIE TO EXISTING)
DALLIS ST.
BEGIN TYPE 2 C&G
STA. 31+70.00
LINCOLN ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
STA. 24+47.00
DALLIS ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
E 2026358.9867
N 1101819.8000
STA. 40+00.00
GARFIELD ST.
BEGIN ALIGNMENT
E 2026497.7650
N 1101407.0984
STA. 33+00.00
LINCOLN ST.
END ALIGNMENT
E 2026690.7246
N 1101909.4893
STA. 25+55.00
DALLIS ST.
END ALIGNMENT
STA. 40+98.00
GARFIELD ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
OFF.-17.24
STA. 31+67.50
(TIE INTO EXISTING)
LINCOLN ST.
BEGIN SIDEWALK
OFF.-14.50
STA. 31+04.62
(TIE INTO EXISTING)
LINCOLN ST.
END SIDEWALK
STA. 30+00.00 LINCOLN =
E 2026576.2390 N 1101766.6469
STA. 23+72.36 DALLIS/LINCOLN
STA. 23+72.36 DALLIS=
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
OFF 13.88
STA. 41+14.43
(TIE TO EXISTING)
GARFIELD ST.
END TYPE 2 C&G
6"
8"
2"
2"
21"
36"
.5 REBAR
724.25
.5 REBAR
NL
PK NAIL
NL
.5 REBAR
MB
MB
D A L L
IS
S T
L
IN
C O
GARFIELD ST.
S
ID
E W
A L K
SIDEWALK
ASPHALT
PARKING
SIDEWALK
TOP 717.69
TOP OF WALL
ELE 724.73
INV IN 721.52 18"CON(NE)
INV OUT 721.74 24"CON(SW)
CATCH BASIN TO REMAIN)
(GRATE TO BE REMOVED,
STMH TOP 724.12
TOP 724.59
INV IN 724.47 18"CON(N)
INV OUT 724.28 18"CON(S)
TOP 727.16
INV IN 724.91 10"CLAY(NE)
INV OUT 724.74 10"CON(S)
TOP 727.96
INV IN 721.00 24"CON(N)
INV OUT 720.77 18"CON(NW)
TOP 724.50
INV OUT 725.61 10"CLAY(SW)
TOP 728.46
POTENTIAL BLIND JUNCTION
INV OUT 720.48 15"CON(S)
(TO BE REMOVED)
TOP 724.01
12"DIP(NW)
INV OUT 714.84
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 19-0001
UTILITY PLANS
INTERSECTION IMPROVEMENT
24-0002
BY OTHERS
TO BE RELOCATED
BY OTHERS
TO BE RELOCATED
10/24/23
18'
12' 18'
18'
34.5'
37.5'
R
R
5'
R 5
R
18'
32.86'
INV OUT 719.51 18"CON(S)
TOP 722.08
(SEE GDOT STD. 1033D)
PROP. CATCH BASIN
SEE LANDSCAPE PLANS
PC 22+70.22
PI 23+41.90
E 2,026,552.7244
CURVE D10
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
E 2,026,495.4215
N 1,101,405.8653
CURVE B10
PI 10+97.94
R 250.00
L 35.74
T 17.90
P T
.7
8P C
.0
BEGIN ALIGNMENT
E 2026398.1137
N 1101416.9520
STA. 10+00.00
BROWNWOOD ST.
BEGIN ALIGNMENT
E 2026537.2017
N 1101407.0984
STA. 11+39.67
BROWNWOOD ST.
END ALIGNMENTE 2026486.8842
N 1101407.0117
STA. 10+89.33 BROWNWOOD
STA. 20+00.00 DALLIS/LINCOLN =
OFF -31.87
STA. 20+68.58
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
END TYPE 2 C&G
OFF -42.30
STA. 21+10.33
(TIE TO EXISTING)
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
OFF -26.44
STA. 20+14.88
DALLIS/LINCOLN ST.
BEGIN TYPE 2 C&G
STA. 20+16.00
DALLIS/LINCOLN ST.
BEGIN MILL & OVERLAY
LIMIT OF CONSTRUCTION
PLANS FOR DETAIL
SEE LANDSCAPE
EL. 721.39
E 2026465.533 N 1101440.715
CONTROL PT 2
FENCE POST
BROWNWOOD AVE.
FENCE POST
.5 REBAR
.5 REBAR
INV OUT 718.03 15"CON(SW)
TOP 722.38
TOP 721.24
INV OUT 714.85 24"CON(NW)
INV IN 718.26 12"CON(NE)
INV OUT 720.47 8"CON(N)
TOP 722.38
S
ID
E W
A L
K
A S
P H
A
R K
IN
G
S
ID
E W
A L
K
SIDEWALK
SIDEWALK
INV IN 718.07 6"CLAY(E)
INV IN 717.54 6"CLAY(N)
INV OUT 717.46 6"CLAY(S)
TOP 724.56
INV IN 717.06 4"CLAY(S)
INV IN 715.72 6"CLAY(N)
INV OUT 715.45 6"CLAY(W)
TOP 722.16
N/F
CALLAWAY FOUNDATION INC.
DB 1377 PG 694
PB 54 PG 258
N/F
DASH FOR LAGRANGE INC.
DB 2126 PG 576
PB 11 PG 235
DB 776 PG 161
N/F
DASH FOR LAGRANGE INC.
DB 1873 PG 71
PB 48 PG 172
DB 1755 PG 78
PB 2 PG 99
N/F
CALLAWAY FOUNDATION INC
PB 67 PG 146
N/F
HUDGINS RICHARD L SR & BESSIE
DB 1117 PG 157
PB 67 PG 146
SIDEWALK
OF STRUCTURE
APPROXIMATE LOCATION
DEPTH INV 718.91
APPROXIMATE BOTTOM
TOP 721.28
D A
L
L
IN
C O
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 24-0003
UTILITY PLANS
INTERSECTION IMPROVEMENT
24-0003
BY OTHERS
TO BE RELOCATED
10/24/23
12' 12'
18'
12'
R
R
R
R
INV. OUT 721.84 18"CON(E)
TOP 724.23
PROP. CATCHBASIN A-01
SEE LANDSCAPE PLANS
P C
.9
PT 31+17.14
CURVE L10
PI 30+93.38
N 1,101,813.0003
E 2,026,495.1804
R 50.00
L 53.18
T 29.41
P C
1+
.4
P T
1+
.3
P T
.5
E 2,026,552.7244
CURVE D10
PI 23+41.90
N 1,101,742.5091
R 280.00
L 140.35
T 71.68
N 1,101,796.7355
CURVE G10
E 2,026,480.7702
R 25.00
L 19.88
T 10.50
E 2026504.4937 N 1101813.2439
STA. 41+51.73 GARFIELD
STA. 30+86.13 LINCOLN =
BEGIN ALIGNMENT
PI 41+23.95
OFF -15.18
STA. 40+97.83
(TIE TO EXISTING)
GARFIELD ST.
BEGIN TYPE 2 C&G
OFF -17.24
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF 17.01
STA. 31+70.00
(TIE TO EXISTING)
LINCOLN ST.
END TYPE 2 C&G
OFF -17.89
STA. 24+46.05
(TIE TO EXISTING)
DALLIS ST.
BEGIN TYPE 2 C&G
STA. 31+70.00
LINCOLN ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
STA. 24+47.00
DALLIS ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
E 2026358.9867
N 1101819.8000
STA. 40+00.00
GARFIELD ST.
BEGIN ALIGNMENT
E 2026497.7650
N 1101407.0984
STA. 33+00.00
LINCOLN ST.
END ALIGNMENT
E 2026690.7246
N 1101909.4893
STA. 25+55.00
DALLIS ST.
END ALIGNMENT
STA. 40+98.00
GARFIELD ST.
END MILL & OVERLAY
LIMIT OF CONSTRUCTION
OFF.-17.24
STA. 31+67.50
(TIE INTO EXISTING)
LINCOLN ST.
BEGIN SIDEWALK
OFF.-14.50
STA. 31+04.62
(TIE INTO EXISTING)
LINCOLN ST.
END SIDEWALK
STA. 30+00.00 LINCOLN =
E 2026576.2390 N 1101766.6469
STA. 23+72.36 DALLIS/LINCOLN
STA. 23+72.36 DALLIS=
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
PLANS FOR DETAIL
SEE LANDSCAPE
OFF 13.88
STA. 41+14.43
(TIE TO EXISTING)
GARFIELD ST.
END TYPE 2 C&G
EL. 727.51
E 2026600.368
N 1101761.613
CONTROL PT 1
EL. 725.52
E 2026522.072
N 1101815.696
CONTROL PT 3
6"
8"
2"
2"
21"
36"
.5 REBAR
724.25
.5 REBAR
NL
PK NAIL
NL
.5 REBAR
MB
MB
D A L L
IS
S T
L
IN
C O
GARFIELD ST.
TOP 726.55
INV OUT 719.12 6"CLAY(S)
INV IN 719.34 6"CLAY(N)
TOP 717.69
TOP OF WALL
ELE 724.73
INV IN 721.52 18"CON(NE)
INV OUT 721.74 24"CON(SW)
CATCH BASIN TO REMAIN)
(GRATE TO BE REMOVED,
STMH TOP 724.12
TOP 724.59
INV IN 724.47 18"CON(N)
INV OUT 724.28 18"CON(S)
TOP 727.16
INV IN 724.91 10"CLAY(NE)
INV OUT 724.74 10"CON(S)
TOP 727.96
INV IN 721.00 24"CON(N)
INV OUT 720.77 18"CON(NW)
TOP 724.50
INV OUT 725.61 10"CLAY(SW)
TOP 728.46
N/F
THOMPSON IRVING B JR & JOSEPH
DB 766 PG 160
PB 7 PG 182
N/F
DASH FOR LAGRANGE INC
DB 1617 PG 383
N/F
THOMPSON IRVING B JR & JOSEPH
DB 768 PG 552
N/F
BEACON BREWING LLC & C'S SONS LLC
DB 1905 PG 343
PB 79 PG 223
N/F
CALLAWAY FOUNDATION INC.
DB 1377 PG 694
PB 54 PG 258
POTENTIAL BLIND JUNCTION
INV OUT 720.48 15"CON(S)
(TO BE REMOVED)
TOP 724.01
12"DIP(NW)
INV OUT 714.84
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
SCALE IN FEET
0 40 80
MATCH LINE STA. 22+95.30 DRAWING NO. 24-0002
10-25-202310-25-2023
CS2
IVM8
DVJ17
IVM7
ARC9
DVJ15
ARC19
CAC26
CS3
HSO19
HSO79
CAC15
ARC26
AF1
HSO24
CAC9
ARC9
HSO27
AF1AJ1
LI3
TAS104
TD1
HSO68
HSO27
115 SF RIVER ROCK (4"-6")
TREES QTY BOTANICAL NAME COMMON NAME CONDITION SIZE HEIGHT COMMENTS
AJ 1 Acer japonicum 'Mai Kujaku' Dancing Peacock Japanese Maple 15 Gal. 1.5" Cal. 8`-10` HT. Straight dominant leader, Full crown, Well branched AF 2 Acer x freemanii 'Celebration' Celebration Maple Cont./B&B 2"-2 1/2" Cal. 12`-14` HT. Straight dominant leader, Full crown, Well branched CS 5 Camelia Sasanqua 'Yuletide' Sasanqua Camelia Cont./B&B 5`-6` HT. Straight dominant leader, Full crown, Well branched LI 3 Lagerstroemia indica x fauriei 'Natchez' Natchez Crape Myrtle Cont./B&B Multi-stemmed 1"Cal. 8`-10` HT. Multi-stemmed, 3-4 canes TD 1 Taxodium distichum 'Lindsey's Skyward' Lindey's Skyward Bald Cypress Cont./B&B 2"-2 1/2" Cal. 12`-14` HT. Straight dominant leader, Full crown, Well branched
SHRUBS QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS
ARC 64 Abelia x `Rose Creek` Rose Creek Abelia Container 3 GAL. As Shown Full, Dense, Well rooted in pot DVJ 32 Distylium x 'Vintage Jade' Vintage Jade Distylium Container 3 GAL. As Shown Full, Dense, Well rooted in pot IVM 15 Itea virginica 'Merlot' Merlot Sweetspire Container 3 Gal. As Shown Full, Dense, Well rooted in pot
GRASSES QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS
CAC 50 Calamagrostis x acutiflora 'Karl Foerster' Karl Foerster Grass Container 3 Gal. As Shown Full, Dense, Well rooted in pot
SEASONAL DRY-STACK ROCK QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS ROCK 115 sf Seasonal Dry-Stack Rock .
GROUND COVERS QTY BOTANICAL NAME COMMON NAME CONDITION COMMENTS COMMENTS
HSO 244 Hemerocallis x 'Stella de Oro' Stella de Oro Daylily #1 15" O.C.
TAS 81 Trachelospermum asiaticum Asiatic Jasmine SP4 12" O.C.
ZOJ 1,341 sf Zoysia japonica `El Toro` El Toro Zoysia Grass Sod SF
PLANT SCHEDULE
FILE NO.
L3.00 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
L3 .0
0.
dw g
PL
O
TT
ED
:1 0/
/2
SA
VE
D :1
0/
/2
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
SI
TE
L
AN
D
SC
AP
E
PL
AN
PLANT SCHEDULE
L3.00
G
AR
FI
EL
D S
TR
EE
T
DALLIS STREET
BR
O
W N
W O
O D
A
VE
N U
E
LINCOLN
STREET
NOTES:
1. SEE ALL DISTURBED AREAS OUTSIDE LIMITS OF WORK THAT ARE
NOT DESIGNATED MULCH OR LANDSCAPE AREAS.
2. SEE SHEET L2.00 FOR SITE MATERIALS AND FURNISHINGS PLAN.
3. SEE SHEET L7.01 FOR LANDSCAPE DETAILS.
DALLIS ST./LINCOLN ST.
G H
PL
D
/0
2/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
.1
G H
PL
D
/2
4/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
.2
EQ
EQ.
EQ.
R7'-0"'
R8'-0"'
R5'-6"'
R24'-31 2"
14'-0"
7'-0"
8'-0"
7'-0"
8'-0"
R15'-0"
R16'-0"'
R24'-0"R25'-0"
L7.02 TYP.
L7.03LANDSCAPE BED
LANDSCAPE BED
'-7
R10'-0"'
L7.02 TYP.
FILE NO.
L7.03 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
L7 .0
0.
dw g
PL
O
TT
ED
:1 0/
/2
SA
VE
D :1
0/
/2
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N H
AR
D
SC
AP
E D
ET
AI
LS
NTSL7.03
TRASH RECEPTACLE DETAIL1
L7.03
2 BIKE RACK ON AGGREGATE DETAIL
±4" ±4"
ATTACHMENT PER MANUFACTURER'S
RECOMMENDATIONS
HEAVY DUTY CONCRETE
L7.02
NOTES:
1. SEE SITE FURNISHINGS SCHEDULE ON SHEET L1.00 FOR PRODUCT
INFORMATION.
2. TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS.
FINISH GRADE VARIES,
SEE PLANS
NTS
L7.03
4 FOUNTAIN PRECAST CAP PROFILE
NTSL7.03
3 FOUNTAIN AND PLAZA ENLARGEMENT PLAN
3/16" = 1' - 0"
(3) SPRAY NOZZLES/BUBBLER
(SPRAY HEIGHT TO BE
APPROXIMATELY 8" HIGH)
PRECAST CONCRETE CAP WITH
STUCCO FINISH, SEE DETAIL 4/L7.03
18" CAST-IN-PLACE CONCRETE
WALL BELOW
L7.03
8" 2"
2'-8"
FRONT SECTION
4" MIN. THICK OF COMPACTED 5 8" MINIS
SLATESCAPE
CONCRETE FOOTING, 3,000 PSI W/
FIBERMESH REINFORCEMENT, TYP.
2" THICK COMPACTED G.A.B., TYP.
95% STD. PROCTOR COMPACTED
SUBGRADE, TYP.
2" CHAMFER ON EXPOSED EDGES, TYP.
9" 4"
4" MIN. THICK OF COMPACTED 5 8" MINIS
SLATESCAPE
2" CHAMFER ON EXPOSED EDGES, TYP.
CONCRETE FOOTING, 3,000 PSI W/
FIBERMESH REINFORCEMENT, TYP.
3'-4 3/4"
2" THICK COMPACTED G.A.B., TYP.
95% STD. PROCTOR COMPACTED
SUBGRADE, TYP.
SIDE SECTION
1/
2"
4"
8"
6"
VARIES
CAP JOINT, TYP.
" R
EC
O
M M
EN
D
ED
H
EI
G
H T
2 1/2"
BIKE RACK - SEE FURNISHING
SCHEDULE, L2.00
SIGNAGE - NOT IN
CONTRACT, PROVIDED
BY OTHERS
L7.02
1'-6"
CAST STONE CAP '4A';
SEE DETAIL 4A/L7.03
HEIGHT VARIES, SEE GRADING PLAN
3000 PSI CONCRETE FOOTER
WITH #4 REBAR 24"
LATERALLY AND 12" O.C.
LONGITUDINALLY, 3" MIN. COVER
FINISHED GRADE
VARIES, SEE PLAN
8' 4"
1'-2"1'-2"
EXTEND BLOCK 6"
MIN. BELOW GRADE
3" 3 1/
4"
1'-6"
1" TYP
OVERHANG
#4 REBAR @ 16" O.C.
1/2" Ø x4" S.S. DOWEL CENTERED IN
EVERY OTHER BLOCK CELL,
ALTERNATE SIDES
CAST STONE WALL CAP
NTS4A
90°'
8"X8"X16" SPLIT FACE BLOCK
- GROUT ALL CELLS
1/4" DRIP EDGE, TYP.
1/2" GROUT JOINT, TYP.
1/4" RADIUS, TYP.
CAST STONE CAP W/ EQUALLY
SPACED JOINTS (4' MAX); SEE
MATERIALS SCHEDULE / L1.00
NOTE: CAST STONE CAP SURFACES SHALL BE TREATED
W/ PROSOCO SACRIFICIAL COATING SC-1 GRAFFITI
PROTECTION COATING OR APPROVED EQUIVALENT
COMPACTED GAB, TYP.
COMPACTED SUBGRADE TO
95% STD PROCTOR, TYP.
L7.02 3A
EXPANSION JOINT, TYP.
FOUNTAIN NOTES
1. FOUNTAIN INFORMATION IS FOR DESIGN INTENT ONLY. FOUNTAIN CONTRACTOR TO PROVIDE
SHOP DRAWINGS FOR THE CONSTRUCTION AND MECHANICAL SYSTEMS OF THE FOUNTAIN.
LANDSCAPE ARCHITECT TO REVIEW AND APPROVE PRIOR TO INSTALLATION.
2. FOUNTAIN BASIN IS TO BE WATERPROOFED.
3. SUBMIT SHOP DRAWINGS FOR ALL PRECAST COMPONENTS FOR REVIEW AND APPROVAL BY A/E.
4. CONTRACTOR TO PROVIDE UNDER WATER PLUME JET BUBBLER
- MODEL "NEW 101" BY CRYSTAL FOUNTAINS.
- FOR OPTIMUM EFFECT LOCATE 3" UNDER WATER LEVEL
- PROVIDE A NON-TURBULANT WATER SUPPLY
- WAVE SUPPRESSION DEVICE REQUIRED FOR SMALL CIRCULAR POOLS OR CONFINED AREAS
- A CONSTANT UNVARYING WATER LEVEL IS REQUIRED
CRYSTALFOUNTAINS.COM, 1-905-660-6674
5. CONTRACTOR TO PROVIDE NECESSARY WATER LEVEL SENSOR AND AUTOMATIC REFILL AS
REQUIRED. PROVIDE FLOAT FOR AUTOFILL AS REQUIRED.
6. FOUNTAIN SHOULD DRAIN EASILY, DISCHARGE WATER TO SEWER.
RAMP
CL
NORMAL C
URB/G
UTT
ER S
LO
PE
NORMAL C
URB/G
UTT
ER S
LO
PE
La nd ing A rea Landing Area
" M ini mum
2.0 8%
M ax 2.08% Max 12 :1 MAX SLOPE
48" Minimum
BACK OF SIDEWALK SHALL BE
LOCATED AS SHOWN IN THE
PLANS OR AS DIRECTED BY
THE ENGINEER SO AS NOT
TO ENCROACH INTO THE
REQUIRED LANDING AREA.
12 :1 MAX
SLOPE
2.08% MAX
1-1.5% DES
LA
NDIN
G
FL
ARED
SID
ES 1:
MAX.
TRANSITION
CURB
TRANSITION
GUTTER TO
2% OR LESS90°
DETECTABLE WARNING
SURFACE TO BE TRUNCATED DOME
CONCRETE PAVER.
HOLLAND STONE BURNT AMBER
WITH HERRINGBONE PATTERN OR
APPROVED EQUAL.
ADA ACCESSIBLE RAMP -TYPE 'A'
N.T.S.L7.03
G H
PL
D
/2
4/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
FILE NO.
I1.00 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
I1 .0
0.
dw g
PL
O
TT
ED
:1 0/
/2
SA
VE
D :1
0/
/2
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N O
VE
R
AL
L
SI
TE
IR
R
IG
AT
IO
N
P
LA
N
IRRIGATION LEGEND:
AREAS TO BE IRRIGATED
IRRIGATION NOTES:
1. IRRIGATION PLANS ARE NOT INCLUDED AS PART OF THESE
LANDSCAPE PLANS. IRRIGATION PLANS AND SPECIFICATIONS
ARE TO BE SUBMITTED BY SUBCONTRACTOR AND APPROVED BY
LANDSCAPE ARCHITECT AND OWNER. SEE AREAS TO BE
IRRIGATED ON THIS SHEET.
2. THE PROPOSED AREA OF IRRIGATION IS TO BE ALL LANDSCAPE
BEDS & TREES.
3. ALL PRODUCTS SHALL HAVE CUT SHEETS SUBMITTED TO THE
LANDSCAPE ARCHITECT PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. CONTRACTOR TO SUBMIT DETAILED IRRIGATION LAYOUT PLANS
TO LANDSCAPE ARCHITECT INDICATING:
A. LOCATION, TYPE AND COVERAGE OF HEADS (SPRAY ARC)
B. ZONE MAP WITH FLOW RATES
C. DETAILED IRRIGATION PROGRAMMING SCHEDULE TO
ENSURE MAXIMUM PERFORMANCE OF THE SYSTEM.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING GPM
RATE AND PSI FOR SYSTEM CALCULATIONS.
6. PROPOSED IRRIGATION SYSTEM SHALL PROVIDE COMPUTER
CONTROLLER TO BE APPROVED BY LANDSCAPE ARCHITECT.
7. IRRIGATION CONTROLLER TO BE EQUIPPED WITH SMART
WEATHER STATION.
8. ALL IRRIGATION IS TO BE DRIP IRRIGATION OR SPRAY AS
NEEDED.
9. ALL NEWLY INSTALLED PLANT MATERIALS SHALL BE FULLY
IRRIGATED TO ENSURE PLANT HEALTH AND GROWTH SUCCESS.
10. THE IRRIGATION CONTRACTOR SHALL COORDINATE LAYOUT AND
INSTALLATION WITH THE GENERAL CONTRACTORS ON THE SITE.
STRUCTURES OR PAVEMENT NOTED ON THE PLAN, BUT NOT IN
PLACE, SHOULD BE STAKED. THE IRRIGATION SYSTEMS SHOULD
NOT INTERFERE WITH FUTURE PLACEMENT OF THESE PAVED
SURFACES OR STRUCTURES.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY
CONSTRUCTION PERMITS AND FEES.
12. CONTRACTOR SHALL INSTALL 4" SCHEDULE 40 PVC PIPE
SLEEVES A MINIMUM DEPTH OF 18" BELOW FINISH GRADE. CAP
ENDS AND EXTEND SLEEVES 2'-0" BEYOND EDGE OF PAVEMENT.
LAY HEAVY DUTY SLEEVES IN 3" GRAVEL BED MINIMUM.
BACKFILL WITH GRAVEL AND COMPACT. TO WITHSTAND URBAN
CONDITIONS. SLEEVES SHALL BE INSTALLED BY IRRIGATION
CONTRACTOR. REFERENCE DIAGRAMMATIC SLEEVING PLAN ON
THIS SHEET FOR SUGGESTED LOCATION OF SLEEVES. ADD
ADDITIONAL SLEEVES AS NEEDED.
13. GENERAL CONTRACTOR SHALL PROVIDE 120-VOLT POWER
SOURCE FOR CONTROLLER. CONTROLLER LOCATION AND
MOUNTAIN TO BE COORDINATED WITH OWNER.
14. INSTALL ADDITIONAL AUTOMATIC DRAIN VALVES AS REQUIRED
TO DRAIN ALL LINES FOR PROTECTION AGAINST WINTER FREEZE
DAMAGE. LOCATE MANUAL DRAIN VALVES AT LOW POINT ON
MAIN. ALL WATER FLUSHED FROM THE SYSTEM SHALL BE
DIRECTED IMMEDIATELY INTO SITE DRAINS. IRRIGATION WATER
SHALL NOT ENTER CURB OR STREET DRAINS.
15. 24V WIRING TO BE MINIMUM AWG 12/1, SUITABLE FOR DIRECT
BURIAL PER CODE, COLOR CODED. BURY WITH SLACK, BENEATH
OR ADJACENT TO PIPE FOR PROTECTION. SPLICE WITH SHEARS
MODEL DS-100 DRI-SPLICE, OR APPROVED EQUAL.
16. INSTALL AUTOMATIC CONTROL VALVES IN AMETEK VALVE BOXES
OF APPROPRIATE SIZE, VB-10 OR VB-12, OR APPROVED EQUAL.
17. COMPLETE WORK IN COMPLIANCE WITH LOCAL AND STATE
CODES FOR USE OF RECLAIMED WATER. PROVIDE ALL
NECESSARY PERMITS AT THE COST OF THE IRRIGATION
CONTRACTOR.
18. UPON COMPLETION OF IRRIGATION SYSTEM, CONTRACTOR
SHALL TEST AND ADJUST SYSTEM WITH LANDSCAPE ARCHITECT
PRESENT PRIOR TO BURYING LINES.
19. CONTRACTOR TO MAKE 1 MONTH, 6 MONTH AND 9 MONTH
MAINTENANCE VISITS WITH OWNER TO VERIFY ADEQUATE
PERFORMANCE AND OPERATION OF SYSTEM. IF DEFICIENT,
NECESSARY ADJUSTMENTS TO BE MADE AT NO COST.
20. DISCREPANCIES BETWEEN THE FIELD LAYOUT AND CONTRACT
DOCUMENTS SHOULD BE REPORTED AS SOON AS POSSIBLE TO
THE OWNER AND LANDSCAPE ARCHITECT IN CASE REVISIONS
ARE NECESSARY. INADEQUATE IRRIGATION COVER SHOULD BE
NOTED AND CORRECTED BEFORE THE IRRIGATION CONTRACTOR
LEAVES THE SITE.
21. CONTRACTOR TO COORDINATE ALL METER AND BACKFLOW
INFORMATION, LOCATION, AND SIZE. A BOOSTER PUMP SHALL
BE SUPPLIED AS NECESSARY TO PROVIDE ADEQUATE
PRESSURE.
SLEEVING (TYP.)
C
CONTROLLER, 34" METER, AND
4" COPPER SERVICE LINE TO
BE COORDINATED WITH
OWNER, SEE NOTES THIS
SHEET
G
AR
FI
EL
D S
TR
EE
T
DALLIS STREET
BR
O
W N
W O
O D
A
VE
N U
E
LINCOLN
STREET
CONTRACTOR TO PROVIDE AT
MINIMUM 2 HOSE PIPE
CONNECTIONS FOR FUTURE
WATER ACCESS
DALLIS ST./LINCOLN ST.
WATER METER BOX/VALVE TO BE
RELOCATED BY IRRIGATION
CONTRACTOR AS NECESSARY TO
ACCOMODATE PROPOSED
IMPROVEMENTS
G H
PL
D
/0
2/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
.1
APPROXIMATE LOCATION OF
FOUNTAIN UTILITY
BOX/CONTROLS
G H
PL
D
/2
4/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
File details come from the government source that posted it. Updated .