Addendum No_ 2 Concrete.pdf
PDF 195 KB Posted
- Solicitation number
- PE-77098-NONST-2026-000000013
- Issued by
- Lamar County, Georgia
About this file
This is an addendum to a concrete contract for the Lanier County Recreation Complex 2025 Concrete Contract issued by Lanier County. The document amends the original contract documents with three substantive modifications and one procedural clarification. The bid date has been moved to Wednesday, January 28, 2026 at 11:15 AM. A revised bid form has been provided that includes a previously omitted line item for imported fill material with a quantity of 75 cubic yards designated for bidding purposes, though this quantity will be adjusted during construction based on actual material requirements. All concrete joints, including expansion and sawed joints, shall be sealed with sealant per section 833 of the Georgia Department of Transportation specifications. A Performance and Payment bond equal to 100% of the contract amount will be required upon bid award in accordance with the terms specified on the Notice of Award form.
No additional information regarding pricing terms, funding sources, set-asides, or other financial requirements is provided in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No_ 1 Concrete.pdf | ||
| Lanier County 2025 Recreation Complex Bid Doc.pdf | ||
| Concrete Bid Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3998 Inner Perimeter Road, Suite C • P.O. Box 2830 • Valdosta, GA 31604 • Telephone: 229.253.0900 • Fax: 229.253.1842 • E-mail: lea@lea-pc.com
ADDENDUM NO. 2
Lanier County Recreation Complex 2025
Concrete Contract
January 22, 2026
Contract Documents for the above project are hereby amended as follows.
Clarifications:
1. The Bid Date will be moved to Wednesday, January 28, 2026 at 11:15.
2. The line item for imported fill material was omitted from the previous bid form. A revised bid form is attached with the line item for imported fill material included. A quantity of 75 CY is included for purposes of the bid. This quantity will be adjusted during construction based on actual imported fill material needed to complete the work.
3. As shown on the concrete joint detail, all joints (expansion and sawed) shall be sealed with sealant per section 833 of the GDOT Specifications.
4. As indicated on the Notice of Award form, a Performance and Payment bond in the amount of 100% of the contract amount will be required to be provided to the owner after the bid is awarded per the requirements indicated on the Notice of Award form.
End of Addendum