Addendum 5 - ToHS - UCWRF - Lab and Ops Building_06302025.pdf
PDF 4 MB Posted
- Solicitation number
- 440-ITB# 22-010A
- Issued by
- Wake County, Hiddenite CDP, North Carolina
About this file
Addendum No. 5 is issued by the Town of Holly Springs for the Utley Creek Water Reclamation Facility (WRF) Lab and Operators Building project, modifying the original bid documents for a single-prime construction contract. The addendum includes several key updates: replacement of the G004 Life Safety Plan sheet, clarifications on cabinet and counter heights for A823 and A824 drawings, addition of Section 09 68 13 for carpet specifications, and revisions to the Wastewater Treatment Plant Piping Schedule in Section 40 06 20. The document provides detailed instructions for bidders, emphasizing that these changes become part of the bid documents and take precedence over previously issued materials.
The addendum introduces specific technical specifications, including carpet requirements with a textured patterned loop construction, 15-year stain-resistant warranty, and detailed installation guidelines. The piping schedule provides comprehensive information on pipe materials, joint types, design pressures, and installation methods for various pipe systems including potable water, reclaimed water, roof and storm drains, and sanitary sewer. These modifications appear to refine the project's technical details without significantly altering the overall project scope, which remains a 7,900 square foot administrative building at the Utley Creek WRF site in Holly Springs, North Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 5
Utley Creek WRF - Lab & Operators Building Project
GENERAL:
Response to Bidder Questions:
1. Provide additional information on tile type and size.
a. Response: Refer to Specification 09 30 13, 2.02C for tile sizes. See Sheet A827 for tile Make/Model.
2. Provide information form BOD Incubator.
a. Response: Refer to Addendum 4, Sheet A819 and A820: Mark EQ-5.
SPECIFICATIONS:
ADD SECTION 09 68 13 – CARPET
Add Attachment #4 to the Project Manual.
SECTION 40 06 20 – PROCESS PIPE, VALVE, AND GATE SCHEDULE
Revise the Wastewater Treatment Plant Piping Schedule in accordance with Attachment #5.
DRAWINGS:
Replace sheet withG004 Attachment #1.
Refer toA823 Attachment #2 for clarification on counter height.
Refer toA824 Attachment #3 for clarification on counter height.
ATTACHMENTS:
Attachment #1: G004: Life safety Plan Attachment #2: A823: Cabinet Heights Attachment #3: A824: Counter Heights Attachment #4: Section 09 68 13 - Carpet Attachment #5: Section 40 06 20 - Process Pipe, Valve, and Gate Schedule cabnet
CR
CR
CRCR
CRCR
CR
CR
ENTRY/ADMIN
CONF ROOM
SCADA/CONTROL
BREAK ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PROC. CTRL
LAB
LAUNDRY & JANITOR
COVERED PATIO
LAB STAFF
HALLWAY
STORAGE
CLOSET
CABINETS
WORKSTATIONS
ELECTRICAL
LAB SUPERVISOR
UTILITY
LAB STORAGE
WOMENS LOCKER
COVERED
ENTRY
CLOSET
COPY
MENS LOCKER
UNISEX 1
UNISEX 2
DROP OFF
MENS
WOMENS
RECORDS
SERVER
EXIT
EXIT/
PANIC
EXIT
EXIT/
PANIC
EXIT
EXIT
EXIT/
PANIC
EXIT
EXIT
FE
FE
FE FE FE
FE
MAX PATH OF TRAVEL 103'-0"
SHOWER 1
SHOWER 2
834CO2
36"/0.2=180 OCCUPANTS 36"/0.2=180 OCCUPANTS
36"/0.2=180 OCCUPANTS
36"/0.2=180 OCCUPANTS36"/0.2= 180 OCCUPANTS
36"/0.2=180 OCCUPANTS
36"/0.2=
180 OCCUPANTS
36"/0.2=175 OCCUPANTS
PANIC
PANIC
PANIC
PANIC
DRINKING WATER
ANALYSIS
ACTUAL OCCUPANTS: 79 TOTAL
8 EXIT DOORS
79 OCCUPANTS/ 7 EXIT DOORS= 12 ACTUAL OCCUPANTS PER DOOR
12 ACTUAL OCCUPANTS
12 ACTUAL OCCUPANTS
12 ACTUAL OCCUPANTS 12 ACTUAL OCCUPANTS
12 ACTUAL OCCUPANTS
12 ACTUAL OCCUPANTS
12 ACTUAL OCCUPANTS
LIFE SAFETY LEGEND:
DIRECTION OF TRAVEL
MOST REMOTE POINT
ENTRANCE/EXITEXIT RECESSED DRY CHEMICAL FIRE EXTINGUISHERFE
FIRST AID CABINET
PROVIDE PANIC HARDWAREPANIC CARBON DIOXIDE FIRE EXTINGUISHERCO2OCCUPANT LOAD
DOOR MAXIMUM OCCUPANT LOAD
DOOR HARDWARE
CLEAR EGRESS WIDTH
DIRECTION OF TRAVEL
DESIGNED BY:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
REV ISSUED FOR DATE BY
H&S ENGINEERING AND ARCHITECTURE PC
4011 WESTCHASE BOULEVARD, SUITE 500
RALEIGH, NORTH CAROLINA 27607
LICENSE NO.: 54078
TELEPHONE NO.: (919) 833-7152
TOWN OF HOLLY SPRINGS
HOLLY SPRINGS, NORTH CAROLINA
UTLEY CREEK WRF
LAB & OPERATORS BUILDING
D. WANKMULLER
0 1/2" 1"
ISSUED FOR
CONSTRUCTION
APRIL 2025
31407-006
A u to d e s k D o c s /3
-0 U tl e y C re e k W
R F
M
G D
E x p a n s io n /3
-0 -8
-A
D M
-A .r v t
/2
/2
:4 :2
P
M
G004
S. BARRENTINE
W. RUSSELL
J. ROUSSEAU
LAB AND OPERATORS BUILDING
ARCHITECTURAL
LIFE SAFETY PLAN
1/8" = 1'-0"
LIFE SAFETY PLAN
N
DEVELOPMENT SERVICES PROJECT NUMBER:
24-DP-06/PLDP202400175
NC 2018 BUILDING OCCUPANCIES
B: BUSINESS OCCUPANCY
WHERE NOTED, DOORS SHALL BE FURNISHED
WITH PANIC HARDWARE.
OCCUPANT LOAD:
ACTUAL=
7815 S.F./OCCUPANT LOAD FACTOR OF 100
7815 S.F./100=79 OCCUPANTS TOTAL
3 ADDENDUM 5 6/27/25
MMayes Text Box
ADDENDUM NO. 5
ATTACHMENT #1
D A
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
C T
R A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
A823
1_______
A823
2_______
+/- 2" FILLER 36" 36" 36"
+/- 2" FILLER COLUMN
17 1/4"
+/- 2" FILLER
36" 36" +/- 2" FILLER
1/2" = 1'-0"
DISPLAY ELEVATION
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
WALL CABINETS WHERE
INDICATED WITH 3/4"
ADJUSTABLE SHELVES
QUARTZ
COUNTERTOP
ADJUSTABLE 3/4"
SHELVES
12"
"4" BASE
/2
25"
CEILING AS
SCHEDULED
SHELF CLIPS, 1" OC
SHELF CLIPS, 1" OC
SOFT CLOSE
CABINET DOORS
STAINLESS
STEEL PULLS
CERAMIC TILE
BACKSPLASH
WALL CABINETS WHERE
INDICATED WITH 3/4"
ADJUSTABLE SHELVES
QUARTZ
COUNTERTOP
12"
/2 " 25"
CEILING AS
SCHEDULED
SHELF CLIPS, 1" OC
ADA COMPIANT
FULL HEIGHT
SOFT CLOSE
CABINET DOORS
WITH TOEKICK
STAINLESS
STEEL PULLS
KITCHEN SINK AND
FAUCET, SEE
PLUMBING DWGS
CERAMIC TILE
BACKSPLASH
WALL CABINETS WHERE
INDICATED WITH 3/4"
ADJUSTABLE SHELVES
QUARTZ
COUNTERTOP
12"
V A
R
IE
S S
E E
E L
E V
A T
IO
N
S
"4" BASE
/2
25"
CEILING AS
SCHEDULED
SHELF CLIPS, 1" OC
SOFT CLOSE
DRAWERS
STAINLESS
STEEL PULLS
CERAMIC TILE
BACKSPLASH
DETAIL
3/4" = 1'-0" A822
BREAKROOM CABINET SECTION
DETAIL
3/4" = 1'-0" A822
BREAKROOM SINK CABINET SECTION
DETAIL
3/4" = 1'-0" A824
BREAKROOM DRAWER CABINET SECTION
3 3
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
18"24"
2"
12"24"
18"24"24"2"
60" W TACKBOARD
A824
1_______
A824
3_______
1/2" = 1'-0"
BREAK ROOM NORTH WALL
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
+/- 2" FILLER 30" +/- 30" RANGE 18" 36" 24" 15" 21"
+/- 2" FILLER 30" 30" 24" 30" 18" 30" 1/2" 12"
A824
1_______
A824
2_______
1/2" = 1'-0"
BREAK ROOM WEST WALL
31407-006: JUNE 2025 09 68 13-1 TOWN OF HOLLY SPRINGS
UTLEY CREEK WRF
LAB & OPERATORS BUILDING
SECTION 09 68 13
CARPET
PART 1 – GENERAL
1.1 THE REQUIREMENT
A. Furnish all labor, materials, equipment, and appliances required for the complete execution of Work as shown on the Drawings and specified herein.
1.2 REFERENCE SPECIFICATIONS, CODES AND STANDARDS.
A. ASTM E 84 Test Method for surface Burning Characteristics of Building Materials
B. Carpet and Rug Institute's "Carpet Specifier's Handbook"
1.3 SUBMITTALS
A. In accordance with the procedures and requirements set forth in Section 01 33 00 Submittal Procedures, submit the following:
1. Carpet (minimum of 12 colors) and metal edge samples. Patterns, textures and colors shall be as selected by the Engineer. Up to three colors may be selected.
2. Manufacturer's literature on care, stain removal, cleaning and maintenance.
1.4 QUALITY ASSURANCE
A. Carpet
1. Product of a manufacturer who has specialized in the manufacturing of similar products for a period of at least 5 years or more in the production of materials of the kind and quality specified.
B. Installer
1. Install carpet by an experienced installer. Submit the following evidence of qualifications of installer:
a. Continuously in business for minimum of 5 years.
b. Experience in commercial carpet installations of comparable size and type specified.
ATTACHMENT #4
MMayes Text Box
31407-006: JUNE 2025 09 68 13-2 TOWN OF HOLLY SPRINGS
C. Test Requirements
1. Critical Radiant Flux test NFPA 253 – Passes, Class 1.
2. Specific Optical Density of Smoke Generation test report ASTM E-662 – Passes less than 450.
1.5 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Deliver carpet and accessories in original, unbroken packages, containers, or wrappings, bearing the name of the manufacturer along with identification markings.
B. Store materials in an area that is protected from the elements and in a manner recommended by the manufacturer.
PART 2 – PRODUCTS
2.1 CARPET
A. General requirements:
1. Construction Textured Patterned Loop
2. Gage 5/64 or better
3. Stitches per Inch 10 minimum
4. Pile Height 3/32-inch minimum
5. Face Yarns 3 ply (minimum) continuous filament, solution dyed nylon with static protection and soil resistant
6. Backing as recommended by carpet manufacturer.
7. Weight 16 ounce per square yard minimum
8. Size 24”x24” as shown on Drawings
9. Color Buffer
10. Warranty: 15 year stain resistant warranty, minimum
B. Basis of Design: Mannington Commercial Top Shelf, Optic Hush or equal product by Mohawk, Milliken, or Interface.
31407-006: JUNE 2025 09 68 13-3 TOWN OF HOLLY SPRINGS
2.2 ACCESSORIES
A. Accessories: Type recommended and approved by carpet manufacturer.
B. Edging: An extruded aluminum, heavy-duty type. Color and type as selected by the Engineer from submitted samples.
C. Seam Adhesive: Moisture resistant seaming adhesive approved by manufacturer.
D. Fillers and Leveling Materials: As recommended by manufacturer.
PART 3 – EXECUTION
3.1 GENERAL
A. Surfaces to receive carpeting shall meet minimum requirements established in the printed recommendations of the carpeting manufacturer. Determine actual area dimensions and surface conditions and correct surface defects before starting installation.
3.2 FLOOR SURFACE PREPARATION
A. Immediately prior to the installation of carpet, prepare sub-flooring to be free of defects, irregularities, droppings, grease, oil, paint, varnish, hardeners, sprinkled cement, plaster, or any material that would interfere with the proper adhesion between the carpet and sub-floors surface. Sub-floors shall be level and free of irregularities to assure one constant floor height after carpet is installed. Level irregularities by a process of grinding high spots and filling low spots with a suitable filling and leveling material for floor patching.
3.3 CARPETING INSTALLATION
A. Install carpet in accordance with referenced specifications and manufacturer's instructions and recommendations for seam locations, uniformity of direction and lay of pile.
B. Prior to installation, sweep the floor using a non-oil base sweeping compound.
C. Install carpet within allowable temperature range stated by the manufacturer.
D. Cut evenly along walls. Fit evenly around projections and into trim strips. Fit closely and evenly to and through thresholds. Direction of the pile shall be the same.
31407-006: JUNE 2025 09 68 13-4 TOWN OF HOLLY SPRINGS
E. Provide carpet in sizes to eliminate seams as much as possible. Provide fill strips of not less than 36-inches in width and 36-inches in length. Avoid cross seams. Seams and cross seams shall be salvage edge trimmed and hand sewn or joined by heat tape.
Bond carpet edges and seams against unraveling with seam adhesive. Iron seams flush and tight so joint line is inconspicuous. Fastenings shall be concealed. Finished installation shall be free from tacks, scraps, carpet ripples, scallops and puckers.
F. Extend carpet under open-bottomed obstructions, removable flanges and furnishings and into closets or alcoves of each space or area.
G. Provide cutouts where required and bind cut edges properly where not concealed by protective edge guards.
H. Perform field cuts with straight edge or other acceptable methods to produce a true straight cut. Uneven cuts will be cause for rejection of carpet.
I. Butter edges with seaming cement with taped or sewed seams to provide sufficient strength for stretching and continued stresses over the life of the carpet. Apply seaming cement over stitching on backing, if not taped.
J. Fit carpet to the space before application of adhesive.
K. Install carpet edge guards wherever carpet edge is exposed or abuts thinner finish flooring materials. Anchor edge guards securely to substrate.
3.4 CLEANING AND PROTECTION
A. After installation is complete, remove dirt and debris and clean spots with proper spot remover. Remove loose threads with sharp scissors and vacuum carpet clean.
B. Protect installed carpeting.
C. Remove spots and clean carpet by vacuuming.
END OF SECTION
Attachment #5:
Additions to the Wastewater Treatment Plant Piping Schedule SECTION 40 06 20 – PROCESS PIPE, VALVE, AND GATE SCHEDULE
WASTEWATER TREATMENT PLANT PIPING SCHEDULE
PIPE DESIGNATIONS MATERIAL
BURIED PIPING EXPOSED PIPING DESIGN PRESSURE (PSI)1
TYPE OF
JOINT
CLASS/
DESIGN
TYPE OF
JOINT
CLASS/
DESIGN
HEAT
TRACE2
WORKING SURGE RESTRAINT
FIELD
TEST
PW
POTABLE
WATER
< 4"
PVC / CPVC3
SOCKET SCH 80
SOCKET/
FLANGED
SCH 80 NO
120 N/A 210 180
> = 4" DIP RESTRAINED
PRESSURE
CLASS 350
FLANGED CLASS 53 NO
RCW
RECLAIMED
WATER
< 4"
PVC / CPVC3
SOCKET SCH 80
SOCKET/
FLANGED
SCH 80 NO 100 N/A 175 150
RD ROOF DRAIN PVC / CPVC3 SOCKET SCH 80
SOCKET/
FLANGED
SCH 80 NO N/A N/A N/A N/A
SD
STORM
DRAIN
RCP PUSH-ON CLASS III N/A N/A N/A SECTION 33 24 00
HDPE PUSH-ON
SECTION
33 24 00
N/A N/A N/A SECTION 33 24 00
SS
SANITARY
SEWER
GRAVITY
PVC SOCKET SCH 80 N/A N/A N/A N/A N/A 30 5
MMayes Text Box
| 0077_001 |
| UCWRF_LandO_Addenda 5 |
| LandO Addenda 5 |
| Attachment 1_G004 |
| Attachment 2_A823 |
| Attachment 3-1_A824 |
| Attachment 3-2_A824 |
| Attachment 3-3_A824 |
| Attachment 4_Section 09 6813 Carpet |
| Text1#1#1: 5 |
| Text2#1#1: 2 |
| Text3#1#1: 6/27/2025 |
| Text4#1#1: DW |
| Text5#1#1: A823 |
| Text6#1#1: 1 |
| Text7#1#1: 1 |
| Text1: 5 |
| Text2: 3 |
| Text3: 6/27/2025 |
| Text4: DW |
| Text5: A824-1 |
| Text6: 1 |
| Text7: 3 |
| Text1#1: 5 |
| Text2#1: 3 |
| Text3#1: 6/27/2025 |
| Text4#1: DW |
| Text5#1: A824-2 |
| Text6#1: 2 |
| Text7#1: 3 |
| Text1#1#1#1: 5 |
| Text2#1#1#1: 3 |
| Text3#1#1#1: 6/27/2025 |
| Text4#1#1#1: DW |
| Text5#1#1#1: A824-3 |
| Text6#1#1#1: 3 |
| Text7#1#1#1: 3 |
File details come from the government source that posted it. Updated .