This is Addendum No. 2 issued by the Palm Beach County Water Utilities Department for Project No. PBCWUD 26-016, addressing Electrical Instrumentation and Telemetry Continuing Engineering Services. The addendum clarifies a procedural question regarding the Qualification Questionnaire formula required for both prime consultants and subconsultants in their scope of services submissions. The document confirms that the correct formula is (A) = (B) + (C), where (A) represents total scope, (B) represents local work, and (C) represents non-local work. The questionnaire form should be obtained from the Engineering and Public Works-Roadway production website. The addendum was issued on June 29, 2026, and is signed by Krystin Berntsen, P.E., PMP, Deputy Director of the Palm Beach County Water Utilities Department.
No additional information regarding pricing terms, set asides, contract award dates, contract term, funding sources, or other financial details is provided in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
PALM BEACH COUNTY WATER UTILITIES DEPARTMENT
ELECTRICAL INSTRUMENTATION AND TELEMETRY
CONTINUING ENGINEERING SERVICES
Project No. PBCWUD 26-016
QUESTIONS AND ANSWERS:
Q1 – Regarding the Qualification Questionnaire for both Primes and Subconsultants. Under the “Scope of Services” section on the first page, there is a note that states (A) + (B) = (C) [(A) will only equal 100% if there are no subconsultants]. This formula would translate to Total + Local = Non-Local. I believe this formula is incorrect and should read (B) + (C) = (A). This would translate to Local + Non Local = Total. Could you please review and advise what the correct formula should be? If the formula is found to be incorrect, will the form be revised or should we continue to use the current form for the submittal?
A1 – The Qualification Questionnaire for both Primes and Subconsultants under “Scope of Service” shows the formula to be (A)= (B) + (C); use the forms available from the Engineering and Public Works-Roadway production website.
Dated this 29th day of June 2026
Palm Beach County Water Utilities Department
Krystin Berntsen
Krystin Berntsen, P.E, PMP Deputy Director