ADDENDUM NO 1 - 26-026_Signed.pdf
PDF 189 KB Posted
- Solicitation number
- RFP 720 26-026 3
- Issued by
- Palm Beach County, Florida
About this file
This is an addendum to a continuing services contract issued by the Palm Beach County Water Utilities Department for Emergency and Disaster Mitigation and Recovery Engineering services under Project No. PBCWUD 26-026. The addendum revises the pre-proposal meeting date from Wednesday, June 3, 2026 to Monday, June 8, 2026, maintaining the meeting time of 11:00 a.m. local time. The non-mandatory meeting will be held at the Central Region Operations Center, Operations and Maintenance Building, Conference Room 55, located at 8100 Forest Hill Boulevard, West Palm Beach, Florida 33413. All respondents are encouraged to attend and should allocate sufficient time to ensure punctual arrival.
The addendum was issued on June 3, 2026, by Jane House, P.E., LEED AP, Director of Engineering for the Palm Beach County Water Utilities Department. No pricing terms, set-asides, contract duration specifics, or funding information are detailed in this addendum document, as it serves solely to notify bidders of the scheduling change for the pre-proposal conference.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
PALM BEACH COUNTY WATER UTILITIES DEPARTMENT
EMERGENCY AND DISASTER MITIGATION AND
RECOVERY ENGINEERING CONTINUING SERVICES
Project No. PBCWUD 26-026
TO ALL BIDDERS AND OTHERS CONCERNED:
The following section of the advertisement is revised as follow:
A non-mandatory pre-proposal meeting will be held on Wednesday, June 3, 2026 Monday, June 8, 2026, at 11:00 a.m. local time at the Central Region Operations Center, Operations and Maintenance Building, Conference Room 55, 8100 Forest Hill Blvd, West Palm Beach, FL 33413. All Respondents are encouraged to attend this meeting. Attendees shall provide sufficient time to ensure arrival prior to the indicated time.
Dated this 3rd day of June 2026
Palm Beach County Water Utilities Department
Jane House, P.E., LEED AP Director of Engineering
| 2026-06-03T15:07:42+0000 | |
| Certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .