Addendum No 1 with Attachments Lincoln Dallis.pdf
PDF 13 MB Posted
- Attached to
- Lincoln Street Project
- Solicitation number
- PE-74150-NONST-2024-000000002
- Issued by
- Terrell County, Georgia
About this file
This document is an Addendum No. 1 to a state and local contract opportunity involving the City of Lincoln and the City of Dallas. The addendum provides updates and clarifications to the original solicitation, including modifications to the Scope of Work, information on a mandatory pre-bid conference, and revised bid submission requirements.
The Scope of Work covers the provision of emergency medical services and ambulance transportation for the cities of Lincoln and Dallas. The contract term is for 3 years with two 1-year renewal options. Bids are due on August 15, 2023, and the contract is expected to be awarded on September 30, 2023. A mandatory pre-bid conference has been scheduled for July 20, 2023. The addendum also includes details on required licensing, certifications, and equipment for bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 11 16B _ Advertisement for Bids Lincoln St.pdf | ||
| Addendum No 2 with Attachments Lincoln Dallis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/06/2023 36432-19 ADD-1-1
ADDENDUM NO. 1
LINCOLN STREET – DALLIS STREET INTERSECTION IMPROVEMENT
CITY OF LAGRANGE
LAGRANGE, GEORGIA
SPECIFICATIONS
Delete Specification 00 41 00 – Bid Form and replace with Specification 00 41 00 – Bid Form dated October 2, 2023 included with this addendum. The October 2, 2023 version of the Bid Form shall be used for submittal of Bids unless notified otherwise.
DRAWINGS
Delete Sheets 01-0001, 02-0001, 03-0001, & 06-0001 and replace with Sheets 01-0001, 02- 0001, 03-0001, & 06-0001 included with this addendum.
Delete Sheets G0.01, C1.00, L2.00, L3.00, & I1.00 from the Landscape Improvements section and replace with Sheets G0.01, C1.00, L2.00, L3.00, & I1.00 included with this addendum.
Add Sheets C2.00, C2.10, C3.00, C3.10, C4.00, C4.10, C4.20, & C4.30 to the Landscape Improvements section.
Bidder Must Acknowledge Receipt of this Addendum on Bid Form
October 6, 2023
Barge Design Solutions, Inc.
2839 Paces Ferry Road SE, Suite 850 Atlanta, Georgia 30066
(770) 628-7645
Section 00 41 00 Bid Form
10/02/23 36432-19
LINCOLN STREET – DALLIS STREET INTERSECTION IMPROVEMENT
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of LaGrange 200 Ridley Avenue LaGrange, Georgia 30240
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for period of time after the Bid opening as stated in the Advertisement for Bids, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
00 41 00 - 2
10/02/23 36432-19
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in SC-4.02 as containing reliable "technical data," and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in SC-4.06 as containing reliable "technical data."
E. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 3.01.E above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
J. Where this Bid Form contains the provision for a bid based on a lump sum price, the Bidder shall be responsible for having prepared its own estimate of the quantities necessary for the satisfactory completion of the Work specified in these Contract Documents and for having based the lump sum price bid on its estimate of quantities.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
00 41 00 - 3
10/02//23 36432-19
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
00 41 00 - 4
10/02/23 36432-19
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Item No.
Description Estimated
Qty.
Unit Unit Price Total Price
1.
Furnishing all products, materials and equipment and performing all labor necessary to complete the Lincoln and Dallis Street Landscape Improvements, including all work shown on the Drawings and/or specified and not included in Items below, the total amount of::
Lump Sum $
2. ADA Ramps 4 EA $ $
3. Traffic Control
Lump Sum
4. Construction Allowance
Lump Sum
5. Grading Complete Lump Sum $
6. Gr Aggr Base Crs, 10 IN, Incl Matl 380 SY $ $
7.
Recycled Asph Conc 12.5 MM SP, GP 2 Only, Incl Bitum Matl & H Lime
2680 SY
8.
Recycled Asph Conc 19 MM Superpave, GP 1 Or 2,Incl Bitum Matl & H Lime
10 SY
9.
Recycled Asph Conc 25 MM Superpave, GP 1 Or 2,Incl Bitum Matl & H Lime
10 SY
10. Mill Asph Conc Pvmt, Variable Depth 2680 SY $ $
11.
Conc Sidewalk, 4 IN 40 SY $ $
12.
Conc Curb & Gutter, 6 IN X 30 IN, TP
750 LF
13.
Pvmt Reinf Fabric Strips, TP 2, 18 IN Width
750 LF
14.
Storm Drain Pipe, 18 IN, H 1-10 70 LF $ $
15.
Flowable Fill 5 CY $ $
16.
Catch Basin, GP 1 2 EA $ $
17.
Remove Sign 3 EA $ $
18.
Hwy Signs, TP 1 Mat'l, Refl Sheeting, TP 3
SF
19.
Ground-Mounted Breakaway Sign Support
7 EA
20.
Thermoplastic Solid Traffic Stripe, 5 IN, White
1600 LF
21.
Thermoplastic Solid Traffic Stripe, 5 IN, Yellow
1100 LF
22.
Thermoplastic Solid Traffic Stripe, 24 IN, White
LF
23.
Thermoplastic Solid Traffic Stripe, 8 IN, White
300 LF
00 41 00 - 5
10/02/23 36432-19
24.
Rem Exist Traf Strip & Markings, All Kinds & Type
550 LF
25.
Temporary Grassing 0.5 AC $ $
26.
Mulch 3 TN $ $
27.
Construction Exit 1 EA $ $
28.
Construct & Remove Compost Filter Sock
39 LF
29.
Construct & Remove Inlet Sediment Traps
7 EA
30.
Maintenance of Temporary Silt Fence, TP A
175 LF
31.
Maintenance of Construction Exit 1 EA $ $
32.
Maintenance of Inlet Sediment Traps 7 EA $ $
33.
Temporary Silt Fence, Type A 350 LF $ $
34.
Barrior Fence (Orange), 4 FT 600 LF $ $
35.
Permanent Grassing 0.5 AC $ $
36.
Agricultural Lime 3 TN $ $
37.
Fertilizer Mixed Grade 0.5 TN $ $
38.
Fertilizer Nitrogen Content 50 LB $ $
39.
Sod 100 SY $ $
40.
Cash Allowances a.
Soils and Concrete Testing Allowance $ 2,500.00
***ADDITIONAL WORK IF ORDERED BY THE ENGINEER***
34.
Removal of Unsuitable Material and Replacement with a.
Crushed Stone 50 CY $ $ b.
Suitable Earth Material 50 CY $ $
BID TOTAL, ITEMS 1 THROUGH 34, INCLUSIVE, THE AMOUNT OF
DOLLARS ($ ).
Bidder acknowledges Unit Prices have been determined in accordance with Paragraph 11.03.C of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
00 41 00 - 6
10/02/23 36432-19
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Bid Bond
B. Statement of Bidders Qualifications
C. Non-Collusion Affidavit of Prime Bidder
D. Corporate Certificate
E. Georgia Security and Immigration Compliance Act Affidavits
F. Contractor's License Certification
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
00 41 00 - 7
10/02/23 36432-19
ARTICLE 9 – BID SUBMITTAL
9.01 This Bid submitted by:
An Individual
Name (typed or printed):
By: (SEAL) (Individual’s signature)
Doing business as:
Attest:
(Notary)
Name (typed or printed):
A Partnership
Partnership Name: (SEAL)
By:
(Signature of general partner – attach evidence of authority to sign)
Name (typed or printed):
Attest:
(Signature of another Partner)
00 41 00 - 8
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By:
(Signature)
Title:
(CORPORATE SEAL)
Attest:
(Signature of Corporate Secretary)
A Joint Venture
Name of Joint Venturer:
First Joint Venturer Name: (SEAL)
By:
(Signature of first joint venture partner)
Title:
Second Joint Venturer Name: (SEAL)
By:
(Signature of second joint venture partner)
Name (typed or printed):
Title:
(Each joint venturer must sign. The manner of signing for each individual partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
00 41 00 - 9
All Bidders shall complete the following:
Bidder’s Business address:
Phone: Facsimile:
Primary Contact:
Primary Contact E-mail:
Submitted on: , 20_____.
This document was prepared in part from material (EJCDC C-410 Suggested Bid Form for Construction Contracts) which is copyrighted as indicated below:
Copyright © 2007 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
Associated General Contractors of America
2300 Wilson Boulevard, Suite 400, Arlington, VA 22201-3308
(703) 548-3118 www.agc.org
The copyright for this EJCDC document is owned jointly by the four EJCDC sponsoring organizations and held in trust for their benefit by NSPE
MILES
REVISIONS
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF PROJECT
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
PREPARED BY:
100% IN CONG. DIST. NO. 3.
TROUP COUNTY AND IS
THIS PROJECT IS 100% IN
01-0001
THE DEPARTMENT OF TRANSPORTATION.
STATE HIGHWAY DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO MEAN
DEPARTMENT ", OR " DEPARTMENT " WHEN THE CONTEXT THEREOF MEANS THE
HIGHWAY DEPARTMENT ", GEORGIA STATE HIGHWAY DEPARTMENT ", " HIGHWAY
WITH THIS DOCUMENT, TO " STATE HIGHWAY DEPARTMENT OF GEORGIA ", "STATE
DOCUMENTS, DRAWINGS, OR PHOTOGRAPHS USED, OR TO BE USED IN CONNECTION
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS, WRITINGS,
NOTE :
SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO
SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THE DEPARTMENT
FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
DALLIS STREET
N/A
N/A
CITY OF LAGRANGE
TROUP COUNTY
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
ROJECT LOCATIONP
STA. 40+95.00
GARFIELD
LIMIT OF CONSTRUCTION
E 2026486.8842 N 1101407.0117
STA. 10+89.33 BROWNWOOD
E 2026537.2017
N 1101407.0984
STA. 11+39.67
BROWNWOOD
END ALIGNMENT
STA. 24+47.00
DALLIS
LIMIT OF CONSTRUCTION
E 2026690.7246
N 1101909.4893
STA. 22+55.00
DALLIS
END PROJECT
E 2026497.7650
N 1101407.0984
STA. 33+00.00
LINCOLN
END ALIGNMENT
STA. 31+70.00
LINCOLN
LIMIT OF CONSTRUCTION
STA. 30+00.00 LINCOLN =
BEGIN ALIGNMENT
BEGIN PROJECT
E 2026398.1137
N 1101416.9520
STA. 10+00.00
BROWNWOOD
BEGIN ALIGNMENT
E 2026358.9867
N 1101819.8000
STA. 40+00.00
GARFIELD
BEGIN ALIGNMENT.
0.126
0.126
0.191
LOCATION SKETCH (N.T.S.)
GARFIELD STREET: LOCAL ROAD
LINCOLN STREET: LOCAL ROAD
DALLIS STREET: MINOR COLLECTOR
FUNCTIONAL CLASS:
STA. 20+16.00
DALLIS/LINCOLN
LIMIT OF CONSTRUCTION
STA. 20+00.00 DALLIS/LINCOLN =
E 2026576.2390 N 1101766.6469
STA. 23+72.36 DALLIS/LINCOLN
STA. 23+72.36 DALLIS=
PLANS COMPLETED 9-20-2023
10/02/2023
INV OUT 719.51 18"CON(S)
TOP 722.08
(SEE GDOT STD. 1033D)
PROP. CATCH BASIN
INV. OUT 721.84 18"CON(E)
TOP 724.23
PROP. CATCHBASIN A-01
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
GRWCOV
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
CONCOV
12/7/2018
DRAWING No.
200 400
SCALE IN FEET
0 100
10-05-2023
DESCRIPTIONDESCRIPTION
INDEX
02-0001
DRAWING NO. DRAWING NO.
LINCOLN STREET - DALLIS STREET
INTERSECTION IMPROVEMENT
COVER SHEET01-0001
02-0001
03-0001
06-0001
08-0001
07-0001
15-0001
16-0001
21-0001
23-0001 TO 23-0006
13-0001 TO 13-0002
24-0001 TO 24-0003
26-0001 TO 26-0002
INDEX
REVISION SUMMARY
GENERAL NOTES
TYPICAL SECTIONS
MAINLINE ROADWAY PLANS
MAINLINE ROADWAY PROFILE
SIDEROAD PROFILES
DRAINAGE AREA MAP
ROADWAY CROSS SECTIONS
UTILITY PLANS
SIGNING AND MARKING PLANS
04-0001 TO 04-0002
54-0001 TO 54-0004
05-0001 TO 05-0002
52-0001 TO 52-0007 EROSION CONTROL LEGEND
BMP LOCATIONS DETAILS
56-0001 TO 56-0003 BMP CONSTRUCTION STANDARDS AND DETAILS
19-0001 TO 19-0002
20-0001 TO 20-0002
CONSTRUCTION STAGING
CONSTRUCTION STAGING DETAILS
SUMMARY OF QUANTITIES
QUANTITIES REQUIRED BY AMENDMENT
QUANTITIES REQUIRED ON CONSTRUCTION
LANDSCAPE PLANS
COVER SHEET
EXISTING CONDITIONS AND DEMOLITION PLAN
SITE LAYOUT PLAN
SITE LANDSCAPE PLAN
OVERALL SITE IRRIGATION PLAN
LANDSCAPE NOTES
LANDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
G0.01
C0.01
L1.00
C1.00
L2.00
L3.00
I1.00
L7.00
L7.01
L7.02
L7.03
GENERAL NOTES
GRADING AND DRAINAGE PLANC2.00
C2.10
C3.00
C3.10
STORM PROFILES
EROSION CONTROL PLAN
EROSION CONTROL DETAILS
C4.00
C4.10
C4.20
SITE DETAILS (1)
SITE DETAILS (2)
SITE DETAILS (3)
C4.30 SITE DETAILS (4)
SITE MATERIALS AND FURNISHINGS PLAN
10/02/23
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
REVISION
REVISION SUMMARY
03-0001
DRAWING NO.DATE DATE DRAWING NO. REVISION
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
C1.00
C2.00
C2.10
C3.00
C3.10
C4.00
C4.10
C4.20
C4.30
G0.01
01-0001
02-0001
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23
10/02/23 SHEET ADDED
COMPLETION DATE ADDED
I1.00
L3.00
L2.0010/02/23
10/02/23
10/02/23 NOTE ADDED
ITEM ROTATED
UPDATED NOTE
INDEX REVISED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
SHEET ADDED
INDEX REVISED
10/02/23
10/02/23 06-0001 QUANTITIES 610-6515, 653-1502, 165-0105 REVISED
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
SUMMARY OF QUANTITIES
SUMMARY QUANTITIES
06-0001
INTERSECTION IMPROVEMENT
LINCOLN STREET - DALLIS STREET
10/02/23
REVISION DATES
DATE$$$
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
LANDSCAPE IMPROVEMENTS
LINCOLN STREET - DALLIS STREET
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T
LA
N D
SC
AP
E
IM
PR
O
VE
M
EN
TS
C
IT
Y O
F
LA
G R
AN
G
E, G
A
G0.01
CITY OF LAGRANGE, GA
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
U
SE
R :O
G H
AR
TN
ES
S
FI
LE
:F :\3
6\
2\
9\
_C
AD
\T
R N
S\
LA
N D
\P
LO
T\
9_ G
0.
.d w g
PL
O
TT
ED
:1 0/
4/
SA
VE
D
:9 /1
5/
CITY OF
MEG KELSEY, CITY MANAGER
WILLIE EDMONDSON, MAYOR
VICINITY MAP
N.T.S.
SITE
LAGRANGE, GA
PROJECT TEAM
OWNER
CITY OF LAGRANGE
200 RIDLEY AVENUE
LaGRANGE, GA 31902 706-883-2013
CONTACT: MEG KELSEY, CITY MANAGER
CIVIL ENGINEER & LANDSCAPE ARCHITECT
BARGE DESIGN SOLUTIONS
1201 FRONT AVENUE, SUITE F
COLUMBUS, GEORGIA, 31901
PHONE: (706) 321-4583
CONTACT: DAVID BISHOP, PE
1201 Front Avenue // Suite F // Columbus, GA 31901 Phone (706) 321-4590
3643219 PROJECT No.
SEPTEMBER 2023
SHEET INDEX
SHEET TITLE
G0.01 COVER SHEET
C0.01 EXISTING CONDITIONS AND DEMOLITION PLAN
L1.00 SITE LAYOUT PLAN
C1.00 GENERAL NOTES
C2.00 GRADING AND DRAINAGE PLAN
C2.10 STORM PROFILES
C3.00 EROSION CONTROL PLAN
C3.10 EROSION CONTROL DETAILS
C4.00 SITE DETAILS (1)
C4.10 SITE DETAILS (2)
C4.20 SITE DETAILS (3)
C4.30 SITE DETAILS (4)
L2.00 SITE MATERIALS AND FURNISHINGS PLAN
L3.00 SITE LANDSCAPE PLAN
I1.00 OVERALL SITE IRRIGATION PLAN
L7.00 LANDSCAPE NOTES
L7.01 LANDSCAPE DETAILS
L7.02 HARDSCAPE DETAILS
L7.03 HARDSCAPE DETAILS
720720
725 725 725
720720
725 725 725
FILE NO.
I1.00 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
I1 .0
0.
dw g
PL
O
TT
ED
:1 0/
2/
SA
VE
D
:1 0/
2/
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N O
VE
R
AL
L
SI
TE
IR
R
IG
AT
IO
N
P
LA
N
IRRIGATION LEGEND:
AREAS TO BE IRRIGATED
IRRIGATION NOTES:
1. IRRIGATION PLANS ARE NOT INCLUDED AS PART OF THESE
LANDSCAPE PLANS. IRRIGATION PLANS AND SPECIFICATIONS
ARE TO BE SUBMITTED BY SUBCONTRACTOR AND APPROVED BY
LANDSCAPE ARCHITECT AND OWNER. SEE AREAS TO BE
IRRIGATED ON THIS SHEET.
2. THE PROPOSED AREA OF IRRIGATION IS TO BE ALL LANDSCAPE
BEDS & TREES.
3. ALL PRODUCTS SHALL HAVE CUT SHEETS SUBMITTED TO THE
LANDSCAPE ARCHITECT PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. CONTRACTOR TO SUBMIT DETAILED IRRIGATION LAYOUT PLANS
TO LANDSCAPE ARCHITECT INDICATING:
A. LOCATION, TYPE AND COVERAGE OF HEADS (SPRAY ARC)
B. ZONE MAP WITH FLOW RATES
C. DETAILED IRRIGATION PROGRAMMING SCHEDULE TO
ENSURE MAXIMUM PERFORMANCE OF THE SYSTEM.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING GPM
RATE AND PSI FOR SYSTEM CALCULATIONS.
6. PROPOSED IRRIGATION SYSTEM SHALL PROVIDE COMPUTER
CONTROLLER TO BE APPROVED BY LANDSCAPE ARCHITECT.
7. IRRIGATION CONTROLLER TO BE EQUIPPED WITH SMART
WEATHER STATION.
8. ALL IRRIGATION IS TO BE DRIP IRRIGATION OR SPRAY AS
NEEDED.
9. ALL NEWLY INSTALLED PLANT MATERIALS SHALL BE FULLY
IRRIGATED TO ENSURE PLANT HEALTH AND GROWTH SUCCESS.
10. THE IRRIGATION CONTRACTOR SHALL COORDINATE LAYOUT AND
INSTALLATION WITH THE GENERAL CONTRACTORS ON THE SITE.
STRUCTURES OR PAVEMENT NOTED ON THE PLAN, BUT NOT IN
PLACE, SHOULD BE STAKED. THE IRRIGATION SYSTEMS SHOULD
NOT INTERFERE WITH FUTURE PLACEMENT OF THESE PAVED
SURFACES OR STRUCTURES.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY
CONSTRUCTION PERMITS AND FEES.
12. CONTRACTOR SHALL INSTALL 4" SCHEDULE 40 PVC PIPE
SLEEVES A MINIMUM DEPTH OF 18" BELOW FINISH GRADE. CAP
ENDS AND EXTEND SLEEVES 2'-0" BEYOND EDGE OF PAVEMENT.
LAY HEAVY DUTY SLEEVES IN 3" GRAVEL BED MINIMUM.
BACKFILL WITH GRAVEL AND COMPACT. TO WITHSTAND URBAN
CONDITIONS. SLEEVES SHALL BE INSTALLED BY IRRIGATION
CONTRACTOR. REFERENCE DIAGRAMMATIC SLEEVING PLAN ON
THIS SHEET FOR SUGGESTED LOCATION OF SLEEVES. ADD
ADDITIONAL SLEEVES AS NEEDED.
13. GENERAL CONTRACTOR SHALL PROVIDE 120-VOLT POWER
SOURCE FOR CONTROLLER. CONTROLLER LOCATION AND
MOUNTAIN TO BE COORDINATED WITH OWNER.
14. INSTALL ADDITIONAL AUTOMATIC DRAIN VALVES AS REQUIRED
TO DRAIN ALL LINES FOR PROTECTION AGAINST WINTER FREEZE
DAMAGE. LOCATE MANUAL DRAIN VALVES AT LOW POINT ON
MAIN. ALL WATER FLUSHED FROM THE SYSTEM SHALL BE
DIRECTED IMMEDIATELY INTO SITE DRAINS. IRRIGATION WATER
SHALL NOT ENTER CURB OR STREET DRAINS.
15. 24V WIRING TO BE MINIMUM AWG 12/1, SUITABLE FOR DIRECT
BURIAL PER CODE, COLOR CODED. BURY WITH SLACK, BENEATH
OR ADJACENT TO PIPE FOR PROTECTION. SPLICE WITH SHEARS
MODEL DS-100 DRI-SPLICE, OR APPROVED EQUAL.
16. INSTALL AUTOMATIC CONTROL VALVES IN AMETEK VALVE BOXES
OF APPROPRIATE SIZE, VB-10 OR VB-12, OR APPROVED EQUAL.
17. COMPLETE WORK IN COMPLIANCE WITH LOCAL AND STATE
CODES FOR USE OF RECLAIMED WATER. PROVIDE ALL
NECESSARY PERMITS AT THE COST OF THE IRRIGATION
CONTRACTOR.
18. UPON COMPLETION OF IRRIGATION SYSTEM, CONTRACTOR
SHALL TEST AND ADJUST SYSTEM WITH LANDSCAPE ARCHITECT
PRESENT PRIOR TO BURYING LINES.
19. CONTRACTOR TO MAKE 1 MONTH, 6 MONTH AND 9 MONTH
MAINTENANCE VISITS WITH OWNER TO VERIFY ADEQUATE
PERFORMANCE AND OPERATION OF SYSTEM. IF DEFICIENT,
NECESSARY ADJUSTMENTS TO BE MADE AT NO COST.
20. DISCREPANCIES BETWEEN THE FIELD LAYOUT AND CONTRACT
DOCUMENTS SHOULD BE REPORTED AS SOON AS POSSIBLE TO
THE OWNER AND LANDSCAPE ARCHITECT IN CASE REVISIONS
ARE NECESSARY. INADEQUATE IRRIGATION COVER SHOULD BE
NOTED AND CORRECTED BEFORE THE IRRIGATION CONTRACTOR
LEAVES THE SITE.
21. CONTRACTOR TO COORDINATE ALL METER AND BACKFLOW
INFORMATION, LOCATION, AND SIZE. A BOOSTER PUMP SHALL
BE SUPPLIED AS NECESSARY TO PROVIDE ADEQUATE
PRESSURE.
SLEEVING (TYP.)
C M
CONTROLLER, METER, AND
WATER CONNECTION TO BE
COORDINATED WITH OWNER,
SEE NOTES THIS SHEET
G
AR
FI
EL
D S
TR
EE
T
DALLIS STREET
BR
O
W N
W O
O D
A
VE
N U
E
LINCOLN
STREET
CONTRACTOR TO PROVIDE AT
MINIMUM 2 HOSE PIPE
CONNECTIONS FOR FUTURE
WATER ACCESS
DALLIS ST./LINCOLN ST.
WATER METER BOX/VALVE TO BE
RELOCATED BY IRRIGATION
CONTRACTOR AS NECESSARY TO
ACCOMODATE PROPOSED
IMPROVEMENTS
G H
PL
D
/0
2/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
.1
725 725 725
720720
725 725 725
D
D
UCTI
LE
IR
ON
R A I N S T O
WA
TE
RW
A
YS
NY
L O P L A S T
DO
NOTPOLLUTE
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
D
D
UCTILEIRON
R A
IN S
T O
W A T E RW AY S
NYLOPLAST
DO
N O T P
OL
LU
T E
D
D
UCTI
LE
IR
ON
R A I N S T O
WA
TE
RW
A
YS
NY
L O P L A S T
DO
NOTPOLLUTE
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
D
D
UCTILEIRON
R A
IN S
T O
W A T E RW AY S
NYLOPLAST
DO
N O T P
OL
LU
T E
SF-101
SF-101
SF-101
SF-104
SF-104
SF-102
SF-103
SF-103
SF-103
L7.02
SYMBOL DESCRIPTION DETAIL
BROOM FINISH CONCRETE 1/L7.02
CONCRETE PAVER 6/L7.02
SLATESCAPE AGGREGATE 8/L7.02
SYMBOL DESCRIPTION DETAIL
TRASH RECEPTACLE 1/L7.03
BIKE RACK 2/L7.03
CURVED SEAT WALL 9/L7.02
STRAIGHT SEAT WALL 9/L7.02
SF-101
SF-102
SF-103
SF-104
FILE NO.
L2.00 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
L2 .0
0.
dw g
PL
O
TT
ED
:1 0/
2/
SA
VE
D
:1 0/
2/
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
SI
TE
M
AT
ER
IA
LS
A N
D F
U R
N
IS
H
IN
G S
PL
AN
SITE FURNISHING NOTES:
1. THE CONTRACTOR IS TO PROVIDE THE FOLLOWING SUBMITTALS:
A. ALL MANUFACTURER'S DATA INCLUDING DIRECTIONS OR
RECOMMENDATIONS FOR INSTALLATION, METHODS,
PROCEDURES AND MAINTENANCE.
B. COMPLETE SHOP DRAWINGS FOR ALL SITE FURNISHINGS
INDICATING ALL DETAILS OF FABRICATION AND
INSTALLATION INCLUDING SIZES, SHAPES, FINISHES,
COLORS, THICKNESS, MATERIAL QUALITY AND ALL OTHER
RELATED WORK APPLICABLE TO THE SITE FURNISHINGS.
C. SUBMIT COLOR SAMPLES FOR APPROVAL.
2. ALL SPECIFIED PRODUCTS ARE TO BE PROVIDED AS SPECIFIED
OR “APPROVED EQUIVALENT”.
A. ALL REFERENCES TO VENDORS AND “APPROVED
MANUFACTURERS” ARE INCLUDED FOR DESCRIPTION OF
QUALITY AND CONTENT OF THE DESIGNATED
EQUIPMENT/MATERIALS AS BASIS OF DESIGN.
EQUIVALENT ITEMS MAY BE ACCEPTED IF THEY MEET ALL
STANDARDS OF QUALITY AND PURPOSE FOR THE
INTENDED USE, AS DETERMINED BY THE COUNTY.
B. PROPOSED SUBSTITUTIONS OF PRODUCTS SHALL BE
EVALUATED BASED ON PRODUCT CONSTRUCTION,
APPEARANCE AND PERFORMANCE. THE CONTRACTOR
WILL BE RESPONSIBLE FOR SUBMITTING ALL
DOCUMENTATION SUPPORTING PROPOSED PRODUCTS
NOT LESS THAN 30 DAYS AFTER NOTICE TO PROCEED OF
PROJECT. THE ACCEPTANCE OR REJECTION OF
PRODUCTS OFFERED AS EQUAL OR SUBSTITUTION SHALL
BE AT THE SOLE DISCRETION OF THE OWNER'S
REPRESENTATIVE. IF THE COUNTY DETERMINES THAT
THE EQUIVALENT SUBMITTED IS NOT AN EQUAL BY
MATERIAL, QUALITY WARRANTY OR ETC.; THE
CONTRACTOR SHALL PROVIDE SPECIFIED FURNISHINGS
LISTED WITHIN THE CONTRACT DOCUMENTS. NO SECOND
SUBMITTAL OF PROPOSED EQUIVALENT WILL BE
REVIEWED OR ACCEPTED.
3. DELIVER ALL MATERIALS WITH MANUFACTURER'S TAGS AND
LABELS INTACT IN CLEAN, DRY AND PROTECTED LOCATIONS.
4. STORE AND HANDLE ALL SITE FURNISHINGS SO AS TO AVOID
DAMAGE.
5. ALL SITE FURNISHINGS SHALL BE PROVIDED BY THE
CONTRACTOR INCLUDING ORDERING, SHIPPING, DELIVERY,
UNPACKING, AND INSTALLING ACCORDING TO MANUFACTURER'S
SPECIFICATIONS AND AS DETAILED ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY INSTALLATION PROCEDURE WITH
THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLING.
6. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S
REPRESENTATIVE THE DELIVERY OF ALL SITE FURNISHINGS AND
SHALL BE COMPLETELY RESPONSIBLE FOR SHIPPING,
UNPACKING, REMOVING PACKAGING, DISCARDING PALLET AND
PACKAGING MATERIALS, AND ALL HANDLING AFTER DELIVERY
TO PLACE SITE FURNISHINGS IN LOCATIONS DESIGNATED ON
THE PLANS.
7. ALL SITE FURNISHINGS LOCATIONS ARE TO BE APPROVED BY
OWNER'S REPRESENTATIVE PRIOR TO BEING PLACED ON SITE.
8. ALL SITE FURNISHINGS SHALL BE GUARANTEED BY THE
CONTRACTOR FREE OF DEFECTS, CRACKS, CHIPS, STAINS AND
SHALL BE COMPLETELY CLEAN AND FREE OF DAMAGES UPON
FINAL PLACEMENT AND APPROVAL.
9. THE GENERAL CONTRACTOR SHALL SUPPLY A LIST OF SITE
FURNISHING WITH QUANTITIES TO THE OWNER'S
REPRESENTATIVE PRIOR TO ORDERING. QUANTITIES ON THE
PLAN SHALL OVERRULE ANY LISTS (IF APPLICABLE) STATED ON
THIS SHEET.
SITE FURNISHING LEGEND:
SITE MATERIALS LEGEND:
SIGNAGE AND SIGN LIGHTING
- NOT IN CONTRACT,
PROVIDED BY OTHERS
FOUNTAIN, SEE
DETAIL 3/L7.03
G
AR
FI
EL
D S
TR
EE
T
DALLIS STREET
BR
O
W N
W O
O D
A
VE
N U
E
LINCOLN
STREET
NOTES:
1. SEE SHEET L.300 FOR LANDSCAPE LAYOUT
2. SEE SHEET L7.02-L7.03 FOR HARDSCAPE DETAILS
3. FOUNTAIN LIGHTING TO BE FL-12-RGBW BY PROECO PRODUCTS.
316 STAINLESS STEEL FRONT COVER & HOUSING, 12 WATTS, SIZE 3"
W x 3.1"H TEMPERED GLASS (3MM THICK). OPERATING CURRENT 24V
DC WITH CONSTANT CURRENT LED DRIVER. LENS - CLEAR, BEAD,
FROSTED. BEAM ANGLE 30 DEGREES. CABLE LENGTH TO BE
SPECIFIED UPON ORDER. IP-68 RATING. SURFACE MOUNTED
SYSTEM.
L7.02
SEE PAVER AS ADD ALTERNATE ITEM. PROVIDE INTEGRAL
COLORED STAMPED CONCRETE WITH SOLDIER COURSE
(COLOR CHARCOAL) AND HERRINGBONE PATTERN (COLOR
BURNT AMBER) - SUBMIT SHOP DRAWINGS FOR APPROVAL
PROVIDE 4 FOUNTAIN LIGHTS
SEE NOTES THIS SHEET
DALLIS ST./LINCOLN ST.
G H
PL
D
/0
2/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
725 725 725
D
D
UCTIL
E
IRO
N
R A I N S T O
WA
TE
R
W A
YS
NY
L O P L A S T
DO
NOTPOLLUTE
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
D
D
U
CTILEIRON
R A I
NS
TO
WA T E RW AY S
NYLOPLAST
DO
N O T P
OL
L U
TE
D
D
UCTIL
E
IRO
N
R A I N S T O
WA
TE
R
W A
YS
NY
L O P L A S T
DO
NOTPOLLUTE
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
DU
CT
ILE
IR
ON
DO
N
OT
P
OL
LU
TE
D
RA
IN
S
TO
W
AT
ER
W
AY
S
NY
LO
PL
AS
T
D
D
U
CTILEIRON
R A I
NS
TO
WA T E RW AY S
NYLOPLAST
DO
N O T P
OL
L U
TE
720720
725 725 725
CS2
IVM8
DVJ17
IVM7
ARC9
DVJ15
ARC19
CAC26
CS3
HSO19
HSO79
CAC15
ARC26
AF1
HSO24
CAC9
ARC9
HSO27
AF1AJ1
LI3
TAS104
TD1
HSO68
HSO27
115 SF RIVER ROCK (4"-6")
TREES QTY BOTANICAL NAME COMMON NAME CONDITION SIZE HEIGHT COMMENTS
AJ 1 Acer japonicum 'Mai Kujaku' Dancing Peacock Japanese Maple 15 Gal. 1.5" Cal. 8`-10` HT. Straight dominant leader, Full crown, Well branched AF 2 Acer x freemanii 'Celebration' Celebration Maple Cont./B&B 2"-2 1/2" Cal. 12`-14` HT. Straight dominant leader, Full crown, Well branched CS 5 Camelia Sasanqua 'Yuletide' Sasanqua Camelia Cont./B&B 5`-6` HT. Straight dominant leader, Full crown, Well branched LI 3 Lagerstroemia indica x fauriei 'Natchez' Natchez Crape Myrtle Cont./B&B Multi-stemmed 1"Cal. 8`-10` HT. Multi-stemmed, 3-4 canes TD 1 Taxodium distichum 'Lindsey's Skyward' Lindey's Skyward Bald Cypress Cont./B&B 2"-2 1/2" Cal. 12`-14` HT. Straight dominant leader, Full crown, Well branched
SHRUBS QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS
ARC 64 Abelia x `Rose Creek` Rose Creek Abelia Container 3 GAL. As Shown Full, Dense, Well rooted in pot DVJ 32 Distylium x 'Vintage Jade' Vintage Jade Distylium Container 3 GAL. As Shown Full, Dense, Well rooted in pot IVM 15 Itea virginica 'Merlot' Merlot Sweetspire Container 3 Gal. As Shown Full, Dense, Well rooted in pot
GRASSES QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS
CAC 50 Calamagrostis x acutiflora 'Karl Foerster' Karl Foerster Grass Container 3 Gal. As Shown Full, Dense, Well rooted in pot
SEASONAL DRY-STACK ROCK QTY BOTANICAL NAME COMMON NAME CONDITION SIZE SPACING COMMENTS ROCK 115 sf Seasonal Dry-Stack Rock .
GROUND COVERS QTY BOTANICAL NAME COMMON NAME CONDITION COMMENTS COMMENTS
HSO 244 Hemerocallis x 'Stella de Oro' Stella de Oro Daylily #1 15" O.C.
TAS 81 Trachelospermum asiaticum Asiatic Jasmine SP4 12" O.C.
ZOJ 1,341 sf Zoysia japonica `El Toro` El Toro Zoysia Grass Sod SF
PLANT SCHEDULE
FILE NO.
L3.00 3643219
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F ro nt A ve nu e
Su ite
F
C ol um bu s, G
A
PH
O
N E
(7
) 3
-4
U
SE
R :P
LD
AR
R
FI
LE
:F
:\3 6\
2\
9\
_C
AD
\T R
N S\
LA
N
D \P
LO
T\
9_
L3 .0
0.
dw g
PL
O
TT
ED
:1 0/
2/
SA
VE
D
:1 0/
2/
Know what'sbelow Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
LI
N
C O
LN
S
TR
EE
T
- D
AL
LI
S
ST
R
EE
T C
IT
Y
O F
LA
G
R
AN
G E, G A
LA
N
D
SC
AP
E
IM
PR
O
VE
M
EN
TS
PL
D
G H
/2
0/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
SI
TE
L
AN
D
SC
AP
E
PL
AN
PLANT SCHEDULE
L3.00
G
AR
FI
EL
D S
TR
EE
T
DALLIS STREET
BR
O
W N
W O
O D
A
VE
N U
E
LINCOLN
STREET
NOTES:
1. SEE ALL DISTURBED AREAS OUTSIDE LIMITS OF WORK THAT ARE
NOT DESIGNATED MULCH OR LANDSCAPE AREAS.
2. SEE SHEET L2.00 FOR SITE MATERIALS AND FURNISHINGS PLAN.
3. SEE SHEET L7.01 FOR LANDSCAPE DETAILS.
DALLIS ST./LINCOLN ST.
G H
PL
D
/0
2/
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N R
EV
FILE NO.
C1.00
3643219
C H
K
D R
D
A T
E D
E S
C R
I P
T I O
N R
E V
Copyright 2023, Barge Design Solutions, Inc. ALL RIGHTS RESERVED
F r o n t
A v e n u e
S u i t e
F
C o l u m b u s
G
A
P H
O N
E
U S
E R
R
A H
A L L
F I L E
F
C
A D
T
R N
S L A
N D
P
L O
T C d w g
P L O
T T
E D
S A
V E
D
Know what'sbelow
Callbefore you dig.
www.call811.com
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
R E
V I S
I O
N
I N
F O
R M
A T
I O
N
L I N
C O
L N
S
T R
E E
T
D
A L
L I
R
E E
T
C I T
Y
O
F
L A
G R
A N
G E
G
A
L A
N D
S C
A P
E
I M
P R
O V
E M
E N
T S
P L
D G
H
I S
S U
E D
O R
C
N
S T
R U
C T
I O
N
G E
N E
R A
L
N
O T
E S
GENERAL GRADING AND STORM DRAINAGE NOTES:
PIPE NOTES:
1. IF USING HDPE: HDPE PIPE SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M-294
AND AASHTO MP7, TYPE S&D. CONNECTION SHALL USE A RUBBER GASKET, WHICH
CONFORMS TO ASTM F-47. INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM
RECOMMENDED PRACTICE D-2321, AASHTO SECTION 30, OR WITH SECTION 550 OF THE
GEORGIA DOT STANDARD SPECIFICATION CONSTRUCTION OF ROAD AND BRIDGES,
2. IF USING RCP PIPE ALL RCP PIPE JOINTS SHALL BE BELL & SPIGOT TYPES WITH RUBBER
GASKET CONFORMING TO ASTM C-443. THE PIPE SHALL BE MANUFACTURED IN
ACCORDANCE WITH AASHTO M-170 AND/OR ASTM C-76. CLASS OF PIPE AND WALL
THICKNESS SHALL BE IN ACCORDANCE WITH 1030-D, GA. DOT SPECIFICATION, TABLE
NO. 1. INSTALLATION SHALL BE IN ACCORDANCE WITH SECTION 550 OF THE GEORGIA
DOT DOT STANDARD SPECIFICATIONS, CONSTRUCTION OF ROAD AND BRIDGES.
HDPE PIPE REQUIREMENTS
1. HDPE PIPE N-12 ST IB PIPE (PER AASHTO) SHALL HAVE A SMOOTH INTERIOR AND
ANNULAR EXTERIOR CORRUGATIONS.
2. 4-10 INCH (100 TO 250 MM) SHALL MEET AASHTO M252, TYPE S.
3. 12-60 INCH (300 TO 1500 MM) SHALL MEET AASHTO M294, TYPE S OR ASTM F2306.
4. MANNING’S “N” VALUE FOR USE IN DESIGN SHALL BE 0.012.
STORM SEWER PIPE INSTALLATION NOTES:
JOINT PERFORMANCE
PIPE SHALL BE JOINED USING A BELL & SPIGOT JOINT MEETING AASHTO M252, AASHTO M294, OR
ASTM F2306. THE JOINT SHALL BE SOIL-TIGHT AND GASKETS, WHEN APPLICABLE, SHALL MEET
THE REQUIREMENTS OF ASTM F477. GASKETS SHALL BE INSTALLED BY THE PIPE
MANUFACTURER AND COVERED WITH A REMOVABLE WRAP TO ENSURE THE GASKET IS FREE
FROM DEBRIS. A JOINT LUBRICANT SUPPLIED BY THE MANUFACTURER SHALL BE USED ON THE
GASKET AND BELL DURING ASSEMBLY.
FITTINGS
FITTINGS SHALL CONFORM TO AASHTO M252, AASHTO M294 OR ASTM F2306. BELL AND SPIGOT
CONNECTIONS SHALL UTILIZE A SPUN-ON OR WELDED BELL AND VALLEY OR SADDLE GASKET
MEETING THE SOIL-TIGHT JOINT PERFORMANCE REQUIREMENTS OF AASHTO M252, AASHTO
M294 OR ASTM F2306
MATERIAL PROPERTIES
VIRGIN MATERIAL FOR PIPE AND FITTING PRODUCTION SHALL BE HIGH DENSITY POLYETHYLENE
CONFORMING WITH THE MINIMUM REQUIREMENTS OF CELL CLASSIFICATION 424420C FOR 4-
THROUGH 10-INCH (100 TO 250 MM) DIAMETERS, OR 435400C FOR 12- THROUGH 60-INCH (300 TO
1500 MM) DIAMETERS, AS DEFINED AND DESCRIBED IN THE LATEST VERSION OF ASTM D3350, EXCEPT THAT CARBON BLACK CONTENT SHOULD NOT EXCEED 4%. THE 12- THROUGH 60-INCH
(300 TO 1500 MM) VIRGIN PIPE MATERIAL SHALL COMPLY WITH THE NOTCHED CONSTANT
LIGAMENT-STRESS (NCLS) TEST AS SPECIFIED IN SECTION 9.5 AND 5.1 OF AASHTO M294 AND
ASTM F2306 RESPECTFULLY.
INSTALLATION
INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321 AND ADS’S PUBLISHED
INSTALLATION GUIDELINES, WITH THE EXCEPTION THAT MINIMUM COVER IN TRAFFICKED AREAS
FOR 4 - THROUGH 48-INCH (100 TO 1200 MM) DIAMETERS SHALL BE ONE FOOT (0.3 M), AND FOR
54- AND 60-INCH (1350 AND 1500 MM) DIAMETERS, SHALL BE 2 FT (0.6 M) IN SINGLE RUN
APPLICATIONS. BACKFILL FOR MINIMUM COVER SITUATIONS SHALL CONSIST OF CLASS 1, CLASS
2 (MINIMUM 90% SPD) OR CLASS
3 (MINIMUM 90% SPD) MATERIAL. MAXIMUM FILL HEIGHTS DEPEND ON EMBEDMENT MATERIAL
AND COMPACTION LEVEL; PLEASE REFER TO TECHNICAL NOTE 2.01. CONTACT YOUR LOCAL ADS
REPRESENTATIVE OR VISIT OUR WEBSITE AT WWW.ADS-PIPE.COM FOR A COPY OF THE LATEST
INSTALLATION GUIDELINES.
MANHOLE REQUIREMENTS
1. PRECAST CONCRETE MANHOLE BARREL AND ECCENTRIC TOP SECTIONS SHALL
CONFORM TO SPECIFICATIONS FOR PRECAST REINFORCED CONCRETE MANHOLE
SECTIONS, ASTM DESIGNATION C478, EXCEPT AS OTHERWISE SPECIFIED BELOW. THE
METHOD OF CONSTRUCTION SHALL CONFORM TO THE DRAWINGS AND THE FOLLOWING
ADDITIONAL REQUIREMENTS:
2. BARREL SECTIONS SHALL HAVE TONGUE AND GROOVE JOINTS. JOINTS SHALL HAVE
ROUND RUBBER GASKETS SET IN SPECIALLY PROVIDED INDENTION. THE ROUND RUBBER
"O"-RING GASKET SHALL CONFORM TO ASTM C443 STANDARD SPECIFICATIONS. FLEXIBLE
PLASTIC GASKETS (RAM-NEK OR EQUAL) MEETING FEDERAL SPECIFICATIONS SS-S210A
"SEALING COMPOUND, PREFORMED PLASTIC FOR PIPE JOINTS", TYPE I, ROPE FORM AND
AASHTO DESIGNATION M-198 751, TYPE B, FLEXIBLE PLASTIC GASKET (BITUMEN) ARE
ALSO ACCEPTABLE.
3. TYPE I CEMENT SHALL BE USED, EXCEPT AS OTHERWISE APPROVED.
4. THE DATE OF MANUFACTURE AND THE NAME OR TRADEMARK OF THE MANUFACTURER
SHALL BE CLEARLY MARKED ON THE INSIDE OF EACH PRECAST SECTION. EACH SECTION
OF THE MANHOLE MUST BE INSPECTED AND STAMPED BY AN ACCREDITED TESTING
LABORATORY.
5. SECTIONS SHALL BE CURED BY AN APPROVED METHOD FOR AT LEAST 28 DAYS.
6. TOP SECTIONS SHALL BE ECCENTRIC EXCEPT PRECAST CONCRETE SLABS SHALL BE
USED WHERE COVER OVER THE TOP OF THE PIPE IS LESS THAN FOUR FEET FOR ALL
MANHOLES.
7. PRECAST CONCRETE SLABS OVER TOP SECTION, WHERE REQUIRED, SHALL BE CAPABLE
OF SUPPORTING THE OVERBURDEN PLUS A LIVE LOAD EQUIVALENT TO AASHTO H-20
LOADING.
8. MANHOLE STEPS SHALL BE CAST INTO THE PRECAST SECTIONS AND SHALL CONFORM TO
ASTM SPECIFICATION C478. STEPS SHALL BE PLASTIC STEP BY M. A. INDUSTRIES, INC., OR
EQUAL.
9. HOLES IN PRECAST SECTIONS TO RECEIVE SEWER PIPE SHALL BE PRECAST AT THE
FACTORY AT THE REQUIRED LOCATIONS. ALL PRECAST HOLES SHALL HAVE KOR-N-SEAL
(OR EQUAL) RUBBER BOOTS.
10. THE TOPS OF BASES SHALL BE SUITABLY SHAPED TO MATE WITH THE PRECAST BARREL
SECTION.
11. CAST IRON FRAMES AND COVERS SHALL BE EAST JORDAN IRON WORKS MODEL V-1480,
STANDARD; V-2480, BOLTDOWN WATERTIGHT; U.S. FOUNDRY MODEL 360-E, STANDARD;
360-E/ORS, BOLTDOWN WATERTIGHT; OR EQUAL.
12. MANHOLES AND OTHER PRECAST STRUCTURES SHALL BE CONSTRUCTED TO THE
DIMENSIONS AS SHOWN ON THE DRAWINGS AND AS SPECIFIED IN THESE
SPECIFICATIONS.
13. THE BASE SHALL BE CAST-IN-PLACE CONCRETE PLACED ON A THOROUGHLY COMPACTED
GRAVEL SUB-BASE. THE TOPS OF THE CAST-IN-PLACE BASES SHALL BE SHAPED TO MATE
WITH THE PRECAST BARREL SECTION, AND SHALL BE ADJUSTED TO FINISH OR SPECIFIED
GRADE.
14. PRECAST BASES, CONFORMING TO ALL REQUIREMENTS OF ASTM C478 AND ABOVE
LISTED REQUIREMENTS FOR PRECAST SECTIONS, MAY BE USED.
15. PRECAST CONCRETE STRUCTURE SECTIONS SHALL BE SET TO BE VERTICAL AND WITH
SECTIONS IN TRUE ALIGNMENT WITH A 1/4" MAXIMUM TOLERANCE TO BE ALLOWED.
16. HOLES IN THE CONCRETE PIPE SECTIONS REQUIRED FOR HANDLING OR OTHER
PURPOSES SHALL BE PLUGGED WITH A NON-SHRINKING GROUT.
17. WHERE HOLES MUST BE CUT IN THE PRECAST SECTIONS TO ACCOMMODATE PIPES,
CORING SHALL BE DONE PRIOR TO SETTING THEM IN PLACE.
18. CAST IRON FRAMES SHALL BE PLACED, SHIMMED, AND SET IN PORTLAND CEMENT
MORTAR TO THE REQUIRED GRADE. NO MORE THAN THREE COURSES OF LEVELING
RINGS SHALL BE USED.
EROSION CONTROL NOTES
1. NO VEGETATION IS TO BE DISTURBED EXCEPT AS NECESSARY FOR GRADING PURPOSES.
2. TOPSOIL IS TO BE STRIPPED FROM ALL CUT AND FILL AREAS, STOCKPILED, AND
REDISTRIBUTED OVER GRADED AREAS TO A MINIMUM DEPTH OF 6". THE SOIL IS TO BE
STOCKPILED IN THE LOCATIONS AS DESIGNATED BY THE OWNER.
3. ALL GRADED AREAS INCLUDING 3:1 SLOPES ARE TO BE STABILIZED WITH GEO-TEXTILE
MATTING WITHIN 7 DAYS OF FINAL GRADING. ANY AREAS LEFT UNDISTURBED FOR 7 DAYS
SHALL HAVE ADEQUATE STABILIZATION.
4. ALL DIMENSIONS AND LOCATIONS OF TEMPORARY SOIL EROSION AND WATER POLLUTION
CONTROL DEVICES SHALL BE SUBJECT TO ADJUSTMENT AS DESIGNATED BY THE ENGINEER.
5. WHEN THE TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL DEVICES ARE NO
LONGER REQUIRED FOR THE INTENDED PURPOSE, IN THE OPINION OF THE ENGINEER, THEY
SHALL BE REMOVED.
6. NO WORK IS TO BE STARTED UNTIL MANDATORY PRE-CONSTRUCTION MEETING WITH THE
OWNER.
7. INSTALL SILT FENCE AROUND THE BASE OF ANY STOCK PILES.
8. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA,
THE EQUIPMENT MAINTENANCE AND CLEANING AREA, CONTRACTOR'S EMPLOYEE PARKING
AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, CONCRETE TRUCK WASHOUT AREA,
OFFICE TRAILERS, AND TOILET FACILITIES. CONTRACTOR TO COORDINATE EXACT LOCATION
WITH PROJECT ENGINEER AND CITY ENGINEER DURING PRECONSTRUCTION MEETING.
9. ALL UNDISTURBED AREAS INCLUDING WETLAND/STREAM BUFFERS, SHALL BE FIELD MARKED
AND KEPT FREE OF CONSTRUCTION EQUIPMENT.
10. CURRENT VERSIONS OF THE STORM WATER POLLUTION PREVENTION PLAN, NOTICE OF
INTENT, AND NOTICE OF COVERAGE SHALL BE KEPT ON SITE AND IS TO BE ACCESSIBLE FOR
THE DURATION OF THE PROJECT.
11. APPLY PERMANENT GEO-TEXTILE MATTING WHENEVER GRADING OPERATIONS ARE
COMPLETED AND ALL CONSTRUCTION OPERATIONS WILL NOT IMPACT THE DISTURBED
AREA. APPLY PERMANENT GEO-TEXTILE MATTING TO ALL NON-CONSTRUCTION AREAS THAT
SHOW SIGNS OF EXCESSIVE EROSION.
12. EROSION CONTROL DEVICES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH
GSWCC'S EROSION AND SEDIMENT CONTROL HANDBOOK AND GSWCC'S CONSTRUCTION
ACTIVITY PERMIT REQUIREMENTS. THE DEVICES SHOWN ON THE DRAWINGS ARE THE
MINIMUM REQUIRED. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL
DEVICES AS NEEDED.
13. CONTRACTOR TO PROVIDE AN AREA FOR CONCRETE WASH DOWN AND EQUIPMENT
FUELING IN ACCORDANCE WITH GSWCC. CONTRACTOR TO COORDINATE EXACT LOCATION
WITH NPDES DEPARTMENT DURING PRECONSTRUCTION MEETING. CONTROL OF OTHER
SITE WASTES SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTER, AND
SANITARY WASTES THAT MAY CAUSE ADVERSE IMPACTS TO WATER QUALITY IS ALSO
REQUIRED BY THE GRADING PERMITTEE. LOCATION OF AND/OR NOTES REFERRING TO
THESE BMP'S SHALL BE SHOWN ON THE EPSC PLAN.
14. THE SITE SHALL BE STABILIZED WITHIN 14 DAYS AFTER CONSTRUCTION HAS
TEMPORARILY/PERMANENTLY CEASED.
15. VEGETATION AND EROSION PREVENTION AND SEDIMENT CONTROL MEASURES THAT ARE
AFFECTED BY CONSTRUCTION SHALL BE REPAIRED OR REPLACED WITHIN 7 DAYS.
UTILITY NOTES
1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND INVERTS OF ALL EXISTING UTILITY
LINES AND STRUCTURES (INCLUDING STORM DRAINAGE PIPES OR STRUCTURES) BEFORE
THE COMMENCEMENT OF CONSTRUCTION.
2. CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS, AND PAY ANY
APPLICABLE FEES.
3. IN THE EVENT OF ANY DISCREPANCIES AND/OR ERRORS FOUND IN THE DRAWINGS, OR IF
PROBLEMS ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL BE
REQUIRED TO NOTIFY THE ENGINEER BEFORE PROCEEDING WITH THE WORK. IF ENGINEER
IS NOT NOTIFIED, THE CONTRACTOR SHALL TAKE RESPONSIBILITY FOR THE COST OF ANY
REVISION.
4. THE CONTRACTOR IS TO VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES, TAKE
CARE TO PROTECT UTILITIES THAT ARE TO REMAIN, REPAIR ANY DAMAGE ACCORDING TO
LOCAL STANDARDS AND AT THE CONTRACTOR'S EXPENSE, AND COORDINATE ALL
CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY.
5. CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN THE USE OF EQUIPMENT IN AND
AROUND OVERHEAD AND UNDERGROUND ELECTRICAL WIRES AND SERVICES. IF AT ANY
TIME IN THE PURSUIT OF THIS WORK THE CONTRACTOR MUST WORK IN THE CLOSE
PROXIMITY OF THE ABOVE NOTED WIRES, THE ELECTRIC COMPANY SHALL BE CONTRACTED
PRIOR TO SUCH WORK AND THE PROPER SAFETY MEASURES IN THE PROJECT AREA
SHOULD BE MADE BY THE CONTRACTOR PRIOR TO THE INITIATION OF CONSTRUCTION.
6. THE OWNER AND ENGINEER DO NOT ASSUME RESPONSIBILITY FOR THE POSSIBILITY THAT,
DURING CONSTRUCTION, UTILITIES OTHER THAN THOSE SHOWN MAY BE ENCOUNTERED OR
THAT ACTUAL LOCATION OF THOSE SHOWN MAY BE DIFFERENT FROM LOCATIONS
DESIGNATED ON THE CONTRACT DRAWINGS. IN AREAS WHERE IT IS NECESSARY THAT
EXACT LOCATIONS BE KNOWN OF UNDERGROUND UTILITIES, THE CONTRACTOR SHALL, AT
HIS OWN EXPENSE, FURNISH ALL LABOR AND TOOLS NECESSARY TO EITHER VERIFY AND
SUBSTANTIATE OR DEFINITELY ESTABLISH THE POSITION OF UNDERGROUND UTILITY LINES.
GENERAL NOTES
PROJECT DESCRIPTION:
THESE DRAWINGS ARE PART OF AN OVERALL UPGRADE TO THE EXISTING CONVEYANCE STORM
WATER DRAINAGE SYSTEM THAT PRIMARILY SERVES THE PARK CONSTRUCTION.
1. THE FOLLOWING NOTES ARE APPLICABLE TO ALL CIVIL DOCUMENTS.
2. THE CONTRACTOR SHALL USE MATERIALS AND EMPLOY CONSTRUCTION METHODS IN
ORDER TO COMPLY WITH THE DRAWINGS AND SPECIFICATIONS. WHERE A CONFLICT
OCCURS, THE STRICTEST DESIGN SHALL GOVERN. ENGINEER'S REVIEW OF SHOP
DRAWINGS, PRODUCT DATA, ETC. DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING
WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INFORM THE OWNER AND
ENGINEER IN WRITING OF ANY SPECIFIC DEVIATIONS AND OBTAIN OWNER'S AND
ENGINEER'S WRITTEN APPROVAL OF THE SPECIFIC DEVIATION.
3. THE CONTRACTOR SHALL CONFORM TO ALL LOCAL CODES AND OBTAIN ALL PERMITS AND
BOND, IF REQUIRED, PRIOR TO BEGINNING WORK.
4. THE SITE LAYOUT IS BASED ON THE CONTROL POINTS AS NOTED.
5. DO NOT SCALE DRAWING AS THEY ARE REPRODUCTION AND SUBJECT TO DISTORTION.
6. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE
STARTING ANY WORK. DAMAGES TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE
REPAIRED ACCORDING TO LOCAL STANDARDS AND SPECIFICATIONS AT THE CONTRACTOR'S
EXPENSE. COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY.
7. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFICATIONS AND LIAISON WITH UTILITY
COMPANIES IN THE PROCESS OF LOCATING, RELOCATION AND TIE-IN TO PUBLIC UTILITIES.
ALSO, CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL INSPECTORS A MINIMUM 48
HOURS PRIOR TO ANY CONSTRUCTION ACTIVITIES, VERIFY WITH GOVERNING AGENCY
8. ALL DAMAGE TO EXISTING ASPHALT PAVEMENT TO REMAIN, WHICH RESULTS FROM NEW
CONSTRUCTION, SHALL BE REPLACED WITH LIKE MATERIALS AT CONTRACTOR'S EXPENSE.
9. THESES PLANS, PREPARED BY BARGE DESIGN SOLUTIONS., DO NOT EXTEND TO OR
INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION CONTRACTOR OR
ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE
SEAL OF BARGE DESIGN SOLUTIONS REGISTERED PROFESSIONAL ENGINEER HEREON DOES
NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT MAY NOW OR HEREAFTER BE
INCORPORATED INTO THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE
OR OBTAIN THE APPROPRIATE SAFETY SYSTEMS WHICH MAY BE REQUIRED BY U.S.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) AND /OR LOCAL
REGULATIONS.
10. ALL HANDICAP PARKING SPACES ARE TO RECEIVE A HANDICAP SIGN AND HANDICAP
SYMBOL PAINTED ON THE PAVEMENT. STALLS ADJACENT TO 8' WIDE STRIPED AISLES ARE
TO RECEIVE A "VAN ACCESSIBLE" SIGN IN ADDITION TO THE ABOVE.
11. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS
DURING CONSTRUCTION.
12. UNLESS NOTED, SUBMIT SHOP DRAWINGS OF ALL FABRICATED MATERIALS FOR REVIEW.
DESIGN DRAWINGS SHALL NOT BE REPRODUCED FOR USE AS SHOP DRAWINGS.
13. ALL REQUIRED TESTING REPORTS SHALL BE AVAILABLE AT THE JOB SITE.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS-BUILT
INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE
COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE
FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION
TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA SHALL BE COLLECTED BY
A STATE OF GA PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED AND
PAID FOR BY THE CONTRACTOR.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING VEGETATION
DURING CONSTRUCTION. THE COST TO REPLACE OR RESTORE VEGETATION SHALL BE THE
CONTRACTOR'S RESPONSIBILITY.
16. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ON COPY OF THE
CURRENT CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, SPECIAL
CONDITIONS AND COPIES OF ANY REQUIRED PERMITS.
17. ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A
LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL
AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL
ABANDONMENT PERMITS REQUIRED.
18. ANY WELLS DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO
THE OWNER AND THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER
DISCOVERY IS MADE. REMEDIATION OF THE WELL WILL BE DETERMINED AT THAT TIME.
GRADING NOTES
1. ALL STORMWATER PIPES, STRUCTURES, AND APPURTENANCES SHALL BE INSTALLED IN
ACCORDANCE WITH STANDARD SPECIFICATIONS AND DETAILS.
2. NO TREES ARE TO BE REMOVED AND/OR VEGETATION DISTURBED EXCEPT AS NECESSARY
FOR GRADING PURPOSES AND ONLY AS APPROVED BY OWNER'S REPRESENTATIVE AND
CITY ENGINEER. SEE LANDSCAPE PLANS FOR TREES TO REMAIN.
3. STRIP ALL TOPSOIL AND OTHER DELETERIOUS MATERIALS AS PER SOIL CONSULTANT'S
GEOTECH REPORT, TO ACCOMPLISH GRADING AS INDICATED ON THE PLANS. STOCKPILE
TOPSOIL IN AREA(S) DESIGNATED BY THE OWNER FOR REUSE IN LANDSCAPE ISLANDS AND /
OR GREEN SPACE AREAS.
4. ALL TOPSOIL, FILL MATERIAL, EXISTING FOUNDATIONS, UTILITIES, UNDER GROUND TANKS, PAVEMENT,BASE AND ANY OTHER DELETERIOUS MATERIALS SHALL BE COMPLETELY
REMOVED FROM WITHIN THE BEARING ZONE BELOW THE STRUCTURE.
5. IN NO CASE SHALL SLOPE HEIGHT, SLOPE INCLINATION, OR EXCAVATION DEPTH, INCLUDING
TRENCH CONSTRUCTION, EXCEED THOSE SPECIFIED IN LOCAL, STATE AND FEDERAL
REGULATIONS, SPECIFICALLY THE CURRENT OSHA HEALTH AND SAFETY STANDARDS FOR
EXCAVATIONS (29 CRF PART 1926) SHALL BE FOLLOWED
6. ALL GRADED AREAS, INCLUDING SLOPES, ARE TO BE MULCHED AND SEEDED AS SOON AS
POSSIBLE AFTER GRADING IS COMPLETED.
7. CONSTRUCT EROSION CONTROL AS SHOWN ON DRAWINGS PRIOR TO BEGINNING GRADING
OPERATIONS.
8. ALL NEW STRUCTURES AND EXISTING STRUCTURES SHALL HAVE SEDIMENT REMOVED
PRIOR TO ACCEPTANCE.
9. SILT BARRIERS SHALL BE CLEANED OF ACCUMULATED SEDIMENT WHEN APPROXIMATELY
50% FILLED WITH SUCH SEDIMENT.
10. ALL DIMENSIONS AND LOCATIONS OF TEMPORARY EROSION AND WATER POLLUTION
CONTROL DEVICES SHALL BE SUBJECT TO ADJUSTMENT AS DESIGNATED BY THE OWNER'S
REPRESENTATIVE.
11. WHEN THE TEMPORARY SOIL EROSION AND WATER POLLUTION DEVICES ARE NO LONGER
REQUIRED FOR THE INTENDED PURPOSE IN THE OPINION OF THE OWNER'S
REPRESENTATIVE THEY SHALL BE REMOVED.
12. REPLACE SILT BARRIERS WHEN CONDITIONS WARRANT AND AS DIRECTED BY THE OWNER'S
REPRESENTATIVE AND CITY ENGINEER.
13. CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS PRIOR TO BEGINNING WORK.
14. CONTOUR LINES AND SPOT ELEVATIONS ARE THE RESULT OF A DETAILED ENGINEERING
GRADING DESIGN AND REFLECT A PLANNED INTENT WITH REGARD TO DRAINAGE AND
MOVEMENT OF MATERIALS. CONTOUR LINES AND SPOT ELEVATIONS ARE BASED ON
ESTABLISHED PROJECT BENCHMARK, WHICH THE CONTRACTOR SHALL VERIFY WITH
TOPOGRAPHY SURVEY. SHOULD THE CONTRACTOR HAVE ANY QUESTION OF THE INTENT
OR ANY PROBLEMS WITH CONTINUITY OF GRADES, THE ENGINEER SHOULD BE CONTACTED
IMMEDIATELY PRIOR TO BEGINNING WORK.
15. ALL UN-SURFACED AREA DISTURBED BY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .