Addendum No_ 1.pdf
PDF 130 KB Posted
- Solicitation number
- PE-66365-NONST-2026-000000030
- Issued by
- Cobb County, Georgia
About this file
This Addendum No. 1 and Questions and Responses document relates to the Quarles 6 MG Clearwell No. 1 Tank Concrete Repairs and Coating Project issued by the Cobb County-Marietta Water Authority in Georgia. The project involves concrete repairs and protective coating application for a water storage tank. Pre-qualification applications for bidders must be submitted by 2:00 p.m. local time on January 30, 2026, to the Administration and Engineering Office at 1170 Atlanta Industrial Drive, Marietta, Georgia 30066. Bids are due by 2:00 p.m. local time on February 26, 2026, at the same location. All bidders must acknowledge receipt of this addendum and all other addenda as part of their bid submission, with failure to do so resulting in bid rejection.
The addendum clarifies specifications regarding surface preparation and containment systems for the project. Key modifications include revised requirements for Class 2W water blasting methods, allowing the containment system top to remain open to the atmosphere when water blasting is used exclusively on all tank surfaces, while maintaining full wall height containment extending a minimum of six feet above tank walls. The addendum also establishes contractor responsibilities for hazardous materials testing, specifically lead-based paint (LBP) detection and abatement, with testing costs included in the lump sum item and removal costs charged against the Owner Directed Work Allowance on a time and materials basis. Bidders must hold a valid Georgia General Contractor's license at the time of bid submission and must submit pre-qualification documentation including the Statement of Bidder's Qualifications with supporting evidence of meeting specified qualifications under their officially registered company name.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No_ 3.pdf | ||
| Addendum No_ 2.pdf | ||
| 00020 _ Advertisement for Bids.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUARLES 6 MG CLEARWELL No. 1 CONCRETE REPAIRS AND COATING PROJECT Addendum No. 1 (01/26/2026)
ADDENDUM NO. 1
ISSUE DATE: January 26, 2026 for
QUARLES 6MG CLEARWELL No. 1 TANK
CONCRETE REPAIRS AND COATING PROJECT
COBB COUNTY-MARIETTA WATER AUTHORITY
Bids to be received until 2:00 p.m., local time, February 26, 2026, at the office of Cobb County-Marietta Water Authority, 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066
Applications for Pre-qualification of Bidders will be received at the Administration and Engineering Office of the Cobb County-Marietta Water Authority, 1170 Atlanta Industrial
Drive, Marietta, Georgia 30066 until 2:00 p.m., local time, January 30, 2026.
Receipt of this addendum, and all other addenda, should be acknowledged as part of your Bid (refer to Section 00410, Bid Form). Failure to acknowledge receipt of the addenda may result in rejection of the Bid. This addendum forms a part of the Contract Documents.
Please note the following CHANGES to the above referenced Contract Documents as follows:
SPECIFICATIONS
1. Section 01560, Page 5, Paragraph 2.01.E.
CHANGE, “Containment system is not required for surface preparation activities for tank dome surfaces for Class 2W for water blasting methods. The containment system for surface preparation of the walls shall extend a minimum of six feet above the top of tank walls.”
TO
“Where Class 2W water blasting methods are exclusively used for preparation of all tank surfaces the containment system shall be provided full height of the walls extending a minimum of six feet above the top of tank walls and the top of the tank may be left open to the atmosphere.”
Addendum No. 1 (01/26/2026)
2. Section 09900, page 9, Paragraph 3.02.J.
ADD the following two paragraphs 7 and 8 at the end of 3.02.J.
“7. The Contractor shall determine if any hazardous materials are present on surfaces to be painted, including testing for the presence of Lead Based Paint (LBP). This shall be performed as part of the Lump Sum Item 1 in the Contractor’s Bid Proposal.”
“8. The Contractor shall provide all labor, equipment, tools, materials, and permits to satisfactory complete the work in this section as it relates to the removal and disposal of lead-based paints (LBP) in accordance with Federal, State, and Local laws, regulations and ordinances. Payment for abatement of LBP will be from the Owner Directed Work Allowance (Item 2 in the Contractor’s Bid Proposal) on a time and materials basis in accordance with the General Conditions.”
DRAWINGS
1. No changes.
END OF ADDENDUM NO. 1
Attachments: Questions and Responses No. 1.
Questions and Responses No. 1 (01/26/2026) Page 1 of 2
QUESTIONS AND RESPONSES NO. 1
ISSUE DATE: January 26, 2026 for
QUARLES 6MG CLEARWELL No. 1 TANK
CONCRETE REPAIRS AND COATING PROJECT
COBB COUNTY-MARIETTA WATER AUTHORITY
QUESTION 1: Section 00200 Article 3, 3.3 states bidder shall be licensed General Contractor in the State of GA. Will a GC License be required since this is a coating project and not a Utility Contractor project?
Q1 RESPONSE: Yes, Bidders shall be a licensed General Contractor in the State of Georgia at the time Bids are submitted.
QUESTION 2: Can you confirm if we will need a GA General Contractor's license for this project or will we just need to hold a general license registered with the Secretary of State to do business in the state?
Q2 RESPONSE: See response to Question 1.
QUESTION 3: I see that a GC license is being required for this project. We have never needed a GC license for a tank rehabilitation project in Georgia before. Is this something that can be waived for this project with proper references?
Q3 RESPONSE: See response to Question 1.
QUESTION 4: In section 01560 under 1.03 A 1. 2. 3. & 4. calls out SSPC, CFR and ANSI standards for abating lead containing coatings, Is this a lead abatement project?
Q4 RESPONSE: The contractor is responsible for determining if any hazardous materials are present, see Addendum No. 1.
QUESTION 5: In section 01560 under 2.01 calls out for full tank containment. Will full containment of tank be required if wet blasting process is used?
Q5 RESPONSE: Where Class 2W water blasting methods are exclusively used the containment system is still required but the top of the containment system may be open to the atmosphere, see Addendum No. 1.
Questions and Responses No. 1 (01/26/2026) Page 2 of 2
QUESTION 6: What should be submitted as part of the Bidder’s Pre-qualification Application.
Q6 RESPONSE: Submit the Statement of Bidder’s Qualifications provided in Section 00415 along with supporting documentation and evidence meeting the requirements of Article 3.1 and 3.2 of Section 00200, Instructions to Bidders. The Statement of Qualifications and Bids should be submitted under the name of the company that is officially registered with the Georgia Secretary of State, not as a “dba”.
END OF QUESTIONS AND RESPONSES NO. 1